Planning application
Sports Ground, Bull Lane, London, N18 1RA
Works: New dwelling Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ café and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centres). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting (Observations to L.B. Enfield - their planning reference 24/03470/FUL)
As published by the council, reference HGY/2024/3021
Application record
- Reference
- HGY/2024/3021
- Type
- Adjoining Authority Consultation
- Status
- Under Consultation
- Received
- 29 Oct 2024
- Validated
- 29 Oct 2024
- Decision by
- Delegated Decision
- Postcode
- N18 1RA
Timeline
Dates from the published record
-
29 Oct 2024
Received by Haringey
-
23 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 December 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Haringey took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Haringey for determination, against a statutory target of eight weeks. Over the last year Haringey decided outline applications in a median of 43 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Sports Ground Bull Lane London N18 1RA
75% historically approved · decision due ~17 Nov
Details submitted pursuant to reference 24/03470/FUL: enclosure (29) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.
Awaiting decision New dwellingSmall domestic -
Sports Ground Bull Lane London N18 1RA
75% historically approved · decision due ~17 Nov
Details submitted pursuant to reference 24/03470/FUL: landscaping and ecology (9) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.
Awaiting decision New dwellingSmall domestic -
Sports Ground Bull Lane London N18 1RA
75% historically approved · decision due ~17 Nov
Details submitted pursuant to reference 24/03470/FUL: external lighting (30) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting
Awaiting decision New dwellingSmall domestic -
Sports Ground Bull Lane London N18 1RA
75% historically approved · decision due ~1 Sep
Details submitted pursuant to reference 24/03470/FUL: bat survey (Condition 8 in connection with Phase 1) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.
Decided New dwellingSmall domestic -
Sports Ground Bull Lane London N18 1RA
75% historically approved · decision due ~6 Mar
Redevelopment of space for a new indoor sports hall (Use Class E(d)). (OUTLINE All Matters Reserved).
Decided Outline -
Sports Ground Bull Lane London N18 1RA
Details submitted pursuant to reference 24/03470/FUL: artificial grass pitch (16) in respect of construction of a new build four-storey Selby Centre building comprising some 4795sqm (GEA) of multi- functional space for use by a range of community related activities (offices, meeting rooms, restaurant/ cafe and nursery, education, a new community hall and other flexible spaces for hire (Use classes F2(b), F1(a), E(b,d,g)); a new single storey sports pavilion (Class e(d)) comprising some 267.6 sqm (GEA) of floorspace and all associated plant and servicing infrastructure (including energy centre). A new vehicular access from Bull Lane; new/ replacement surface car and minibus parking; a floodlit 3-G playing pitch; a MUGA; a revised sports field layout (cricket and football); an outdoor gym; padel courts; children's play-spaces; community growing space; new wildlife areas and surface water attenuation pond; new and enhanced boundary treatments; enhanced pedestrian/ cycle entrances into the Park and a network of new/ enhanced pedestrian and cycle links within the Park and associated lighting.
Granted New dwelling 5 docsSmall domestic
Other outline applications
In Haringey
-
HGY/2026/2148 Withdrawn
Ashley House, Ashley Road, Tottenham, London, N17 9LZ
Request for an Environmental Impact Assessment (EIA) Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for the redevelopment of the site comprising of two new buildings ranging between 6-24 storeys, with a maximum height of 90m AOD, to accommodate Use Classes C3, E/F2 and Sui Generis, providing approximately 540 shared-living units1 and 87 residential units with provision of non-residential floorspaces on the ground floors to each building. The Proposed Development will be set around an extensive public realm, communal open spaces, landscaping, with associated blue-badge residents parking and ancillary infrastructure.
-
HGY/2026/2329 Awaiting decision
Cannon Factory, Ashley Road, Tottenham, London, N17 9LJ
Request for an Environmental Impact Assessment (‘EIA’) Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended), in relation to the proposed redevelopment at the former Cannon Factory site, between Watermead Way, Ashley Road and Burdock Road, London, N17 9LZ (‘the Site’).
-
HGY/2026/1857 Granted
The O2 Centre 255 Finchley Road,, London,, NW3 6LU
RE-CONSULTATION FOR ENVIRONMENTAL STATEMENT. Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary Conditions I4 (Severability Condition), AD1 (Approved Drawings - Masterplan), AD2 (Approved Drawings - Reserved Matters), AD3 (Approved Drawings - Phase 1), RM1 (Parameter Plans and Development Specification), RM6 (Phasing Plan), RM11 (Reserved Matters - Access Statement), RM21 (Reserved Matters - Total floorspace), D20 (Photo-voltaic Cells), D21 (Phase 1 Long Stay Cycle Parking), D22 (Phase 2 Short Stay Cycle Parking), D24 (Phase 1 Disabled Car Parking), D26 (Phase 1 Fire Safety Implementation of Approved Measures), and M28 (Phase-Wide Lighting Strategy) and the removal of Conditions M6 (Enabling Works) and M7 (Major Utilities Infrastructure) of planning permission ref. 2022/0528/P dated 20 December 2023 for 'Detailed planning permission for Development Plots N3-E, N4, and N5 and Outline planning permission for Development Plots N1, N2, N3, N6, N7, S1 and S8, including demolition of all existing structures and associated works, and redevelopment to include residential development (Class C3), commercial, business and service uses (Class E), local community uses (Class F2), and Sui Generis leisure uses (including cinema and drinking establishments) together with all landscaping, public realm, cycle parking and disabled car parking, highway works and infrastructure within and associated with those Development Plots, in accordance with the Development Specification.?For the avoidance of doubt, the Detailed and Outline planning permission are separate and severable for each of the Plots shown on plan P011 and the description of development on any decision notice issued pursuant to the application would reflect that', to allow for amendments to the Detailed Element (Plots N3-E, N4 and N5) including additional height, alterations to the design, massing and footprint of the buildings; the replacement of Block N4D with a pavilion building; additional residential floorspace (and corresponding reduction in floorspace within Outline Elements); revisions to affordable housing and unit mix and internal layouts; relocation and reduction in community (Class F2) floorspace, additional commercial (Class E(a)) floorspace, reduction in professional services (Class E(c)) floorspace, additional blue badge parking and cycle parking; revised landscaping and additional public realm; and associated works. (Observations to L.B. Camden - their planning reference 2025/0484/P)
-
HGY/2026/1458 Granted
149 Stroud Green Road, London, N4 3PZ
Conversion of a shop into 2 no. units with associated external alterations including new single entrance doors to each unit, new grey metal panel to cover internal dividing wall as well as new flashing and new lighting to fascia board (Observations to L.B. Islington - their planning reference P2026/1090/FUL)
-
HGY/2026/1155 Granted
6 Glover Drive, N18 3HF London
Variation of condition 01 of Ref: 23/02199/FUL to allow an extension of the temporary use for multi-purpose use (Sui Generis) as a cultural and creative events and entertainment space until 20th December 2026 with a reduced operational framework from the period 23rd November to 20th December including a reduced capacity from 15,000 to 10,000, streamlined events schedule restricted to Saturdays and Sundays with curfews of 22:30 and 22:00 respectively, reconfiguration of external operational areas and reduced hours of operation of the loading bay from 07:00-22:30 for this period only (Observations to L.B. Enfield - their planning reference 25/03859/VAR)