St Pauls Girls School Brook Green London W6 7BS

Awaiting decision Hammersmith and Fulham 2020/03468/LBC Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

The installation of 3 no. demountable freestanding Jumbrellas in the Science Courtyard and 1 no. demountable freestanding shelter in front of the Garden BuildingThe total area covered be the above is 108 sq m divided into 4 separate spaces

As published by the council, reference 2020/03468/LBC

Application record

Reference
2020/03468/LBC
Type
Listed Building Consent
Status
Pending Consideration
Received
24 Dec 2020
Validated
29 Dec 2020
Ward
Avonmore And Brook Green
Decision by
Delegated Decision
Postcode
W6 7BS

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 20 applications since 2020: 3 approved, 0 refused.

  • P/2026/02245/DLBC Awaiting decision

    St Pauls Girls School Brook Green, London, W6 7BS

    Submission of details of method statement detailing the method of demolition and any remedial works pursuant to condition 6; A Method Statement for the protection of internal and external architectural details and historic building fabric, during demolition and construction works pursuant to condition 12 of planning application ref: 2020/01525/LBC granted 13th May 2021.

    Submitted 24 Aug 2026 Conditions
  • P/2026/02029/DET Awaiting decision

    St Pauls Girls School Brook Green, London, W6 7BS

    Submission of details of a sample of the metal to be used in connection with acoustic enclosure and plant room pursuant to condition 3 of planning permission ref: 2025/02428/FUL granted 16th January 2026.

    Submitted 5 Aug 2026 Conditions
  • P/2026/02108/DLBC Awaiting decision

    St Pauls Girls School Brook Green, London, W6 7BS

    Submission of details of a sample of the metal to be used in connection with acoustic enclosure and plant room pursuant to condition 3 of planning application ref: 2025/02429/LBC granted 16th January 2026.

    Submitted 5 Aug 2026 Conditions
  • P/2026/01695/TREE Awaiting decision

    St Pauls Girls School Brook Green, London, W6 7BS

    ##Red dot T2 Sycamore -Reduce new growth back to most recent pruning points, leaving the tree at a height of approx. 16metres and spread of approx. 16metres; ##White dot Cabbage tree -Remove to ground level , heavily declining, safety reasons (Black dot tree on separate application as on different site)

    Submitted 10 Jul 2026 Trees
  • P/2026/01783/TPO Awaiting decision

    St Pauls Girls School Brook Green, London, W6 7BS

    Pruning of a Sycamore Tree (T1) subject to Tree Preservation Order TPO/369/05/10 by reducing new growth back to most recent pruning points, leaving the tree at a height of approx. 16metres and spread of approx. 16metres.

    Submitted 9 Jul 2026 Trees
  • 2025/02429/LBC Granted

    St Pauls Girls School Brook Green, London, W6 7BS

    Demolition of the existing plant room and erection of a new enlarged replacement plant room located on the eastern side of the main school building at lower ground floor level including the installation of an acoustic encloure on the roof of new plant room; infilling of the existing louvre to eastern elevation boundary wall; alterations at upper ground floor level (eastern elevation of the IT Director's room) to include the installation of a new door to replace the existing window; alterations at lower ground floor level (eastern elevation of the Staff Social Link area) to include the demolition of curtain wall and erection of a new partition wall in between the main building the plant room, installation of a new internal door including the formation of a new walkway with an external door in between the main building and plant room.

    Decided 16 Jan 2026 Heritage and listed buildings
  • 2025/02428/FUL Granted

    St Pauls Girls School Brook Green, London, W6 7BS

    Demolition of the existing plant room and erection of a new enlarged replacement plant room located on the eastern side of the main school building at lower ground floor level including the installation of an acoustic enclosure on the roof of new plant room; infilling of the existing louvre to eastern elevation boundary wall; alterations at upper ground floor level (eastern elevation of the IT Director's room) to include the installation of a new door to replace the existing window; alterations at lower ground floor level (eastern elevation of the Staff Social Link area) to include the demolition of curtain wall and erection of a new partition wall in between the main building the plant room, installation of a new internal door including the formation of a new walkway with an external door in between the main building and plant room.

    Decided 16 Jan 2026 Full applications
  • 2025/01784/DLBC Granted

    St Pauls Girls School Brook Green, London, W6 7BS

    Submission of details to partially discharge condition 6 (Demolition Method Statement) and condition 12 (Method Statement for the protection of internal and external architectural details and historic building fabric, during demolition and construction works) pursuant to Phase 4 (Staff Hub) of listed building consent ref. 2020/01525/LBC granted 13 May 2021.

    Decided 9 Jun 2026 Conditions
  • 2024/02802/DET Awaiting decision

    St Pauls Girls School Brook Green, London, W6 7BS

    Submission of details of a compliance report with details of the two exhaust flues and Central ventilation extraction systems of the Mercer Building in order to mitigate air pollution pursuant to condition 4 of planning permission ref: 2021/02999/FUL granted 9th September 2022.

    Submitted 4 Nov 2024 Conditions
  • 2020/03473/FUL Awaiting decision

    St Pauls Girls School Brook Green London W6 7BS

    The installation of 3 no. demountable freestanding external Jumbrellas within the Science Courtyard and 1 no. demountable freestanding external Shelter in the Garden Building courtyard.

    Submitted 26 Dec 2020 Full applications

Timeline

Dates from the published record

  1. 24 Dec 2020

    Received by Hammersmith and Fulham

  2. 29 Dec 2020

    Validated

    Checked as complete and ready for consideration.

  3. 15 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 February 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided heritage and listed building applications in a median of 156 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • St Pauls Girls School Brook Green London W6 7BS

    2020/03473/FUL Submitted 26 Dec 2020 6m away

    97% historically approved · decision due ~23 Feb

    The installation of 3 no. demountable freestanding external Jumbrellas within the Science Courtyard and 1 no. demountable freestanding external Shelter in the Garden Building courtyard.

    Awaiting decision Full applications 24 docs
  • St Pauls Girls School Brook Green London W6 7BS

    2020/02896/TREE Submitted 2 Nov 2020 12m away

    97% historically approved · decision due ~28 Dec

    Sycamore: Raise low canopy by 2 metres and reduction in the spread by 3 metres to all sides to clear road and provide clearance.Ash Leaf Maple: Remove dieback, reduce canopy by 2m, and raise low canopy to clear road by 2m;Cherry: Reduce height and spread by 2m to all sides to clear building and balance canopy.(AMENDED DESCRIPTION)

    Awaiting decision Trees 2 docs
  • St Pauls Girls School Brook Green London W6 7BS

    2020/01525/LBC Submitted 15 Jun 2020 14m away

    100% historically approved · decision due ~11 Aug

    Demolition of the existing Rosalind Franklin Building (excluding boiler house arch and chimney) and erection of a new two storey Centre for Design and Innovation (CDI) adjacent to the retained boundary wall and new fencing to the rear of properties on Rowan Road; excavation to extend the CDI to the west; erection of a glazed link between the CDI and the Mercers Building to the south; refurbishment of the Mercers Building including removal of the fire escape stair and introduction of new overhead door; demolition of the existing Forum Building (excluding screen to science courtyard) and erection of a new three storey Staff Hub and link with the Main Building; enclosure of spaces between the Main Building and the Staff Hub and CDI buildings by erection of covered links; installation of solar photovoltaic panels to the roof of the Celia Johnson building; landscaping of the car park including changes to the entrance gates and the erection of a new single storey maintenance building in the southeast corner of the car park; reconfiguration of some spaces in the Main Building over lower ground, upper ground and first floor for administration spaces, meeting spaces, pastoral spaces and toilet and locker space; landscaping works to the science courtyard and other associated works.

    Awaiting decision Heritage and listed buildings Demolition Windows or glazing 119 docs
    Small domestic
  • St Pauls Girls School Brook Green London W6 7BS

    2020/01524/FUL Submitted 15 Jun 2020 21m away

    97% historically approved · decision due ~11 Aug

    Demolition of the existing Rosalind Franklin Building (excluding boiler house arch and chimney) and erection of a new two storey Centre for Design and Innovation (CDI) adjacent to the retained boundary wall and new fencing to the rear of properties on Rowan Road; excavation to extend the CDI to the west; erection of a glazed link between the CDI and the Mercers Building to the south; refurbishment of the Mercers Building including removal of the fire escape stair and introduction of new overhead door; demolition of the existing Forum Building (excluding screen to science courtyard) and erection of a new three storey Staff Hub and link with the Main Building; enclosure of spaces between the Main Building and the Staff Hub and CDI buildings by erection of covered links; installation of solar photovoltaic panels to the roof of the Celia Johnson building; landscaping of the car park including changes to the entrance gates and the erection of a new single storey maintenance building in the southeast corner of the car park; reconfiguration of some spaces in the Main Building over lower ground, upper ground and first floor for administration spaces, meeting spaces, pastoral spaces and toilet and locker space; landscaping works to the science courtyard and other associated works.

    Awaiting decision Full applications Demolition Windows or glazing 125 docs
    Small domestic
  • St Pauls Girls School Brook Green, London, W6 7BS

    P/2026/02245/DLBC Submitted 24 Aug 2026 26m away

    95% historically approved · decision due ~22 Oct

    Submission of details of method statement detailing the method of demolition and any remedial works pursuant to condition 6; A Method Statement for the protection of internal and external architectural details and historic building fabric, during demolition and construction works pursuant to condition 12 of planning application ref: 2020/01525/LBC granted 13th May 2021.

    Awaiting decision Conditions Demolition 3 docs
  • St Pauls Girls School Brook Green, London, W6 7BS

    2024/02802/DET Submitted 4 Nov 2024 26m away

    95% historically approved · decision due ~2 Jan

    Submission of details of a compliance report with details of the two exhaust flues and Central ventilation extraction systems of the Mercer Building in order to mitigate air pollution pursuant to condition 4 of planning permission ref: 2021/02999/FUL granted 9th September 2022.

    Awaiting decision Conditions 11 docs

In Hammersmith and Fulham

  • 2026/00071/LBC Granted

    7 Shepherd's Bush Place London W12 8LX

    Erection of rear extensions at ground and first floor levels; installation of a new light channel in the rear roofslope; installation of a new rooflight above the roof of first floor rear back addition; internal alterations at first floor level to include new internal partition walls to form a new bathroom, demolition of the existing partition wall in the rear bathroom and re-decorate the rear bathroom with new units, and installation of new door openings; internal alterations at ground floor level to include replacement of existing kitchen with new wc and utility room together with a new partition wall and door opening, removal of existing double doors in between the proposed kitchen and living room; associated internal alterations.

    13 Jan 2026 Heritage and listed buildings
  • 2025/02901/LBC Granted

    46 Ravenscourt Gardens, London, W6 0TU

    Installation of an air source heat pump within a timber ventilated acoustic enclosure on anti-vibration mounts on top of the ground floor back addition; installation of a gas meter and pedestrian access gate with new pedestrian access gate to the front (northern elevation); replacement of existing wooden gate with new wooden gate to southern elevation of the property; replacement of existing timber trellis on top of the brick boundary wall with new timber trellis (extended) to the western elevation.

    17 Oct 2025 Heritage and listed buildings
  • P/2026/02050/LBC Awaiting decision

    River Wall Road Side 28 - 34 Upper Mall London W6 9TA

    Creation of a ceramic tile mural to celebrate William Morris and his 1880 journey along the Thames, to be mounted on the road side of the river wall to the Upper Mall across from Kelmscott House, William Morris' home in Hammersmith.

    6 Aug 2026 Heritage and listed buildings
  • 2026/00046/LBC Granted

    Greenside Primary School Westville Road, London, W12 9PT

    External alterations to include: replacement of existing roof coverings and roof system with new roof covering and roof system (in varying heights) comprising of new replacement felt to all roofs; replacement of external awnings with new electronically operated awnings; replacement of existing glass with slim double glaze or laminated within the existing crittall metal frame; replacement of existing steel frame (to later extensions) with new steel frame and double-glazing system; replacement of existing rooflights with new safety glass in existing frame and new rooflight to replace modern rooflight; refurbishment and replacement of existing rainwater goods; installation of anchor points and a horizontal lifeline system to provide safe access to roof; Internal alterations to include: installation of new internal blinds comprising of white blackout fabric to replace the existing black fabric; associated internal and external alterations.

    9 Jan 2026 Heritage and listed buildings
  • Ravenscourt Park Hospital, Ravenscourt Park,London,W6 0TN

    Internal and external alterations to Block C including part demolition of existing basement walls, construction of a new lightwell, enlargement of an existing louvred opening, installation of a louvred vent and associated door, construction of a parapet wall and internal strip-out and trenching for power cables, in association with the installation of a new electrical substation.

    17 Apr 2026 Heritage and listed buildings