Planning application
Hammersmith Apollo Queen Caroline Street, London, W6 9QH
Works: Loft or dormer Roofing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Refurbishment, repair and replacement works to the Hammersmith Apollo Theatre roof areas comprising of: new waterproofing, installation of new roof handrails and staircases, removal of redundant equipment, removal and replacement of rooflights and lanterns; associated external alterations.
As published by the council, reference P/2026/02930/LBC
Application record
- Reference
- P/2026/02930/LBC
- Type
- Listed Building Consent
- Status
- Pending As published: REGISTERED: Under Consultation
- Received
- 9 Nov 2026
- Validated
- 13 Nov 2026
- Ward
- Hammersmith Broadway
- Postcode
- W6 9QH
Comment by 16 December 2026
The council is taking comments on this application until then. Comments go to Hammersmith and Fulham through their own planning portal.
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 5 applications since 2017.
-
P/2026/02890/FUL Awaiting decision
Hammersmith Apollo Queen Caroline Street, London, W6 9QH
Refurbishment, repair and replacement works to the Hammersmith Apollo Theatre roof areas comprising of: new waterproofing, installation of new roof handrails and staircases, removal of redundant equipment, removal and replacement of rooflights and lanterns; associated external alterations.
-
P/2026/01250/LBC Awaiting decision
Hammersmith Apollo Queen Caroline Street, London, W6 9QH
Installation of a kitchen extract fan, rooftop hatch, guardrail system & external ductwork to the catering block to the south-west of the Hammersmith Apollo Theatre.
-
P/2026/01069/FUL Awaiting decision
Hammersmith Apollo Queen Caroline Street, London, W6 9QH
Installation of a kitchen extract fan, rooftop hatch, guardrail system & external ductwork to the catering block to the south-west of the Hammersmith Apollo Theatre.
-
2017/03115/DET Withdrawn
Hammersmith Apollo Queen Caroline Street London W6 9QH
Submission of details of the Ultra Low Nox Gas fired boilers pursuant to Condition 6; details of a Low Emission Strategy pursuant to Condition 7; details of an Air Quality and Air Quality Neutral Assessment pursuant to Condition 8 planning permission 2016/03908/FUL granted 16th February 2017.
Timeline
Dates from the published record
-
9 Nov 2026
Received by Hammersmith and Fulham
-
13 Nov 2026
Validated
Checked as complete and ready for consideration.
-
20 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 87 days over the applications it decided in the last year.
Documents
34 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided heritage and listed building applications in a median of 164 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hammersmith Apollo Queen Caroline Street, London, W6 9QH
98% historically approved · decision due ~8 Jan
Refurbishment, repair and replacement works to the Hammersmith Apollo Theatre roof areas comprising of: new waterproofing, installation of new roof handrails and staircases, removal of redundant equipment, removal and replacement of rooflights and lanterns; associated external alterations.
Awaiting decision Full applications Loft or dormer Roofing 35 docs -
Hammersmith Apollo Queen Caroline Street, London, W6 9QH
100% historically approved · decision due ~6 Sep
Installation of a kitchen extract fan, rooftop hatch, guardrail system & external ductwork to the catering block to the south-west of the Hammersmith Apollo Theatre.
Awaiting decision Heritage and listed buildings 25 docs -
Hammersmith Apollo Queen Caroline Street, London, W6 9QH
98% historically approved · decision due ~6 Sep
Installation of a kitchen extract fan, rooftop hatch, guardrail system & external ductwork to the catering block to the south-west of the Hammersmith Apollo Theatre.
Awaiting decision Full applications 28 docs -
St Vincent's 49 Queen Caroline Street London W6 9QH
97% historically approved · decision due ~26 Apr
T5 Ash- Prune back from building to allow approx. 2 metres of clearance. T7 Holly- Fell to ground level as it is dead. T13 Ash- Fell to ground level as it is leaning heavily towards the building. T18 Ash- Prune back from building to allow approx. 2 metres of clearance.T19 Ash- Prune back from building to allow approx. 2 metres of clearance. T20 Ash- Prune back from building to allow approx. 2 metres of clearance. T21 Ash- Prune back from building to allow approx. 2 metres of clearance. T22 Sycamore- 2m reduction to allow clearance to building and car park. T23 Elm- Prune back from building to allow approx. 2 metres of clearance. T24 Silver Birch- Lift canopy to approx. 8- 10 feet to improve ground clearance/ access. T25 Silver Birch- Lift canopy to approx. 8- 10 feet to improve ground clearance/ access.
Awaiting decision Trees 3 docs -
Hammersmith Apollo Queen Caroline Street London W6 9QH
Submission of details of the Ultra Low Nox Gas fired boilers pursuant to Condition 6; details of a Low Emission Strategy pursuant to Condition 7; details of an Air Quality and Air Quality Neutral Assessment pursuant to Condition 8 planning permission 2016/03908/FUL granted 16th February 2017.
Withdrawn Conditions 9 docs -
Duke Of Cornwall, 48 Fulham Palace Road, London, W6 9PH
Display of 2 no high level non illuminated signs, diplay of 1 no. internally illuminated fascia sign, display of 2no. internally illuminated menu signs, new vinyl detail to 2no. awnings.
Granted Advertising 10 docs
Other heritage and listed building applications
In Hammersmith and Fulham
-
P/2026/02948/LBC Awaiting decision
81 Black Lion Lane, London, W6 9BG
Demolition of the existing shed and erection of a single storey outbuilding in the rear garden.
-
P/2026/02869/CADEM Awaiting decision
25 Nasmyth Street, London, W6 0HA
Demolition of existing single storey timber structure to the side and rear of the existing ground floor extension.
-
P/2026/00763/LBC Granted
Olympia Exhibition Centre Hammersmith Road, London, W14 8UX
Installation of louvres to replace existing over panels of windows at National Hall.
-
P/2026/02763/CLPLB Awaiting decision
11 Jerdan Place, London, SW6 1BE
Internal fit-out and external alterations comprising refurbishment and fit-out of the existing commercial premises. External alterations including; removal and replacement of the existing projecting signage; removal and replacement of the existing awning; repainting of the existing shopfront façade; and internal alterations including; removal and replacement of existing joinery, including coffee counters, shelving, cupboards and worktops; removal and replacement of existing floor finishes; making good and repainting existing internal walls and ceilings; partial removal of an existing internal partition and installation of a new stud wall partition; removal and replacement of existing internal lighting fixtures; installation of new coffee counters, storage units, shelving and a backlit feature screen.
-
P/2026/01867/LBC Granted
Shepherds Bush Empire Shepherd'S Bush Green, London, W12 8TT
Internal alterations to include: removal of the Main Bar 1 and installation of a new bar (relocated) to the rear of mezzanine floor and associated internal alterations.