Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

Awaiting decision Hammersmith and Fulham 2019/03327/NMAT Non-Material Amendment Submission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Non-Material Amendments to vary the wording of conditions attached to Planning Permission (Ref: 2011/01472/COMB dated 27 March 2012, as amended by 2016/00765/VAR dated 31 March 2017); comprising changes to the submission of pre-commencement details; in respect to the following conditions: Nos: 14 and 15

As published by the council, reference 2019/03327/NMAT

Application record

Reference
2019/03327/NMAT
Type
Non-Material Amendment Submission
Status
Pending Consideration
Received
7 Nov 2019
Validated
8 Nov 2019
Ward
Sands End
Decision by
Delegated Decision

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 21 applications since 2018: 16 approved, 0 refused.

  • 2021/00161/DET Awaiting decision

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of operational hours, in compliance with Condition 54 for Unit 9 of Countess House (Block B) of planning permission 2011/01472/COMB granted 27 March 2012 and subsequent variation permissions 2012/04253/VAR granted 26 February 2013 and 2016/00765/VAR granted 29 July 2016.

    Submitted 19 Jan 2021 Conditions
  • 2019/02356/DET Awaiting decision

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of site drainage, in compliance with condition 46 of planning permission 2012/04253/VAR dated 26 February 2013.

    Submitted 7 Aug 2019 Conditions
  • 2019/01588/DET Granted

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of Site Management Arrangements, in compliance with Condition 53 for Phase 3 (Block F) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by variation permission 2016/00765/VAR dated 31st March 2017.

    Decided 17 Jul 2019 Conditions
  • 2019/01535/DET Granted

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of site servicing strategy, in compliance with condition 40 for Phases 3 (Block F) and Phase 4 (Block G) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by variation permission 2016/00765/VAR dated 31st March 2017.

    Decided 9 Jul 2019 Conditions
  • 2019/01431/DET Granted

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of code for sustainable homes and BREEAM to discharge Condition 32 for Phase 3 (Block F) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by planning permission 2016/00765/VAR dated 31st March 2017.

    Decided 7 Aug 2019 Conditions
  • 2019/01328/DET Granted

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of travel plan, in compliance with condition 41 for Phase 3 (Block F) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by variation permission 2016/00765/VAR dated 31st March 2017.

    Decided 9 Jul 2019 Conditions
  • 2019/01239/DET Granted

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of Secured by Design, in compliance with condition 18; details of secure cycle storage, in compliance with condition 39 relating to Phases 4 & 5 of planning permission 2011/01472/COMB dated 27th March 2012 as amended by planning permission 2016/00765/VAR dated 31st March 2017.

    Decided 14 May 2019 Conditions
  • 2019/01215/NMAT Granted

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Non-Material Minor Amendment to Planning Permission 2016/00765/VAR dated 29th July 2016, amendments sought to change the wording on conditions 16 (Materials), 23 (Lifetime Homes), 24 (Children's Play Space Strategy), 27 (Micro Climate Mitigation), 30 (Green/Brown Roofs), 31 (Energy Strategy), 36 (Sound Insulation), 37 (Lighting Management Plan), 42 Accessibility Strategy), 49 (Landscape and Ecology Management Plan), 63 (Privacy Strategy) and 64 Typical Bays the wording of these condition to read 'prior to the commencement of above ground works but excluding demolition and basement works'.

    Decided 14 May 2019 Amendments
  • 2019/00743/DET Granted

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of Water Basin Method Statement, in compliance with Condition 48; and details of Water Quality Management Plan, in compliance with Condition 51 for Phases 4 and 5 of planning permission 2011/01472/COMB dated 27th March 2012 as amended by planning permission 2016/00765/VAR dated 31st March 2017.

    Decided 17 Jul 2019 Conditions
  • 2019/00703/DET Granted

    Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    Details of Secured by Design, in compliance with condition 18 for Phase 3 (Block F) of planning permission 2016/00765/VAR dated 31 March 2017.

    Decided 9 Jul 2019 Conditions

Timeline

Dates from the published record

  1. 7 Nov 2019

    Received by Hammersmith and Fulham

  2. 8 Nov 2019

    Validated

    Checked as complete and ready for consideration.

  3. 22 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 3 January 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided amendment applications in a median of 61 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    2019/01328/DET Submitted 7 May 2019 50 yards away

    Details of travel plan, in compliance with condition 41 for Phase 3 (Block F) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by variation permission 2016/00765/VAR dated 31st March 2017.

    Granted Conditions 10 docs
  • Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    2018/00686/NMAT Submitted 26 Feb 2018 50 yards away

    Non-Material Amendment to Planning Permission 2016/00765/VAR granted 29th July 2016 to incorporate all drawings approved by Reserved Matters for Blocks F and G (2013/02259/RES) and Block H (2017/01221/RES) plus drawings substituted in respect to S96A application 2017/02921/NMAT onto Condition 5 (Drawings) which shall read;"The development shall not be erected otherwise than in accordance with the following approved drawings: A_BFG_00_C645_001-A; A_BFG_RF_C645_001-A; BFG_P_B1_C645_002; BFG_P_00_C645_001-C; BFG_P_01_C645_001-C; BFG_P_02_C645_001-C; BFG_P_03_C645_001-E; BFG_P_04_C645_001-F; BFG_P_05_C645_001-C; BFG_P_06_C645_001-D; BFG_P_07_C645_001-D; BFG_P_RF_C645_001-A; BFG_P_00_C645_100-A (DMS); BFG_P_01_C645_101-A (DMS); BFG_P_02_C645_102-A (DMS); BFG_P_03_C645_103-A (DMS); BFG_P_04_C645_104-A (DMS); BFG_P_05_C645_105-A (DMS); BFG_P_06_C645_106-A (DMS); BFG_P_07_C645_107-A (DMS); BF_S_S_C645_001; BF_E_N_C645_001-D; BF_E_S_C645_001-D; BF_E_E_C645_001-D; BF_E_W_C645_001-D; BG_E_E_C645_001-A; BG_E_W_C645_001-A; BF_D_TY_C645_001-A; BF_D_TY_C645_002-A; BF_D_TY_C645_003-A; BF_D_TY_C645_004-A; L-BLK-FG-90-001-B; L-BLK-FG-90-002-B; L-BLK-FG-90-003-B; L-BLK-FG-90-004-A; BH_P_B1_G100_001_A; BH_Z0_P_00_C645_001_A; BH_P_00_G100_001_A; BH_P_TY_G100_001_A; BH_P_RF_G100_001_A; BH_P_00_G200_001_A; BH_P_01_G200_001; BH_P_TY_G200_001; BH_P_05_G200_001; BH_P_06_G200_001_B; BH-P-RF-G200-001_B; BH_E_AA_G100_001_B; BH_E_BB_G100_001_B; BH_E_CC_G100_001_B; BH_E_DD_G100_001_B; BH_E_EE_G100_001_B; BH_E_N_G200_001_B; BH_E_W_G200_001_A; BH_E_S_G200_001_B; BH_E_E_G200_001_C; BH_D_TY-G200_001_C; L-BLK-H-90-001-B; L-BLK-H-90-002-A; L-BLK-H-90-003-A.In order to ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policies 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, 7.7, 7.8, 7.9 and 7.21 of the London Plan 2016 and Policies DC1, DC2, DC3, DC4, DC7 and DC8 of the Local Plan 2018."

    Granted Amendments 56 docs
  • Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    2019/00743/DET Submitted 13 Mar 2019 50 yards away

    Details of Water Basin Method Statement, in compliance with Condition 48; and details of Water Quality Management Plan, in compliance with Condition 51 for Phases 4 and 5 of planning permission 2011/01472/COMB dated 27th March 2012 as amended by planning permission 2016/00765/VAR dated 31st March 2017.

    Granted Conditions 8 docs
  • Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    2018/03968/DET Submitted 10 Dec 2018 50 yards away

    Submission of details of Construction Management Plan for Phase 4 and Phase 5 to partially discharge condition 8 for the demolition of St George's House and construction of basement pursuant to planning permission ref. 2013/2016/00765/VAR granted 31 March 2017.

    Granted Conditions Demolition 12 docs
  • Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    2019/00703/DET Submitted 11 Mar 2019 50 yards away

    Details of Secured by Design, in compliance with condition 18 for Phase 3 (Block F) of planning permission 2016/00765/VAR dated 31 March 2017.

    Granted Conditions 7 docs
  • Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    2019/02356/DET Submitted 7 Aug 2019 50 yards away

    95% historically approved · decision due ~3 Oct

    Details of site drainage, in compliance with condition 46 of planning permission 2012/04253/VAR dated 26 February 2013.

    Awaiting decision Conditions 5 docs

In Hammersmith and Fulham

  • 30 Davisville Road, London, W12 9SJ

    Non-material amendment to planning permission reference: 2018/03932/FUL dated 28 May 2019 for the Erection of a rear roof extension; erection of rear extensions at ground, first and second floor level; excavation of the front and rear garden to form lightwells in connection with the enlargement of the existing basement; installation of 1no rooflight in the front roofslope; conversion of the existing building into 1 x 3 bedroom and 2 x 2 bedroom self-contained flats. Amendments sought to the repositioning and increased number of kitchen rooflights, and internal alterations to the basement, ground and top floor.

    Received 26 Aug, published by the council 11 Sep 2026 Amendments
  • P/2026/02553/NMAT Awaiting decision

    M&S White City Site 54 Wood Lane London W12 7RQ

    Non-material amendment to vary Condition 2 (Drawings) of planning permission ref. 2024/02570/FUL granted on 1 April 2026 for: Erection of a 30-storey building (plus plant) with single storey basement for residential (C3) use with ancillary uses at the ground floor level and including associated landscaping, access, car and cycle parking and other engineering works. The amendments relate to changes to: reconfiguration of the ground floor and basement layouts; an increase to the GEA of ancillary residential (non-residential) floorspace at ground level (7sqm) and basement level (61sqm); landscape amendments including an enlarged water feature and larger terraces; minor adjustments to the access and servicing strategy; and ground floor façade and fenestration amendments.

    Received 6 Oct, published by the council 9 Oct 2026 Amendments
  • P/2026/02544/NMAT Awaiting decision

    260 - 262 North End Road, London, SW6 1NJ

    Non-material amendment to planning permission ref: 2022/03651/FUL granted 11th June 2025 for the 'Demolition of existing buildings at 260-262 North End Road; erection of a replacement part one, part three, part four storey, part five storey building comprising of one retail unit (Class E(a)), 394sqm office floorspace (Class E(g)) and 9 self-contained residential units (Class C3)' to allow amendments to the approved drawings to include: alterations to the main residential stair core to accommodate an evacuation lift, reconfiguration of access to the flats to enable the installation of a single smoke ventilated corridor at each floor level, increasing the size of the plantroom, re-configuration of the ground floor, re-configuration of Flat 5, increasing the size of the studio flats and external walls have been set out to brick dimensions.

    Received 2 Oct, published by the council 9 Oct 2026 Amendments
  • 4 Goldhawk Mews, London, W12 8PA

    Removal of conditions 2, 3 and 4 (parking permits) of planning application ref: 2014/05430/PD56 granted 7th January 2015 for the 'Change of use of the property from office (Class B1) into a single family dwellinghouse (Class C3)'.

    Received 17 Jul, published by the council 15 Aug 2026 Amendments
  • P/2026/02497/VAR Awaiting decision

    4 Southerton Road, London, W6 0PH

    Removal of condition 11 of planning permission ref: 1988/01014/FUL granted 1st August 1988 for the 'Erection of a replacement rear extension at first floor level and conversion to use as two cluster flats each providing three bedsitting rooms with communal facilities'.

    Received 28 Sep, published by the council 6 Oct 2026 Amendments