Planning application
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non-Material Amendments to vary the wording of conditions attached to Planning Permission (Ref: 2011/01472/COMB dated 27 March 2012, as amended by 2016/00765/VAR dated 31 March 2017); comprising changes to the submission of pre-commencement details; in respect to the following conditions: Nos: 14 and 15
As published by the council, reference 2019/03327/NMAT
Application record
- Reference
- 2019/03327/NMAT
- Type
- Non-Material Amendment Submission
- Status
- Pending Consideration
- Received
- 7 Nov 2019
- Validated
- 8 Nov 2019
- Ward
- Sands End
- Decision by
- Delegated Decision
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 21 applications since 2018: 16 approved, 0 refused.
-
2021/00161/DET Awaiting decision
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of operational hours, in compliance with Condition 54 for Unit 9 of Countess House (Block B) of planning permission 2011/01472/COMB granted 27 March 2012 and subsequent variation permissions 2012/04253/VAR granted 26 February 2013 and 2016/00765/VAR granted 29 July 2016.
-
2019/02356/DET Awaiting decision
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of site drainage, in compliance with condition 46 of planning permission 2012/04253/VAR dated 26 February 2013.
-
2019/01588/DET Granted
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of Site Management Arrangements, in compliance with Condition 53 for Phase 3 (Block F) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by variation permission 2016/00765/VAR dated 31st March 2017.
-
2019/01535/DET Granted
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of site servicing strategy, in compliance with condition 40 for Phases 3 (Block F) and Phase 4 (Block G) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by variation permission 2016/00765/VAR dated 31st March 2017.
-
2019/01431/DET Granted
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of code for sustainable homes and BREEAM to discharge Condition 32 for Phase 3 (Block F) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by planning permission 2016/00765/VAR dated 31st March 2017.
-
2019/01328/DET Granted
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of travel plan, in compliance with condition 41 for Phase 3 (Block F) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by variation permission 2016/00765/VAR dated 31st March 2017.
-
2019/01239/DET Granted
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of Secured by Design, in compliance with condition 18; details of secure cycle storage, in compliance with condition 39 relating to Phases 4 & 5 of planning permission 2011/01472/COMB dated 27th March 2012 as amended by planning permission 2016/00765/VAR dated 31st March 2017.
-
2019/01215/NMAT Granted
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Non-Material Minor Amendment to Planning Permission 2016/00765/VAR dated 29th July 2016, amendments sought to change the wording on conditions 16 (Materials), 23 (Lifetime Homes), 24 (Children's Play Space Strategy), 27 (Micro Climate Mitigation), 30 (Green/Brown Roofs), 31 (Energy Strategy), 36 (Sound Insulation), 37 (Lighting Management Plan), 42 Accessibility Strategy), 49 (Landscape and Ecology Management Plan), 63 (Privacy Strategy) and 64 Typical Bays the wording of these condition to read 'prior to the commencement of above ground works but excluding demolition and basement works'.
-
2019/00743/DET Granted
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of Water Basin Method Statement, in compliance with Condition 48; and details of Water Quality Management Plan, in compliance with Condition 51 for Phases 4 and 5 of planning permission 2011/01472/COMB dated 27th March 2012 as amended by planning permission 2016/00765/VAR dated 31st March 2017.
-
2019/00703/DET Granted
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of Secured by Design, in compliance with condition 18 for Phase 3 (Block F) of planning permission 2016/00765/VAR dated 31 March 2017.
Timeline
Dates from the published record
-
7 Nov 2019
Received by Hammersmith and Fulham
-
8 Nov 2019
Validated
Checked as complete and ready for consideration.
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 January 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided amendment applications in a median of 61 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of travel plan, in compliance with condition 41 for Phase 3 (Block F) of planning permission 2011/01472/COMB dated 27th March 2012 as amended by variation permission 2016/00765/VAR dated 31st March 2017.
Granted Conditions 10 docs -
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Non-Material Amendment to Planning Permission 2016/00765/VAR granted 29th July 2016 to incorporate all drawings approved by Reserved Matters for Blocks F and G (2013/02259/RES) and Block H (2017/01221/RES) plus drawings substituted in respect to S96A application 2017/02921/NMAT onto Condition 5 (Drawings) which shall read;"The development shall not be erected otherwise than in accordance with the following approved drawings: A_BFG_00_C645_001-A; A_BFG_RF_C645_001-A; BFG_P_B1_C645_002; BFG_P_00_C645_001-C; BFG_P_01_C645_001-C; BFG_P_02_C645_001-C; BFG_P_03_C645_001-E; BFG_P_04_C645_001-F; BFG_P_05_C645_001-C; BFG_P_06_C645_001-D; BFG_P_07_C645_001-D; BFG_P_RF_C645_001-A; BFG_P_00_C645_100-A (DMS); BFG_P_01_C645_101-A (DMS); BFG_P_02_C645_102-A (DMS); BFG_P_03_C645_103-A (DMS); BFG_P_04_C645_104-A (DMS); BFG_P_05_C645_105-A (DMS); BFG_P_06_C645_106-A (DMS); BFG_P_07_C645_107-A (DMS); BF_S_S_C645_001; BF_E_N_C645_001-D; BF_E_S_C645_001-D; BF_E_E_C645_001-D; BF_E_W_C645_001-D; BG_E_E_C645_001-A; BG_E_W_C645_001-A; BF_D_TY_C645_001-A; BF_D_TY_C645_002-A; BF_D_TY_C645_003-A; BF_D_TY_C645_004-A; L-BLK-FG-90-001-B; L-BLK-FG-90-002-B; L-BLK-FG-90-003-B; L-BLK-FG-90-004-A; BH_P_B1_G100_001_A; BH_Z0_P_00_C645_001_A; BH_P_00_G100_001_A; BH_P_TY_G100_001_A; BH_P_RF_G100_001_A; BH_P_00_G200_001_A; BH_P_01_G200_001; BH_P_TY_G200_001; BH_P_05_G200_001; BH_P_06_G200_001_B; BH-P-RF-G200-001_B; BH_E_AA_G100_001_B; BH_E_BB_G100_001_B; BH_E_CC_G100_001_B; BH_E_DD_G100_001_B; BH_E_EE_G100_001_B; BH_E_N_G200_001_B; BH_E_W_G200_001_A; BH_E_S_G200_001_B; BH_E_E_G200_001_C; BH_D_TY-G200_001_C; L-BLK-H-90-001-B; L-BLK-H-90-002-A; L-BLK-H-90-003-A.In order to ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policies 7.1, 7.2, 7.3, 7.4, 7.5, 7.6, 7.7, 7.8, 7.9 and 7.21 of the London Plan 2016 and Policies DC1, DC2, DC3, DC4, DC7 and DC8 of the Local Plan 2018."
Granted Amendments 56 docs -
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of Water Basin Method Statement, in compliance with Condition 48; and details of Water Quality Management Plan, in compliance with Condition 51 for Phases 4 and 5 of planning permission 2011/01472/COMB dated 27th March 2012 as amended by planning permission 2016/00765/VAR dated 31st March 2017.
Granted Conditions 8 docs -
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Submission of details of Construction Management Plan for Phase 4 and Phase 5 to partially discharge condition 8 for the demolition of St George's House and construction of basement pursuant to planning permission ref. 2013/2016/00765/VAR granted 31 March 2017.
Granted Conditions Demolition 12 docs -
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
Details of Secured by Design, in compliance with condition 18 for Phase 3 (Block F) of planning permission 2016/00765/VAR dated 31 March 2017.
Granted Conditions 7 docs -
Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6
95% historically approved · decision due ~3 Oct
Details of site drainage, in compliance with condition 46 of planning permission 2012/04253/VAR dated 26 February 2013.
Awaiting decision Conditions 5 docs
Other amendment applications
In Hammersmith and Fulham
-
P/2026/02232/NMAT Granted
30 Davisville Road, London, W12 9SJ
Non-material amendment to planning permission reference: 2018/03932/FUL dated 28 May 2019 for the Erection of a rear roof extension; erection of rear extensions at ground, first and second floor level; excavation of the front and rear garden to form lightwells in connection with the enlargement of the existing basement; installation of 1no rooflight in the front roofslope; conversion of the existing building into 1 x 3 bedroom and 2 x 2 bedroom self-contained flats. Amendments sought to the repositioning and increased number of kitchen rooflights, and internal alterations to the basement, ground and top floor.
-
P/2026/02553/NMAT Awaiting decision
M&S White City Site 54 Wood Lane London W12 7RQ
Non-material amendment to vary Condition 2 (Drawings) of planning permission ref. 2024/02570/FUL granted on 1 April 2026 for: Erection of a 30-storey building (plus plant) with single storey basement for residential (C3) use with ancillary uses at the ground floor level and including associated landscaping, access, car and cycle parking and other engineering works. The amendments relate to changes to: reconfiguration of the ground floor and basement layouts; an increase to the GEA of ancillary residential (non-residential) floorspace at ground level (7sqm) and basement level (61sqm); landscape amendments including an enlarged water feature and larger terraces; minor adjustments to the access and servicing strategy; and ground floor façade and fenestration amendments.
-
P/2026/02544/NMAT Awaiting decision
260 - 262 North End Road, London, SW6 1NJ
Non-material amendment to planning permission ref: 2022/03651/FUL granted 11th June 2025 for the 'Demolition of existing buildings at 260-262 North End Road; erection of a replacement part one, part three, part four storey, part five storey building comprising of one retail unit (Class E(a)), 394sqm office floorspace (Class E(g)) and 9 self-contained residential units (Class C3)' to allow amendments to the approved drawings to include: alterations to the main residential stair core to accommodate an evacuation lift, reconfiguration of access to the flats to enable the installation of a single smoke ventilated corridor at each floor level, increasing the size of the plantroom, re-configuration of the ground floor, re-configuration of Flat 5, increasing the size of the studio flats and external walls have been set out to brick dimensions.
-
P/2026/01868/VAR Granted
4 Goldhawk Mews, London, W12 8PA
Removal of conditions 2, 3 and 4 (parking permits) of planning application ref: 2014/05430/PD56 granted 7th January 2015 for the 'Change of use of the property from office (Class B1) into a single family dwellinghouse (Class C3)'.
-
P/2026/02497/VAR Awaiting decision
4 Southerton Road, London, W6 0PH
Removal of condition 11 of planning permission ref: 1988/01014/FUL granted 1st August 1988 for the 'Erection of a replacement rear extension at first floor level and conversion to use as two cluster flats each providing three bedsitting rooms with communal facilities'.