Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The North East Of Junction Between Wilmere Lane And Lunts Heath Road Widnes Cheshire

Awaiting decision Halton 26/00270/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed development comprising the erection of 2 detached 3 bedroom dwellings together with associated access and landscaping works at

As published by the council, reference 26/00270/FUL

Application record

Reference
26/00270/FUL
Category
Full applications
Status
Registered
Received
14 Jul 2026
Validated
14 Jul 2026
Ward
Farnworth
Parish
No Parish

Timeline

Dates from the published record

  1. 14 Jul 2026

    Received by Halton

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Halton took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Octo Architects Agent, an architecture practice

13 applications on PlanIndex · across 8 councils · 67% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

  • 379-DESIGN AND ACCESS STATEMENT Supporting Documents · 06 Aug 2026
  • APPLICATIONFORMREDACTED Application Form · 14 Jul 2026
  • 379-EX-050-A3 LOCATION PLAN Plans · 14 Jul 2026
  • 379-EX-051-A3 EXISTING SITE PLAN Plans · 14 Jul 2026
  • 379-PL-051-A3 PROPOSED SITE PLAN Plans · 14 Jul 2026
  • 379-PL-052-A3 PROPOSED SITE GROUND FLOOR PLAN Plans · 14 Jul 2026
  • 379-PL-052-HIGHWAYS-A3 Plans · 14 Jul 2026
  • 379-PL-054-REFUSE-CYCLE-A3 Plans · 14 Jul 2026
  • 379-PL-100-A1 PROPOSED FLOOR PLANS AND ROOF PLAN Plans · 14 Jul 2026
  • 379-PL-200-A1 PROPOSED ELEVATIONS Plans · 14 Jul 2026
  • 379-PL-201-A1 CONTEXTUAL STREET ELEVATIONS Plans · 14 Jul 2026
  • 379-PL-400-A3 PROPOSED 3D ILLUSTRATION Plans · 14 Jul 2026
  • PHASE_1_DESKTOP_STUDY_PART1 Supporting Documents · 14 Jul 2026
  • PHASE_1_DESKTOP_STUDY_PART2 Supporting Documents · 14 Jul 2026
  • BIODIVERSITY_NET_GAIN_ASSESSMENT Biodiversity · 14 Jul 2026
  • THE_STATUTORY_BIODIVERSITY_METRIC_TOOL Biodiversity · 14 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Halton for determination, against a statutory target of eight weeks. Over the last year Halton decided full applications in a median of 69 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Halton

  • 26/00289/FUL Granted

    10 Coronation Drive Widnes Cheshire WA8 8AY

    Proposed glazed enclosure for a sacred Bodhi Tree to sit in landscaped area within site area at

    22 Jul 2026 Full applications
  • 26/00359/FUL Awaiting decision

    6A Pool Hollow Runcorn Cheshire WA7 5TE

    Construction of an annex in the rear garden (retrospective) at

    14 Sep 2026 Full applications
  • 26/00276/FUL Granted

    4 Cornforth Way Widnes Cheshire WA8 9WB

    Proposed single storey rear extension at

    20 Jul 2026 Full applications
  • 25/00196/FUL Granted

    Central Waste Ltd Pickerings Road Widnes WA8 8XW

    Change of use from vehicle recycling and storage (Sui Generis) to mixed use comprising vehicle depot and offices (Sui Generis), and proposed extension and alteration to existing building at

    8 May 2025 Full applications
  • 26/00354/FUL Awaiting decision

    284 Birchfield Road Widnes Cheshire WA8 9ER

    Proposed replacement roof and installation of externally insulated render. Removal of balcony flat roofs and replacement with pitch roofs. Single storey side extension. New front porch and internal alterations at

    11 Sep 2026 Full applications