Planning application
Land Within Operational Land Forming Part Of The INEOS Enterprises Salt Ltd Barlow Way Runcorn Cheshire WA7 4HG
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed demolition of an existing INEOS workshop and the erection of a replacement workshop within the INEOS Enterprises Site. The new workshop will be approximately 12m wide and 32m long and will be one storey. An outdoor laydown area is proposed to the south of the workshop at
As published by the council, reference 25/00358/FUL
Application record
- Reference
- 25/00358/FUL
- Category
- Full applications
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 14 Aug 2025
- Validated
- 20 Aug 2025
- Decided
- 28 Oct 2026
- Ward
- Mersey & Weston
- Parish
- No Parish
- Postcode
- WA7 4HG
Timeline
Dates from the published record
-
14 Aug 2025
Received by Halton
-
20 Aug 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
3 Sep 2026
Status changed to Awaiting decision
Previously Registered.
-
28 Oct 2026
Decision issued: Approved
-
28 Oct 2026
Status changed to Decided
Previously Awaiting decision.
Documents
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
- BNG METRIC
- STAGE 1 GENERIC QUANTITATIVE RISK ASSESSMENT REPORT - GB01T25A53-SYS-ZZ-ZZ-REP-E
- APPLICATIONFORMREDACTED
- EXISTING AND PROPOSED SITE PLAN - GB01T25A53-SYS-XX-XX-DRG-EAR-000011
- PROPOSED GROUND FLOOR, MEZZ FLOOR AND ROOF PLAN - GB01T25A53-SYS-XX-XX-DRG-EAR-0
- EXISTING AND PROPOSED 3D VIEWS - GB01T25A53-SYS-XX-XX-DRG-EAR-000013
- EXISTING ELEVATIONS - GB01T25A53-SYS-XX-XX-DRG-EAR-000014
- PROPOSED ELEVATIONS - GB01T25A53-SYS-XX-XX-DRG-EAR-000015
- DEMOLITION PLAN - GB01T25A53-SYS-XX-XX-DRG-EAR-000016
- STAGE 1 PRELIMINARY RISK ASSESSMENT REPORT PART 1 - GB01T25A53-SYS-ZZ-ZZ-REP-EGE
- STAGE 1 PRELIMINARY RISK ASSESSMENT PART 2 - GB01T25A53-SYS-ZZ-ZZ-REP-EGE-000005
- STAGE 1 PRELIMINARY RISK ASSESSMENT PART 3 - GB01T25A53-SYS-ZZ-ZZ-REP-EGE-000005
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT PART 1 - GB01T25A53-SYS-ZZ-00-REP-EEC-00
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT PART 2 - GB01T25A53-SYS-ZZ-00-REP-EEC-00
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT PART 3 - GB01T25A53-SYS-ZZ-00-REP-EEC-00
- BNG METRIC - GB01T25A53-SYS-ZZ-00-CAL-EEC-000002
- WORKSHOP DRAINAGE DRAWING - GB01T25A53-SYS-XX-XX-DRG-EDR-000150-S3-P03
- WORKSHOP DRAINAGE SCHEDULE - GB01T25A53-SYS-XX-XX-DRG-EDR-000151-S3-P02
- STAGE 1 PRELIMINARY RISK ASSESSMENT REPORT PART 4 - GB01T25A53-SYS-ZZ-ZZ-REP-EGE
- WORKSHOP LOCATION PLAN - GB01T25A53-SYS-XX-XX-DRG-EAR-000010
- PLANNING STATEMENT - GB01T25A53-SYS-XX-000-REP-EPC-000001
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Halton granted permission on 28 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Runcorn EfW Facility Barlow Way Runcorn Cheshire WA7 4HG
Proposed creation of a temporary car parking facility adjacent to the Viridor Energy Recovery Facility. The car park will contain 65 parking bays of 2.4m (width) x 2.8m (length) in size. To the east of the car park a 565m2 lay down area is proposed. The car park and lay down area will be surfaced with compact gravel at
Granted Full applications 15 docs -
Runcorn Energy From Waste Facility (Land Within Operational Land Forming Part Of INEOS Enterprises Salt Ltd) Barlow Way Runcorn Cheshire WA7 4HG
Proposed construction and operation of an extension to an existing warehouse and modifications to the northern elevation of the same warehouse, erection of a prefabricated modular office unit, modification of an existing conveyor tower to clad its northern elevation, add an external staircase and add a mezzanine floor at
Granted Full applications Extension 25 docs -
Pavilions Site Picow Farm Road Runcorn WA7 4EX
99% historically approved · decision due ~27 May
Proposed demolition of derelict sports pavilion and the re-development of site for two detached Industrial units with mixed uses E(g)(iii), B2 & B8, ancillary offices, car parking, service areas and soft landscaping at
Awaiting decision Full applications Demolition 92 docs
Other full applications
In Halton
-
26/00358/FUL Withdrawn
7 Aran Close Hale Liverpool L24 5SB
Proposed two storey front extension, single storey front extension, single storey rear extension, render of front of property and alterations to fenestration at
-
26/00425/FUL Awaiting decision
1 Sefton Avenue Widnes Cheshire WA8 9JZ
Proposed demolition of existing conservatory and erection of single storey rear extension at
-
26/00327/FUL Granted
27 Buckingham Avenue Widnes Cheshire WA8 9EW
Proposed garage conversion including new raised flat roof to existing garage and kitchen and new canopy to front elevation at
-
26/00418/FUL Awaiting decision
8A Stockham Close Runcorn Cheshire WA7 2PA
Proposed single storey rear extension and single storey side garage extension at
-
26/00413/FUL Awaiting decision
26 Lutterworth Avenue Runcorn Cheshire WA7 1HY
Proposed single storey extension to side and rear at