Planning application
Finn Forest Ditton Road (West) Widnes WA8 0PG
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior notification of proposed demolition of redundant warehouse buildings and workshops at
As published by the council, reference 25/00375/DEM
Application record
- Reference
- 25/00375/DEM
- Type
- Demolition Notification
- Status
- Decided
- Decision
- Granted As published: No Objection to
- Received
- 10 Oct 2024
- Validated
- 10 Sep 2025
- Decided
- 9 Oct 2025
- Ward
- Ditton, Hale Village & Halebank
- Parish
- No Parish
- Decision by
- Delegated Decision
- Postcode
- WA8 0PG
Timeline
Dates from the published record
-
10 Oct 2024
Received by Halton
-
10 Sep 2025
Validated
Checked as complete and ready for consideration.
-
9 Oct 2025
Decision issued: No Objection to
-
14 Nov 2026
Added to PlanIndex
Documents
9 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Halton granted permission on 9 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Former Metsa Group Site Ditton Road (west) Widnes Cheshire
Proposed extension to existing canopy and external alterations to industrial unit including infill of existing opening at
-
Shearfab Ltd St Michaels Industrial Estate Widnes Cheshire WA8 8TL
96% historically approved · decision due ~20 Jan
Proposed single storey side extension for storage use at
Awaiting decision Full applications Extension 13 docsSmall domestic -
Land West Of St Michaels Road ( Off Ditton Road ) Widnes WA8 0TH
Application to discharge condition no. 11 (Fire Safety Review and EMC Assessment) of planning permission 22/00623/FUL on
Granted Conditions 5 docs -
Former Tarmac Site And Former Stobart Site Foundry Lane Widnes Cheshire WA8 8YZ
94% historically approved · decision due ~23 Dec
Application for Non Material Amendment to planning permission 20/00352/HBCOUT to move the substation into a new position at
Awaiting decision Amendments -
Former Tarmac Site And Former Stobart Site Foundry Lane Widnes Cheshire WA8 8YZ
Application to discharge condition no. 4 (Climate Change Mitigation Measures) of planning permissions 21/00470/REM and 23/00077/S73 at
Decided Conditions 3 docs -
Land Bounded By Ditton Brook And Foundry Lane Widnes Cheshire
Application to discharge condition nos. 3 (Part Discharge of Construction Management Plan) and 8 (Piling) of planning permission 23/00077/S73 at
Decided Conditions 15 docs
Other less common application types
In Halton
-
26/00122/DEM Withdrawn
Colin Myers Timber And Sawmill Hale Road Widnes Cheshire WA8 8PX
Prior notification of proposed demolition of existing traditional construction (brick / blockwork) single-storey building and part demolition of existing portal frame building at
-
26/00118/HBCDEM Granted
Golden Triangle Industrial Estate Harrison Street Widnes Cheshire WA8 8TN
Prior notification of proposed demolition of buildings at
-
26/00135/HSC Awaiting decision
Univar Solutions CD&S UK Limited Hale Road Industrial Estate Pickerings Road Widnes WA8 8XW
Application for Hazardous Substances Consent at
-
25/00149/HBCDEM Granted
39 - 43 Waterloo Road Widnes Cheshire WA8 0PR
Prior notification of proposed demolition of small row of terraced buildings at
-
25/00293/FULEIA Awaiting decision
Runcorn Carbon Dioxide Spur Pipeline
Proposed construction of a new carbon dioxide spur pipeline, an Above Ground Installation (AGI), plus ancillary works and equipment to serve Viridor Energy from Waste (EfW) Facility Carbon Capture Plant at