Planning application
Pavilions Site Picow Farm Road Runcorn WA7 4EX
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed demolition of derelict sports pavilion and the re-development of site for two detached Industrial units with mixed uses E(g)(iii), B2 & B8, ancillary offices, car parking, service areas and soft landscaping at
As published by the council, reference 25/00151/FUL
Application record
- Reference
- 25/00151/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 28 Mar 2025
- Validated
- 1 Apr 2025
- Ward
- Mersey & Weston
- Parish
- No Parish
- Postcode
- WA7 4EX
Timeline
Dates from the published record
-
28 Mar 2025
Received by Halton
-
1 Apr 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Halton took a median of 62 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Hale Architecture Limited Agent, an architecture practice registered in King's Lynn
Active · incorporated 2013 · King's Lynn
94 applications on PlanIndex · across 20 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
92 documents on file for this application
- LICHFIELDS OPEN SPACE RESPONSE
- 22060-HAL-PL0003-O-PROPOSED SITE PLAN
- SK041-P01-PROPOSED SITE PLAN REFUSE AREAS-A1
- PICOW FARM ROAD OPEN SPACE ASSESSMENT
- TRANSPORT TECHNICAL NOTE 3
- BEA 25-010-06 LANDSCAPE STRATEGY PLAN P05
- BEA 25-010-07 PLANTING PLAN P04 1OF2
- BEA 25-010-08 PLANTING PLAN P05 2OF2
- DOC-10-16040-AM-20260223-EHO ENQUIRY (NOISE) REV00
- 10031-8100 PROPOSED DRAINAGE LAYOUT PLAN P05
- BEA 2510-EH-UPDATED ARBOR IMPACT ASSMT 001A
- BEA-25-010-09 TREE RETENTION & REMOVAL PLAN P02 1OF2
- BEA-25-010-10 TREE RETENTION & REMOVAL PLAN P03 2OF2
- 10031 - PTA REPLY TO LLFA COMMENTS 25_00151_FUL
- 10031 - SW CALCULATION UNIT 2 5.3 LS CV1
- 10031 - SW CALCULATION UNIT 1 14.7 LS CV1
- 10031 - SW CALCULATION 3RD PARTY ACCESS 5 LS CV1
- 10031 - PTA-XX-XX-RP-C-9071 FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY REV P02
- 10031 - PRE-DEVELOPMENT ENQUIRY RESPONSE - EMAIL CHAIN
- 10031 - 8110 SURFACE WATER CATCHMENT AREA PLAN REV P01
- 10031 - 8090 EXCEEDANCE FLOOD FLOW ROUTES REV P01
- 10031 - 3RD PARTY ACCESS 5 LS
- 10031 - UNIT 2 5.3 LS
- 10031 - UNIT 1 14.7 LS
- BEA-25-010-11 TREE PROTECTION PLAN P02 1OF2
- BEA-25-010-12 TREE PROTECTION PLAN P02 2OF2
- 2510 ARBORICULTURAL METHOD STATEMENT - PICOW FARM LANE RUNCORN A
- RT-MME-181881-03 REV A BIODIVERSITY STMT AND METRIC ASSMT
- BNG METRIC
- RT-MME-182635-(PAVILIONS BAT SURVEYS)
- GIA SUNLIGHT DAYLIGHT PI APPLCTN LETTER - DEC 25
- SLR RESPONSE TO HIGHWAYS COMMENTS_R1
- PITCH CONDITION SURVEY REPORT
- FOOTBALL+BOWLS CLUB ACCESS+PKING COSTS SCHED
- 425.066281.00001-PD04_REV B - SUR - KEY PLAN
- 425.066281.00001-PD04.2_REV A - SUR-SHEET 2
- 425.066281.00001-PD04.1_REV B - SUR-SHEET 1
- RT-MME-182635-(PAVILIONS BAT SURVEYS)
- SLR RESPONSE TO HIGHWAYS COMMENTS JUNE
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART1
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART10
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART9
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART8
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART7
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART6
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART5
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART4
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART3
- 11007 RUNCORN - SITE INVESTIGATION REPORT REV1_FINAL_PART2
- APPLICATIONFORMREDACTED
- 2232-ENERGY APPRAISAL -00-ZZ-RP-Z-0016-P1
- 2510 ARBORICULTURAL IMPACT ASSESSMENT - PICOW FARM LANE RUNCORN A
- 2510 TREE SURVEY - PICOW FARM LANE RUNCORN
- 05134 BREEAM NC V6.1.2 PRE-ASSESSMENT (VG)
- 10031 - 8020 CUT AND FILL EARTHWORKS ANALYSIS REV P03
- 10031 - 8300 PROPOSED LEVELS REV P03
- 11007 GEOENV REPORT REV1_FINAL_PART7
- 11007 GEOENV REPORT REV1_FINAL_PART8
- 3422724-HLE-RP-AIR QUALITY ASSMT_REV00
- ACOUSTIC PLANNING AND BREEAM REPORT-REV00 ISSUED (003)
- BEA 25-010-01 TREE SURVEY PLAN P01
- BEA 25-010-02 TREE SURVEY PLAN P01
- BEA 25-010-03 TREE CONSTRAINTS PLAN P01
- BEA 25-010-04 TREE CONSTRAINTS PLAN P01
- RT-MME-181881-01 (PICOW FARM ROAD PEA)
- RT-MME-181881-02 (PICOW FARM ROAD PRA)
- WILTEN CEMP INCLU DEMOLITION 06.02.25
- 22060-HAL-PL0001-B-SITE LOCATION PLAN
- 22060-HAL-PL0002-A-EXISTING SITE PLAN
- 22060-HAL-PL0004-CONSTRAINTS PLAN-A1
- 22060-HAL-PL-0005-EXISTING SITE SECTIONS-A1
- 22060-HAL-PL-0006C -PROPOSED SITE SECTIONS
- 22060-HAL-PL0013-UNIT 1 ROOF PLAN
- 22060-HAL-PL-0022B-UNIT 2-GA PROPOSED ELEVATIONS
- 22060-HAL-PL0023-A-UNIT 2 ROOF PLAN
- 22060-HAL-PL0010-C-UNIT 1-GA UNIT PLAN
- 22060-HAL-PL0011-C-UNIT 1 GA MAIN ENTRANCE AND FF OFFICE PLAN
- 22060-HAL-PL0012-C-UNIT 1GA PROPOSED ELEVATIONS
- 22060-HAL-PL0020-C-UNIT 2 GA UNIT PLAN
- 22060-HAL-PL0021-C-UNIT 2 GA MAIN ENTRANCE AND FF OFFICE PLAN
- 22060-PICOW FARM ROAD-EXTERNAL MATERIAL DETAILS-SPECIFICATION NOTES
- RT-MME-181881-02_STATUTORY_BIODIVTY_METRIC_CALCLTN_TOOL
- SLR_425.066281.00001_R_TP_V1.0
- SLR 425.066281.00001_R_TA_PART 1_V1.0
- SLR_425.066281.00001_R_TA_PART 2_V1.0
- 53170A_01_P
- 53170A_02_E
- 22060-PICOW FARM ROAD-PLANNING STATEMENT 26.03.25
- 22060 -PICOW FARM ROAD-HEALTH IMPACT ASSESSMENT 26.03.25
- FORM_1_CIL_ADDITIONAL_INFORMATION-COMPLETED
- 22060-PICOW FARM ROAD-DESIGN AND ACCESS STATEMENT-REV01-26.03.25_PART 1OF2
- 22060-PICOW FARM ROAD-DESIGN AND ACCESS STATEMENT-REV01-26.03.25_PART 2OF2
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Halton for determination, against a statutory target of eight weeks. Over the last year Halton decided full applications in a median of 71 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
131 Sandy Lane Runcorn Cheshire WA7 4EF
Proposed change of use from offices/light industrial (Use Class E) to a tuition centre for maths and English (Use Class F1) at
Withdrawn Full applications 5 docs -
Runcorn Energy From Waste Facility (Land Within Operational Land Forming Part Of INEOS Enterprises Salt Ltd) Barlow Way Runcorn Cheshire WA7 4HG
Proposed construction and operation of an extension to an existing warehouse and modifications to the northern elevation of the same warehouse, erection of a prefabricated modular office unit, modification of an existing conveyor tower to clad its northern elevation, add an external staircase and add a mezzanine floor at
Granted Full applications Extension 25 docs -
Runcorn EfW Facility Barlow Way Runcorn Cheshire WA7 4HG
Proposed creation of a temporary car parking facility adjacent to the Viridor Energy Recovery Facility. The car park will contain 65 parking bays of 2.4m (width) x 2.8m (length) in size. To the east of the car park a 565m2 lay down area is proposed. The car park and lay down area will be surfaced with compact gravel at
Granted Full applications 15 docs -
Land Within Operational Land Forming Part Of The INEOS Enterprises Salt Ltd Barlow Way Runcorn Cheshire WA7 4HG
Proposed demolition of an existing INEOS workshop and the erection of a replacement workshop within the INEOS Enterprises Site. The new workshop will be approximately 12m wide and 32m long and will be one storey. An outdoor laydown area is proposed to the south of the workshop at
Granted Full applications Demolition 21 docs -
30 Weston Road Runcorn Cheshire WA7 4LA
Proposed ground floor extension to existing garage together with conversion into living accommodation ancillary to the dwelling to facilitate the fostering of children at
Granted Full applications Extension 12 docsDomestic
Other full applications
In Halton
-
25/00358/FUL Granted
Land Within Operational Land Forming Part Of The INEOS Enterprises Salt Ltd Barlow Way Runcorn Cheshire WA7 4HG
Proposed demolition of an existing INEOS workshop and the erection of a replacement workshop within the INEOS Enterprises Site. The new workshop will be approximately 12m wide and 32m long and will be one storey. An outdoor laydown area is proposed to the south of the workshop at
-
26/00358/FUL Withdrawn
7 Aran Close Hale Liverpool L24 5SB
Proposed two storey front extension, single storey front extension, single storey rear extension, render of front of property and alterations to fenestration at
-
26/00425/FUL Awaiting decision
1 Sefton Avenue Widnes Cheshire WA8 9JZ
Proposed demolition of existing conservatory and erection of single storey rear extension at
-
26/00327/FUL Granted
27 Buckingham Avenue Widnes Cheshire WA8 9EW
Proposed garage conversion including new raised flat roof to existing garage and kitchen and new canopy to front elevation at
-
26/00418/FUL Awaiting decision
8A Stockham Close Runcorn Cheshire WA7 2PA
Proposed single storey rear extension and single storey side garage extension at