Planning application
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: No increases to the overall height of the building or number of floors but clarification on the floor numbers to remove reference to mezzanines. Alterations to the building envelope, increasing by one full brick on all sides. Increase in Student rooms from 340 to 353; Increased number of accessible bedrooms/studios to meet requirements for inclusive design as required by condition 69. Reduction in cycle parking ratio from 0.75 spaces per bed to 0.5 spaces per bed resulting in 177 spaces for students, 4 no. spaces for staff, 10 e-bike spaces, and 9 no. external spaces for visitors. Internal alterations to cycle store locations and plant rooms spaces on levels 1, 2 and 3. Introduced green roof and external terrace on proposed level 3 for students with relocation of generator now placed internally within the building at level 1. Owing to the changes highlighted above and requested alterations to the wording to condition 68, the following conditions 2 (approved drawings), 3 (quantum of development), 4 (quantum of development ? height of buildings and floorspace), 54 (Fire Statement), 58 (Green/Brown Roofs and Walls) and 68 (Habitat Management and Monitoring Plan) will require amendments.
As published by the council, reference 26/0319/NM
Application record
- Reference
- 26/0319/NM
- Type
- Non Material
- Status
- Registered
- Received
- 2 Feb 2026
- Validated
- 2 Feb 2026
- Ward
- GREENWICH PENINSULA
- Parish
- Greenwich
- Postcode
- SE10 0PF
Site history
Applications at this address on the Greenwich register
This site has had 3 applications since 2025: 2 approved, 0 refused.
-
26/0034/I106 Granted
PHASE 2, LOCATED ON THE CORNER OF BOORD STREET AND DREADNOUGHT STREET, GREENWICH, SE10 0PF
Submission of details pursuant to vary the Phase 2, PBSA Architects as detailed by Schedule 13 (Architect's Retention) associated with the S106 Agreement relating to ref.24/0995/F dated 27th November 2024
-
25/3952/NM Granted
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: Design alterations to the central circulation core to comply with fire regulations; Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios. Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms. Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O. Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade. Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing. Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15. Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.
Timeline
Dates from the published record
-
2 Feb 2026
Received by Greenwich
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Greenwich took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
ROK Planning Ltd Agent, a planning consultancy registered in London
Active · incorporated 2018 · London
299 applications on PlanIndex · across 58 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
65 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Greenwich for determination, against a statutory target of eight weeks. Over the last year Greenwich decided amendment applications in a median of 53 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: Design alterations to the central circulation core to comply with fire regulations; Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios. Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms. Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O. Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade. Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing. Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15. Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.
Granted Amendments Windows or glazing Trees 61 docs -
PHASE 2, LOCATED ON THE CORNER OF BOORD STREET AND DREADNOUGHT STREET, GREENWICH, SE10 0PF
Submission of details pursuant to vary the Phase 2, PBSA Architects as detailed by Schedule 13 (Architect's Retention) associated with the S106 Agreement relating to ref.24/0995/F dated 27th November 2024
Granted Conditions 4 docs -
FORMER LORRY PARK (ADJACENT TO STUDIO 338) LOCATED ON CORNER OF BOORD STREET AND MILLENNIUM WAY, GREENWICH, LONDON SE10
Submission of details pursuant to discharge part A of Condition 27 (Wheelchair Adaptable Dwellings Marketing) solely relating to the residential phase of planning permission 24/0995/F dated 27/11/2024.
Withdrawn Conditions 4 docs -
Land at Boord Street and Millennium Way, Greenwich, London, SE10 0BF
Submission of details pursuant to the discharge of Condition 14 (Cycle Parking) and Condition 15 (Facing Materials) of planning permission dated 31/07/2017 (Ref: 16/2309/F).
Withdrawn Conditions 9 docs -
O KEEFE GROUP, ST ANDREWS HOUSE, 1 BOORD STREET, GREENWICH, LONDON, SE10 0PU
94% historically approved · decision due ~10 Feb
Submission of details pursuant to Condition 3 (Demolition Management Plan, Construction Logistics Plan and Construction Management Plan) of planning permission 19/0939/F dated 21/01/2021.
Awaiting decision Conditions Demolition 4 docs -
FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB
91% historically approved · decision due ~16 Sep
Observation requested by Royal borough of Greenwich for Construction of two buildings for use as ...
Awaiting decision
Other amendment applications
In Greenwich
-
25/3969/MA Granted
1-18 SHEPHERDS LEAS, 135 RIEFIELD ROAD, ELTHAM, LONDON, SE9 2RD
An application submitted under Section 73 of the Town & Country Planning Act 1990 for a minor material amendment in connection with planning permission dated 19/12/2024, ref: 23/0984/F for "Demolition of existing buildings and redevelopment of the site to provide residential units with associated blue-badge parking and soft landscaping." This amendment proposed to vary the wording of Conditions 2 (Approved Drawings), 4 (Construction Management & Logistics Plan), 9 (Unexploded Ordnance), 10 (Construction Plant and Machinery (NRMM)), 13 (Energy Strategy), 16 (External Noise Mitigation), 17 (Air Quality Mitigation), 27 (Refuse & Recycling), 28 (Cycle Parking), 33 (Ecological Management Plan) and 34 (Construction Environmental Management Plan) to allow: - Reduction in height of the building, stepped massing, amendments to external materials, internal reconfiguration, enhanced corner parapet, footprint adjustment at Level 5, larger units provision, and reduction in perceived massing.
-
26/1342/NM Granted
260 ELTHAM HIGH STREET, ELTHAM, LONDON, SE9 1AA
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission dated 12/03/2025 (Reference: 24/1225/F) for "Demolition of existing buildings and construction of a multi-storey plus basement building to be used as self-storage (Class B8), and associated landscaping, vehicle manoeuvring and car parking, and refurbishment of the Locally Listed Building to the front of the site.", to allow the variation of Conditions 3 (Approved Drawings), 11 (Landscape Strategy), 22 (Refuse and Recycling) and 23 (Cycle Parking) to substitute approved drawings and enable the following changes: - Removal of the single-storey extension to the existing building at 2 Southend Crescent; - Reconfiguration of internal layout; and - Relocation of cycle storage and refuse storage areas.
-
25/4308/MA Refused
LAND TO THE REAR OF 182-192 SHOOTERS HILL ROAD, BLACKHEATH, LONDON, SE3 8RP
An application submitted under Section 73 of the Town & Country Planning Act 1990 for a minor material amendment in connection with the planning permission 25/2930/MA dated 06/10/2025 for the 'Construction of eight (8) new three storey terraced dwellinghouses (Use Class C3) including associated mansard roofs, garages, balconies, revised access arrangements and associated external works." to allow: Variation of Condition 2 (Drawing Numbers) - Updates to proposed roof finish - Removal of climbing plants - Internal arrangment alterations
-
26/0740/SD Granted
8 WHINYATES ROAD, ELTHAM, LONDON, SE9 6NN
An application submitted under Section 73 of the Town & Country Planning Act 1990 in connection with planning permission dated 09/02/2026, ref: 25/3814/HD for 'Retiling of roof and replacement of render with associated works.': - Amendment to Condition 3 (materials)
-
26/0740/MA Granted
8 WHINYATES ROAD, ELTHAM, LONDON, SE9 6NN
An application submitted under Section 73 of the Town & Country Planning Act 1990 in connection with planning permission dated 09/02/2026, ref: 25/3814/HD for 'Retiling of roof and replacement of render with associated works.': - Amendment to Condition 3 (materials)