Proposal
Submission of details pursuant to vary the Phase 2, PBSA Architects as detailed by Schedule 13 (Architect's Retention) associated with the S106 Agreement relating to ref.24/0995/F dated 27th November 2024
As published by the council, reference 26/0034/I106
Application record
- Reference
- 26/0034/I106
- Type
- Informal S106
- Status
- Decided
- Decision
- Approve
- Received
- 22 Dec 2025
- Validated
- 22 Dec 2025
- Decided
- 7 Jan 2026
- Ward
- GREENWICH PENINSULA
- Decision by
- Delegation
- Postcode
- SE10 0PF
Site history
Applications at this address on the Greenwich register
This site has had 3 applications since 2025: 2 approved, 0 refused.
-
26/0319/NM Awaiting decision
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: No increases to the overall height of the building or number of floors but clarification on the floor numbers to remove reference to mezzanines. Alterations to the building envelope, increasing by one full brick on all sides. Increase in Student rooms from 340 to 353; Increased number of accessible bedrooms/studios to meet requirements for inclusive design as required by condition 69. Reduction in cycle parking ratio from 0.75 spaces per bed to 0.5 spaces per bed resulting in 177 spaces for students, 4 no. spaces for staff, 10 e-bike spaces, and 9 no. external spaces for visitors. Internal alterations to cycle store locations and plant rooms spaces on levels 1, 2 and 3. Introduced green roof and external terrace on proposed level 3 for students with relocation of generator now placed internally within the building at level 1. Owing to the changes highlighted above and requested alterations to the wording to condition 68, the following conditions 2 (approved drawings), 3 (quantum of development), 4 (quantum of development ? height of buildings and floorspace), 54 (Fire Statement), 58 (Green/Brown Roofs and Walls) and 68 (Habitat Management and Monitoring Plan) will require amendments.
-
25/3952/NM Granted
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: Design alterations to the central circulation core to comply with fire regulations; Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios. Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms. Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O. Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade. Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing. Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15. Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.
Timeline
Dates from the published record
-
22 Dec 2025
Received by Greenwich
-
7 Jan 2026
Decision issued: Approve
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in London
260 applications on PlanIndex · across 52 councils · 91% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Greenwich granted permission on 7 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: Design alterations to the central circulation core to comply with fire regulations; Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios. Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms. Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O. Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade. Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing. Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15. Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.
Granted Amendments Windows or glazing Trees 61 docs -
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
81% historically approved · decision due ~30 Mar
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: No increases to the overall height of the building or number of floors but clarification on the floor numbers to remove reference to mezzanines. Alterations to the building envelope, increasing by one full brick on all sides. Increase in Student rooms from 340 to 353; Increased number of accessible bedrooms/studios to meet requirements for inclusive design as required by condition 69. Reduction in cycle parking ratio from 0.75 spaces per bed to 0.5 spaces per bed resulting in 177 spaces for students, 4 no. spaces for staff, 10 e-bike spaces, and 9 no. external spaces for visitors. Internal alterations to cycle store locations and plant rooms spaces on levels 1, 2 and 3. Introduced green roof and external terrace on proposed level 3 for students with relocation of generator now placed internally within the building at level 1. Owing to the changes highlighted above and requested alterations to the wording to condition 68, the following conditions 2 (approved drawings), 3 (quantum of development), 4 (quantum of development ? height of buildings and floorspace), 54 (Fire Statement), 58 (Green/Brown Roofs and Walls) and 68 (Habitat Management and Monitoring Plan) will require amendments.
Awaiting decision Amendments 65 docs -
FORMER LORRY PARK (ADJACENT TO STUDIO 338) LOCATED ON CORNER OF BOORD STREET AND MILLENNIUM WAY, GREENWICH, LONDON SE10
Submission of details pursuant to discharge part A of Condition 27 (Wheelchair Adaptable Dwellings Marketing) solely relating to the residential phase of planning permission 24/0995/F dated 27/11/2024.
Withdrawn Conditions 4 docs -
Land at Boord Street and Millennium Way, Greenwich, London, SE10 0BF
Submission of details pursuant to the discharge of Condition 14 (Cycle Parking) and Condition 15 (Facing Materials) of planning permission dated 31/07/2017 (Ref: 16/2309/F).
Withdrawn Conditions 9 docs -
O KEEFE GROUP, ST ANDREWS HOUSE, 1 BOORD STREET, GREENWICH, LONDON, SE10 0PU
94% historically approved · decision due ~10 Feb
Submission of details pursuant to Condition 3 (Demolition Management Plan, Construction Logistics Plan and Construction Management Plan) of planning permission 19/0939/F dated 21/01/2021.
Awaiting decision Conditions Demolition 4 docs -
FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB
91% historically approved · decision due ~16 Sep
Observation requested by Royal borough of Greenwich for Construction of two buildings for use as ...
Awaiting decision
Other condition discharge and variation applications
In Greenwich
-
26/1480/SD Granted
HAINAULT HOUSE, HAINAULT STREET, NEW ELTHAM, LONDON, SE9 2EG
Submission of details pursuant to discharge Condition 8 (Vehicle Crossover) and Condition 9 (Traffic Order Amendment) of planning permission reference 24/3489/F, dated 31/01/2025
-
26/0952/SD Granted
Garages to the rear of no. 19-25 Morden Street and the green space directly south of the site, Greenwich, London, SE13 7QR
Submission of details pursuant to Condition 23 (Permeable Paving) of Planning Permission 23/0889/F dated 20/03/2024
-
26/1258/SD Granted
FORMER PLUMSTEAD LEISURE CENTRE, SPERANZA STREET, PLUMSTEAD, SE18 1NX
Submission of details pursuant to the discharge of Condition 12 (Water Efficiency) of planning permission 21/0510/F dated 06/01/2022.
-
26/1211/SD Granted
Kidbrooke Station Square, Henley Cross, Kidbrooke, London, SE3 9PL
Submission of details pursuant to the partial discharge of Conditions 23(b) (BREEAM Non-Residental Uses) for Block P, and 26 (On site renewable energy technologies- evidence of installation) for Blocks C, E and F of planning permission 18/4187/F dated 20/12/2019 (as amended by non-material amendment 23/0377/NM dated 05/06/2023).
-
25/1892/SD Refused
23 & 25 BOSTALL HILL, ABBEY WOOD, LONDON, SE2 0RB
Submission of details pursuant to discharge condition 4 (Material details), 5 (Cycle Parking details) and 9 (Construction Logistics Plan and a Demolition and Construction Management Plan) of planning permission reference 25/0465/F dated 20.05.2025