Flat 0/1 24 Willowbank Street Glasgow G3 6LZ

Awaiting decision Glasgow City 26/01554/LBA

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Internal alterations, installation of replacement windows to front and rear and vents and boiler flue to rear.

As published by the council, reference 26/01554/LBA

Application record

Reference
26/01554/LBA
Status
Pending - Consideration
Received
22 Jul 2026
Validated
5 Aug 2026
Ward
Hillhead
Postcode
G3 6LZ

Site history

Applications at this address on the Glasgow City register

This site has had 2 applications since 2026.

  • 26/01555/FUL Awaiting decision

    Flat 0/1 24 Willowbank Street Glasgow G3 6LZ

    Installation of replacement windows to front and rear and vents and boiler flue to rear.

    Submitted 22 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 22 Jul 2026

    Received by Glasgow City

  2. 5 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Glasgow City took a median of 77 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • CERTIFICATE B LAND OWNERSHIP Other · 05 Aug 2026
  • FRONT AND REAR ELEVATIONS AS EXISTING Drawing · 05 Aug 2026
  • FRONT AND REAR ELEVATIONS AS PROPOSED Drawing · 05 Aug 2026
  • APPLICATION FOR LISTED BUILDING CONSENT Application Form · 05 Aug 2026
  • SECTIONS AS EXISTING AND PROPOSED Drawing · 05 Aug 2026
  • EXISTING AND PROPOSED HALLWAY VIEW Drawing · 22 Jul 2026
  • EXISTING AND PROPOSED LIVINGROOM VIEW 1 Drawing · 22 Jul 2026
  • EXISTING AND PROPOSED LIVINGROOM VIEW 2 Drawing · 22 Jul 2026
  • FLOOR PLAN AS EXISTING Drawing · 22 Jul 2026
  • FLOOR PLAN AS PROPOSED Drawing · 22 Jul 2026
  • A LOCATION PLAN Drawing · 22 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Glasgow City for determination, against a statutory target of eight weeks. Over the last year Glasgow City's median decision took 77 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Glasgow City's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles