Council hub · Scotland
Glasgow City planning applications
897 applications. 91% approved. 61 days to decide.
As of July 2026, PlanIndex holds 897 planning applications from Glasgow City. 236 were decided in the trailing 12 months, with 91% of clear-cut outcomes approved.
Latest applications
Data to July 2026
-
26/01535/LBA Awaiting decision
1 Dundas Street Glasgow G1 2AH
Display of internally illuminated signage
-
26/01529/LBA Awaiting decision
353 Langside Road Glasgow G42 8XT
External alterations associated with formation of doorway to front elevation.
-
26/01525/LBA Awaiting decision
13 Somerset Place Glasgow G3 7JT
Erection of domestic garage to rear of listed building.
-
26/01516/FUL Awaiting decision
73 Monreith Road Glasgow G43 2PE
Erection of single storey extension to rear of dwellinghouse.
-
26/01510/LBA Awaiting decision
The Arches Theatre 253 Argyle Street Glasgow G2 8DL
Display of internally illuminated signage
-
26/01509/FUL Awaiting decision
124 Observatory Road Glasgow G12 9AD
Formation of driveway opening and gates
-
26/01508/FUL Awaiting decision
Flat 0/1 13 Kirklee Terrace Glasgow G12 0TH
External alterations to rear of flatted property
-
26/01507/LBA Awaiting decision
Flat 0/1 13 Kirklee Terrace Glasgow G12 0TH
Internal and external alterations
-
26/01512/LBA Awaiting decision
124 Observatory Road Glasgow G12 9AD
Formation of driveway opening and gates
-
26/01514/PLU Awaiting decision
200 St James Road Glasgow
Installation of solar PV panels to roof of building
Recent decisions
Data to July 2026
-
26/01466/PRN Granted
Flat 2/1 10 Striven Gardens Glasgow G20 6DZ
Installation of replacement windows.
-
26/01120/ADV Granted
148 Nelson Street Tradeston Glasgow G5 8EJ
Display of illuminated signage.
-
26/00875/ADV Granted
Site At Retail Park Crow Road Glasgow
Display of signage.
-
26/00901/FUL Granted
10 Dalziel Drive Glasgow G41 4PT
Removal of extension, outbuildings, external staircase, erection of outbuilding, single storey extension to rear, external alterations, landscaping and associated works.
-
24/01485/DOC04 Granted
Kelvingrove Art Gallery 1 Kelvingrove Park Glasgow G3 8AG
External alterations to Argyle Street elevation, with fabric repairs to masonry, windows, steps, floor tiles and plaster to porte-cochere, roof finishes including gutters, leadworks, roof lanterns and replacement of slate, with stone cleaning, lighting, repainting, and associated works - Discharge of condition 12 of listed building consent 24/01485/LBA.
-
23/02600/DOC01 Granted
159 Hyndland Road Glasgow G12 9JA
Installation of canopy to side of premises (retrospective). - Discharge of condition 01 of planning consent 23/02600/FUL.
-
26/00528/FUL Withdrawn
109 Reidvale Street Glasgow
Alterations to tenement pend to form flatted dwelling (Sui generis), includes installation of boiler flue and gas meter box to front, and vent to rear. WITHDRAWN
-
25/02500/NMV01 Granted
4 Hatfield Drive Glasgow G12 0YA
External alteration to dwellinghouse including erection of single storey side and rear extension and demolition of garage - Non-Material Variation to planning permission 25/02500/FUL.
-
24/02817/DOC01 Granted
5 Hughenden Drive Glasgow G12 9XS
Erection of two storey extension to rear of dwellinghouse- Discharge of condition 03 of planning consent 24/02817/FUL
-
22/01468/DOC07 Withdrawn
Site Formerly Known As 640 Pollokshaws Road Glasgow
Erection of residential development and associated works - Discharge of condition 11 of planning permission 22/01468/FUL.
Decision speed
12 months to July 2026, where both dates are published
-
Within 8 weeks the statutory target for most applications 92 39%
-
8 to 13 weeks the target band for major development 120 51%
-
Over 13 weeks often extended by agreement 24 10%
Common questions
How many planning applications does Glasgow City decide?
In the 12 months to July 2026, Glasgow City decided 236 planning applications. 91% of clear-cut outcomes were approvals.
How long does a planning decision take in Glasgow City?
The median time from a planning application being received to a decision was 61 days over the 12 months to July 2026. Individual cases vary with complexity and consultation responses.
How many Glasgow City decisions arrive within the eight week target?
Of the 236 decisions in the 12 months to July 2026 where both dates are published, 39% came within eight weeks of the application being received, and 90% within thirteen weeks.
When is planning activity busiest in Glasgow City?
March 2026 was the busiest month across the 12 months to July 2026, with 200 applications recorded. The monthly pattern is listed on this page.
How do I find a planning application by its reference number?
Every application indexed here has its own page at a stable address. Look the reference up in a search engine together with the council name, or browse the latest applications below. Each page shows the description, address, dates and decision as the council published them.
Cite these figures
Glasgow City: 897 planning applications on record as of July 2026. Trailing 12 months: 236 decided, 91% approved, median 61 days to a decision. 897 new applications received in the same period. Source: PlanIndex, planindex.co.uk.