Skip to content
PlanIndex Get alerts
Menu

Planning application

7 West George Street Glasgow

Awaiting decision Glasgow City 26/01227/LBA

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Internal and external alterations associated with change of use to restaurant.

As published by the council, reference 26/01227/LBA

Application record

Reference
26/01227/LBA
Status
Pending - Consideration
Received
8 Jun 2026
Validated
8 Jun 2026
Ward
Anderston/City/Yorkhill

Site history

Applications at this address on the Glasgow City register

This site has had 2 applications since 2026.

  • 26/01226/FUL Awaiting decision

    7 West George Street Glasgow

    Use of basement storage space (Class 4) as restaurant (Class 3) with associated external alterations and plant.

    Submitted 8 Jun 2026 Full applications

Timeline

Dates from the published record

  1. 8 Jun 2026

    Received by Glasgow City

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 3 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Glasgow City took a median of 78 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

794 applications on PlanIndex · across 123 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

  • THE ARCHITECTURAL HERITAGE SOCIETY OF SCOTLAND Public Comment · 10 Jul 2026
  • BASEMENT GA PLAN EXISTING Drawing · 08 Jun 2026
  • BASEMENT LEVEL POTENTIAL TENANT FIT OUT Drawing · 08 Jun 2026
  • COVER LETTER Other · 08 Jun 2026
  • ELEVATIONS AS PROPOSED EAST FACING TO GEORGE SQUARE Drawing · 08 Jun 2026
  • ELEVATIONS AS PROPOSED NORTH FACING TO GEORGE SQUARE Drawing · 08 Jun 2026
  • GA ELEVATIONS AS EXISTING EAST FACING GEORGE SQUARE Drawing · 08 Jun 2026
  • GA ELEVATIONS AS EXISTING NORTH FACING TO WEST GEORGE STREET Drawing · 08 Jun 2026
  • GA ELEVATIONS AS EXISTING WEST FACING TO ANCHOR LANE Drawing · 08 Jun 2026
  • GA ELEVATIONS AS PROPOSED EAST FACING TO GEORGE SQUARE Drawing · 08 Jun 2026
  • GA ELEVATIONS AS PROPOSED WEST FACING TO ANCHOR LANE Drawing · 08 Jun 2026
  • GROUND FLOOR ACCESS LEVEL POTENTIAL TENANT FIT OUT Drawing · 08 Jun 2026
  • GROUND FLOOR PLAN EXISTING Drawing · 08 Jun 2026
  • APPLICATION PDF Application Form · 08 Jun 2026
  • A LOCATION PLAN Drawing · 08 Jun 2026
  • PLANNING STATEMENT Other · 08 Jun 2026
  • ROOF PLAN EXISTING Drawing · 08 Jun 2026
  • ROOF PLAN POTENTIAL TENANT FIT OUT Drawing · 08 Jun 2026
  • SECTION AA AS PROPOSED LOOKING SOUTH THROUGH NORTH LIGHTWELL Drawing · 08 Jun 2026
  • SECTION AA ASEXISTING LOOKING SOUTH THROUGH NORTH LIGHTWELL Drawing · 08 Jun 2026
  • SECTION BB AS EXISTING LOOKING THROUGH NORTH LIGHTWELL Drawing · 08 Jun 2026
  • SECTION BB AS PROPOSED LOOKING NORTH THROUGH NORTH LIGHTWELL Drawing · 08 Jun 2026
  • SITE PLAN Drawing · 08 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Glasgow City for determination, against a statutory target of eight weeks. Over the last year Glasgow City's median decision took 78 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Glasgow City's portal will say. Our guide explains the common types.