Planning application
38 And 42 - 66A New City Road Glasgow
Works: New dwelling Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing buildings and erection of mixed-use development comprising flatted residential apartments and purpose-built student accommodation (sui generis), commercial space including retail, professional services, cafes, restaurants (Class 1A and Class 3), hot food takeaways (sui generis), business and employment (Class 4), community and leisure uses (Class 10 and Class 11) and associated landscaping, public realm, car parking provision, infrastructure and associated works.
As published by the council, reference 26/01045/FUL
Application record
- Reference
- 26/01045/FUL
- Category
- Full applications
- Status
- Pending - Consideration
- Received
- 15 May 2026
- Validated
- 29 May 2026
- Ward
- Anderston/City/Yorkhill
Timeline
Dates from the published record
-
15 May 2026
Received by Glasgow City
-
29 May 2026
Validated
Checked as complete and ready for consideration.
-
6 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Glasgow City took a median of 77 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
CBRE Ltd Agent, registered in London
Active · incorporated 1998 · London
358 applications on PlanIndex · across 78 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordKeltbray Chinatown Developments Ltd Applicant, a developer registered in Glasgow
Active · incorporated 2025 · Glasgow
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
209 documents on file for this application
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ STAGE 1 GEO_ENVIRONMENTAL DESK STUDY _V1_15_PART_
- 2025_1123 CHINATOWN_ GLASGOW _ SITE INVESTIGATION SCOPE PROPOSALS _V1_20_
- LISA THOMSON
- LESLEY MURPHY
- OWNER /OCCUPIER FLAT 3/2 NEW CITY ROAD
- OWNER /OCCUPIER FLAT 3/1 NEW CITY ROAD
- OWNER /OCCUPIER FLAT1/3 NEW CITY ROAD
- DR HUGH WYNNE
- ROBERT ANDERSON
- LYNN WRIGHT
- EILEEN REID
- FITZWILLIAM TRUSTEES NUMBER 1 AND 2
- GRAHAM YOUNG
- TRANSPORT
- NOTIFICATION LIST - NEIGHBOURS
- DESKTOP STUDY REPORT PART 7
- EXISTING SITE WIDE SOUTH ELEVATION
- APPLICATION FOR FULL PLANNING PERMISSION
- OWNER NOTICES
- FLOOD RISK ASSESSMENT PART 1
- FLOOD RISK ASSESSMENT PART 2
- FLOOD RISK ASSESSMENT PART 3
- OWNER NOTIFICATION - HAO GIA LAM
- OWNER NOTIFICATION - KOK CHIN CHAN_ SIU FUN CHAN
- OWNER NOTIFICATION - KWUN KEI YAU
- OWNER NOTIFICATION - PAUL KAM MAN CHEUNG
- OWNER NOTIFICATION - ROBIN LIM ON BEHALF OF CHRISTINE LIM
- MECHANICAL RISER LAYOUT ALL LEVELS
- PRIMARY ELECTRICAL RISER BTR BLOCK -ALL LEVELS
- SECONDARY ELECTRICAL RISER BTR BLOCK -ALL LEVELS
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 1
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 2
- DAYLIGHT AND SUNLIGHT REPORT
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 10
- DESIGN AND ACCESS STATEMENT PART 11
- DESIGN AND ACCESS STATEMENT PART 12
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 3
- DESIGN AND ACCESS STATEMENT PART 4
- DESIGN AND ACCESS STATEMENT PART 5
- DESIGN AND ACCESS STATEMENT PART 6
- DESIGN AND ACCESS STATEMENT PART 7
- DESIGN AND ACCESS STATEMENT PART 8
- DESIGN AND ACCESS STATEMENT PART 9
- ELECTRICAL PLANT REPLACEMENT LAYOUT BLOCK A
- ELECTRICAL PLANT REPLACEMENT BLOCK B
- PLANT REPLACEMENT STRATEGY ALL LEVELS
- ENERGY STRATEGY REPORT PBSA BLOCKS A AND B
- SBEM SPECIFICATION INFORMATION PBSA OPTION 2
- ENE 02 ENERGY MONITORING STRATEGY REPORT PBSA BLOCKS A AND B
- ENE 04 LOW OR ZERO CARBON TECHNOLOGIES FEASIBILITY STUDY PBSA BLOCKS A AND B
- ENERGY STRATEGY REPORT BTR DEVELOPMENT BLOCK C
- ENERGY STRATEGY REPORT PBSA BLOCKS A AND B
- TERRACE LEVEL 06 FURNITURE PLAN
- TERRACE LEVEL 06 GENERAL ARRANGEMENT PLAN
- TERRACE LEVEL 06 HARD LANDSCAPE PLAN
- ILLUSTRATIVE MASTERPLAN
- LANDSCAPE MAINTENANCE SCHEDULE
- MECHANICAL PLANT REPLACEMENT LAYOUT ALL LEVELS
- MECHANICAL PLANT REPLACEMENT STRATEGY BLOCK B
- PLANT REPLACEMENT STRATEGY ALL LEVELS
- NOISE IMPACT ASSESSMENT
- TYPICAL MECHANICAL RISER PBSA LAYOUT
- TYPICAL PRIMARY ELECTRICAL RISER PBSA LAYOUT
- TYPICAL SECONDARY ELECTRICAL RISER PBSA LAYOUT
- ADDITIONAL FULL PLANNING APPLICATION
- PAC REPORT PART 1
- PAC REPORT PART 2
- PAC REPORT PART 3
- PRELIMINARY ECOLOGICAL APPRAISAL
- PRIMARY PLANT LAYOUT BLOCK A
- PRIMARY PLANT LAYOUT BLOCK B
- PRIMARY PLANT LAYOUT ALL LEVELS
- TERRACE LEVEL 06 SOFT LANDSCAPE PLAN
- SG5 STATEMENT ON ENERGY BLOCK A
- SG5 STATEMENT ON ENERGY BLOCK B
- SG5 STATEMENT ON ENERGY BLOCK C
- TREE SURVEY REPORT PART 1
- TREE SURVEY REPORT PART 2 COMPRESS
- VIBRATION ASSESSMENT
- WIND MICROCLIMATE ASSESSMENT REPORT
- BREEAM TRAVEL PLAN
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 3
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 4
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 5
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 6
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 7
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 8
- DAYLIGHT AND SUNLIGHT IMPACT APPENDICES PART 9
- DRAINAGE STRATEGY REPORT PART 1
- DRAINAGE STRATEGY REPORT PART 2
- DRAINAGE STRATEGY REPORT PART 3
- DRAINAGE STRATEGY REPORT PART 4
- DRAINAGE STRATEGY REPORT PART 5
- DRAINAGE STRATEGY REPORT PART 6
- DRAINAGE STRATEGY REPORT PART 7
- DRAINAGE STRATEGY REPORT PART 8
- DESKTOP STUDY REPORT PART 1
- DESKTOP STUDY REPORT PART 2
- DESKTOP STUDY REPORT PART 3
- DESKTOP STUDY REPORT PART 4
- DESKTOP STUDY REPORT PART 5
- DESKTOP STUDY REPORT PART 6
- DESKTOP STUDY REPORT PART 8
- DESKTOP STUDY REPORT PART 9
- DAYLIGHT, SUNLIGHT, OVERSHADOWING REPORT PART 1
- DAYLIGHT, SUNLIGHT, OVERSHADOWING REPORT PART 2
- DAYLIGHT, SUNLIGHT, OVERSHADOWING REPORT PART 3
- DAYLIGHT, SUNLIGHT, OVERSHADOWING REPORT PART 4
- LIGHTING STRATEGY
- ADDITIONAL FULL PLANNING APPLICATION
- TOWNSCAPE VISUAL APPRAISAL
- TRANSPORT STATEMENT
- WHOLE LIFECYCLE ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- ECONOMIC BENEFIT STATEMENT
- PLANNING STATEMENT
- ADDITIONAL FULL PLANNING APPLICATION
- STUDENT NEED AND DEMAND ASSESSMENT PT1
- STUDENT NEED AND DEMAND ASSESSMENT PT2
- CUMULATIVE DEVELOPMENTS
- TOWNSCAPE CHARACTER
- TOWNSCAPE DESIGNATIONS
- VIEWS AND VISUAL RECEPTORS
- ZTV _5KM
- ZTV 500M
- TVIA_VP12_BLYTHSWOOD SQUARE/BLYTHSWOOD STREET
- TVIA_VP9_BRAID PARK
- TVIA_VP11_CLAYPITTS
- TVIA_VP3_COWCADDENS ROAD_LR
- TVIA_VP2_DUNDASVALE ROAD AT COWCADDENS SUBWAY
- TVIA_VP10_GARSCUBE ROAD
- TVIA_VP7_GREAT WESTERN ROAD
- TVIA_VP8_GREAT WESTERN ROAD
- TVIA_VP14_LYNEDOCH PLACE STREET
- TVIA_VP4_ROSE STREET
- TVIA_VP1_SPIERS WHARF
- TVIA_VP6_ST GEORGES CROSS
- TVIA_VP13_ST GEORGES ROAD
- TVIA_VP5_DALHOUSIE STREET ADJACENT TO GARNETHILL PARK
- TVIA_VP_M8A_M8
- LEVEL 00 PUBLIC REALM EDGING PLAN 01
- LEVEL 00 PUBLIC REALM EDGING PLAN 02
- LEVEL 00 PUBLIC REALM FURNITURE PLAN 01
- LEVEL 00 PUBLIC REALM FURNITURE PLAN 02
- TERRACE LEVEL 01 FURNITURE PLAN
- LEVEL00 GENERAL ARRANGEMENT PLAN - PUBLIC REALM
- TERRACE LEVEL 01 GENERAL ARRANGEMENT PLAN
- LEVEL00 HARD LANDSCAPING PLAN PUBLIC REALM 01
- LEVEL00 HARD LANDSCAPING PLAN PUBLIC REALM 02
- TERRACE LEVEL 01 HARD LANDSCAPING PLAN
- LEVEL 00 PUBLIC REALM LEVELS PLAN 01
- LEVEL 00 PUBLIC REALM LEVELS PLAN 02
- A LOCATION PLAN
- PLANNING BAY STUDIES - BLOCK A - LOWER FLOORS
- PLANNING BAY STUDIES - BLOCK A - UPPER FLOORS
- PLANNING BAY STUDIES - BLOCK B SOUTH
- PLANNING BAY STUDIES - BLOCK B WEST
- PLANNING BAY STUDIES - BLOCK C
- BLOCK A - EAST AND NORTH ELEVATIONS
- BLOCK A - WEST AND SOUTH ELEVATIONS
- BLOCK B - NORTH AND EAST ELEVATIONS
- BLOCK B - SOUTH AND EAST ELEVATIONS
- BLOCK C - NORTH AND EAST ELEVATIONS
- BLOCK C - SOUTH AND WEST ELEVATIONS
- EXISTING SITE WIDE EAST ELEVATION
- EXISTING SITE WIDE NORTH ELEVATION
- EXISTING SITE WIDE WEST ELEVATION
- PROPOSED SITE WIDE EAST ELEVATION
- PROPOSED SITE WIDE NORTH ELEVATION
- PROPOSED SITE WIDE SOUTH ELEVATION
- PROPOSED SITE WIDE WEST ELEVATION
- LEVEL 00
- LEVEL 01
- LEVEL 02 05
- LEVEL 06
- LEVEL 07
- LEVEL 08
- LEVEL 09
- LEVEL 10 - 11
- LEVEL 12
- LEVEL 13
- LEVEL 14
- LEVEL 15 - 17
- LEVEL 18
- LEVEL 19
- LEVEL 20
- LOCATION
- ROOF PLAN
- EXISTING SITE WIDE SECTION AA
- EXISTING SITE WIDE SECTION BB
- EXISTING SITE WIDE SECTION CC
- PROPOSED SITE WIDE SECTION AA
- PROPOSED SITE WIDE SECTION BB
- PROPOSED SITE WIDE SECTION CC
- SITE PLAN AS EXISTING
- SITE PLAN AS PROPOSED
- LEVEL00 SOFT LANDSCAPING PLAN PUBLIC REALM 02
- LEVEL00 HARD LANDSCAPING PLAN PUBLIC REALM 02
- TERRACE LEVEL 01 SOFT LANDSCAPING PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Glasgow City for determination, against a statutory target of eight weeks. Over the last year Glasgow City decided full applications in a median of 88 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Glasgow City
-
26/01265/FUL Granted
Premier Inn 187 George Street City Centre Glasgow G1 1YU
Removal and replacement of telecommunications equipment and ancillary development
-
26/01358/FUL Granted
26 Leehill Road Glasgow G21 1XJ
Use of domestic garage as granny flat to side of dwellinghouse.
-
26/01942/FUL Awaiting decision
23 Penicuik Street Glasgow G32 6FR
Erection of single storey extension to rear of dwellinghouse.
-
26/01945/FUL Awaiting decision
7 Ormiston Avenue Glasgow G14 9DT
Erection of single storey extension to rear of dwellinghouse
-
26/01940/FUL Awaiting decision
Queens Park Baptist Church 20 Balvicar Drive Glasgow G42 8QS
Formation of lift and replacement of external porch and stair with steel stair