Planning application
Site To The North Of Royston Road/ Cumbernauld Road Glasgow
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Relates to 19/03061/MSC
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of residential development including formation of road junction and creation of nature conservation park - variation to 19/03061/MSC with the erection of three additional dwellinghouse units and substitution of house types to ten plots.
As published by the council, reference 26/00371/FUL
Application record
- Reference
- 26/00371/FUL
- Category
- Full applications
- Status
- Pending - Consideration
- Received
- 24 Feb 2026
- Validated
- 15 Sep 2026
- Ward
- North East
Site history
Applications at this address on the Glasgow City register
This site has had 2 applications since 2019: 1 approved, 0 refused.
-
19/03061/MSC Granted
Site To The North Of Royston Road/ Cumbernauld Road Glasgow
Erection of residential development including formation of road junction and creation of nature conservation park. Approval of Matters Specified in Conditions Application in relation to Planning Permission in Principle Consent 16/02723/DC - Residential Development (60 units).
Timeline
Dates from the published record
-
24 Feb 2026
Received by Glasgow City
-
15 Sep 2026
Validated
Checked as complete and ready for consideration.
-
22 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Glasgow City took a median of 77 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
19/03061/MSC Granted
Site To The North Of Royston Road/ Cumbernauld Road Glasgow
Erection of residential development including formation of road junction and creation of nature conservation park. Approval of Matters Specified in Conditions Application in relation to Planning Permission in Principle Consent 16/02723/DC - Residential Development (60 units).
Who's behind it
Company information only, from the register and Companies House
WB Properties Scotland Ltd Applicant, registered in Hamilton
Active · incorporated 2009 · Hamilton
2 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
287 documents on file for this application
- NOTIFICATION LIST - NEIGHBOURS
- PROPOSED SITE PLAN
- PREVIOUSLY APPROVED_PLOT02_HT12_POPLAR_2026-06-06-PLANNINGA3
- PREVIOUSLY APPROVED_ELDER_226-06-06-PLANNING_A3
- PREVIOUSLY APPROVED_BEECH_2026-06-06-PLANNINGA3_REVA
- PREVIOUSLY APPROVED POPLAR_2025-10-07-PLANNINGA3
- PREVIOUSLY APPROVED_LARCH_2025-06-06-PLANNINGA3
- PREVIOUSLY APPROVED__CHERRY_TYPE2_2025-06-06-PLANNINGA3_REVB
- PREVIOUSLY APPROVED__MAPLE_2025-06-06-PLANNING_A3
- PREVIOUSLY APPROVED_POPLAR_2025-06-06-PLANNINGA3
- PREVIOUSLY APPROVED__POPLAR_2026-06-06-PLANNINGA3
- PREVIOUSLY APPROVED__MAPLE_2025-06-06-PLANNING_A3
- PROPOSED___LANDSCAPE-PROPOSALS-02-04-26
- PROPOSED_LANDSCAPE-PROPOSALS-02-04-26
- PROPOSED__LANDSCAPE-PROPOSALS-02-04-26
- PROPOSED__LANDSCAPE-PROPOSALS-02-04-26
- PROPOSED___JUNIPER_2026-05-18-A3_00_PLANNING
- PROPOSED__JUNIPER_2026-05-18-A3_00_PLANNING
- PROPOSED_JUNIPER_2026-05-21-A3_00_PLANNING
- PROPOSED_JUNIPER_2026-05-21-A3_00_PLANNING
- PROPOSED_JUNIPER_2026-05-21-A3_00_PLANNING
- PROPOSED_JUNIPER_2026-05-18-A3_00_PLANNING
- PROPOSED_JUNIPER_2026-05-21-A3_00_PLANNING
- PROPOSED_JUNIPER_2026-05-21-A3_00_PLANNING
- PROPOSED__SPRUCE_2026-05-18-A3_00_PLANNING
- PROPOSED__JUNIPER_2026-05-21-A3_00_PLANNING
- PROPOSED_ASPEN_2026-05-21-A3_00_PLANNING
- PROPOSED_BEECH_2026-05-21-A3_00_PLANNING
- PROPOSED_JUNIPER_2026-05-21-A3_00_PLANNING
- PROPOSED_SITEPLAN_2026-06-30 - _SITE PLAN_HOUSEMIX
- LOCATION PLAN
- PROPOSED_SITEPLA_SITE PLAN_DRAINAGE
- PROPOSED_SITEPLAN_SITE PLAN_COLOURED
- PROPOSED_SITEPLAN_SITE PLAN_LANDSCAPING
- STATEMENT FOR SUSTAINABILITY
- PLOT 2 POPLAR
- ELDER FLOOR PLAN AND ELEVS
- BEECH PLANS AND ELEVS
- PLOT 24_POPLAR
- LARCH PLANS AND ELEVS
- CHERRY PLANS AND ELEVS
- MAPLE FLOOR PLANS AND ELEVS
- PREVIOUSLY APPROVED __PLOT30_HT12_POPLAR
- POPLAR
- MAPLE FLOOR PLANS AND ELEVS
- JUNIPER PLANS AND ELEVS
- PROPOSED JUNIPER PLANS AND ELEVS
- PROPOSED__PLOT101_HTS01_JUNIPER
- JUNIPER PLANS AND ELEVS
- PROPOSED JUNIPER PLANS AND ELEVS
- PROPOSED JUNIPER PLANS AND ELEVS
- PROPOSED JUNIPER PLANS AND ELEVS
- PROPOSED JUNIPER PLANS AND ELEVS
- PROPOSED SPRUCE PLANS AND ELEVS
- PROPOSED JUNIPER PLANS AND ELEVS
- PROPOSED ASPEN PLANS AND ELEVS
- PROPOSED BEECH PLANS AND ELEVS
- PROPOSED JUNIPER PLANS AND ELEVS
- LANDSCAPE PROPOSAL
- LANDSCAPE DETAIL AREA 1 OF 3
- LANDSCAPE DETAIL AREA 2 OF 3
- LANDSCAPE DETAIL AREA 3 OF 3
- PROP LOC PLAN TREE PLANTING
- PROP SITE PLAN COLOURED
- PROP SITE PLAN LANDSCAPING
- PROPOSED_STATEMENT_OF_ENERGY
- AMENDED LANDSCAPE ARCHITECTS DRAWING 2
- AMENDED LANDSCAPE ARCHITECTS DRAWING 3
- AMENDED LANDSCAPE ARCHITECTS DRAWING 4
- AMENDED LANDSCAPE ARCHITECTS DRAWING
- ADDITIONAL FULL PLANNING APPLICATION
- LANDWISE ENVIRONMENTAL REPORT 17
- LANDWISE ENVIRONMENTAL REPORT 18
- LANDWISE ENVIRONMENTAL REPORT 19
- LANDWISE ENVIRONMENTAL REPORT 20
- LANDWISE ENVIRONMENTAL REPORT 21
- LANDWISE ENVIRONMENTAL REPORT 22
- LANDWISE ENVIRONMENTAL REPORT 23
- LANDWISE ENVIRONMENTAL REPORT 24
- LANDWISE ENVIRONMENTAL REPORT 25
- LANDWISE ENVIRONMENTAL REPORT 26
- LANDWISE ENVIRONMENTAL REPORT 27
- LANDWISE ENVIRONMENTAL REPORT 28
- LANDWISE ENVIRONMENTAL REPORT 29
- LANDWISE ENVIRONMENTAL REPORT 30
- LANDWISE ENVIRONMENTAL REPORT 31
- LANDWISE ENVIRONMENTAL REPORT 32
- LANDWISE ENVIRONMENTAL REPORT 33
- LANDWISE ENVIRONMENTAL REPORT 34
- LANDWISE ENVIRONMENTAL REPORT 35
- LANDWISE ENVIRONMENTAL REPORT 36
- LANDWISE ENVIRONMENTAL REPORT 37
- LANDWISE ENVIRONMENTAL REPORT 38
- LANDWISE ENVIRONMENTAL REPORT 39
- LANDWISE ENVIRONMENTAL REPORT 40
- LANDWISE ENVIRONMENTAL REPORT 41
- LANDWISE ENVIRONMENTAL REPORT 42
- LANDWISE ENVIRONMENTAL REPORT 43
- LANDWISE ENVIRONMENTAL REPORT 44
- LANDWISE ENVIRONMENTAL REPORT 46
- MARK HAMILTON_MILLERSTON WOODLAND MANAGEMENT PLAN
- STATEMENT ON ENERGY
- FAIRHURST DRAINAGE IMPACT ASSESSMENT
- FAIRHURST FLOOD RISK ASSESSMENT
- GEOVIA REMEDIATION METHOD STATEMENT 01
- GEOVIA REMEDIATION METHOD STATEMENT 03
- ENGINEERING FOUNDATION
- GEOVIA REMEDIATION METHOD STATEMENT 05
- GEOVIA REMEDIATION METHOD STATEMENT 06
- GEOVIA REMEDIATION METHOD STATEMENT 07
- GEOVIA REMEDIATION METHOD STATEMENT 08
- JDC WILDLIFE ZONE HABITAT MANAGEMENT PLAN
- LANDSCAPE EXISTING LAYOUT PART 1
- LANDSCAPE EXISTING LAYOUT PART 2
- LANDSCAPE EXISTING LAYOUT PART 3
- LANDSCAPE EXISTING LAYOUT
- LANDWISE ENVIRONMENTAL REPORT 01
- LANDWISE ENVIRONMENTAL REPORT 02
- LANDWISE ENVIRONMENTAL REPORT 03
- LANDWISE ENVIRONMENTAL REPORT 04
- LANDWISE ENVIRONMENTAL REPORT 05
- LANDWISE ENVIRONMENTAL REPORT 06
- LANDWISE ENVIRONMENTAL REPORT 07
- LANDWISE ENVIRONMENTAL REPORT 08
- LANDWISE ENVIRONMENTAL REPORT 09
- LANDWISE ENVIRONMENTAL REPORT 10
- LANDWISE ENVIRONMENTAL REPORT 11
- LANDWISE ENVIRONMENTAL REPORT 12
- LANDWISE ENVIRONMENTAL REPORT 13
- LANDWISE ENVIRONMENTAL REPORT 15
- LANDWISE ENVIRONMENTAL REPORT 16
- P01 CHERRY T2 ELEVATIONS A3
- P01 CHERRY T2 FLOOR PLANS A3
- P01 CHERRY T2 PLANNING A3
- P02 JUNIPER ELEVATIONS A3
- P02 JUNIPER FIRST FLOOR PLAN A3
- P02 JUNIPER GROUND FLOOR PLAN A3
- P02 JUNIPER PLANNING A3
- P03 JUNIPER ELEVATIONS A3
- P03 JUNIPER FIRST FLOOR PLAN A3
- P03 JUNIPER GROUND FLOOR PLAN A3
- P03 JUNIPER PLANNING A3
- P04 LARCH ELEVATIONS A3
- P04 LARCH FIRST FLOOR PLAN A3
- P04 LARCH GROUND FLOOR PLAN A3
- P04 LARCH PLANNING A3
- P05 CHERRY T2 ELEVATIONS A3
- P05 CHERRY T2 FLOOR PLANS A3
- P05 CHERRY T2 PLANNING A3
- P06 BEECH ELEVATIONS A
- P06 BEECH FLOOR PLANS A3
- P06 BEECH PLANNING A3
- P101 JUNIPER ELEVATIONS A3
- P101 JUNIPER FIRST FLOOR PLAN A3
- P101 JUNIPER GROUND FLOOR PLAN A3
- P101 JUNIPER PLANNING A3
- P102 JUNIPER ELEVATIONS A3
- P102 JUNIPER FIRST FLOOR PLAN A3
- P102 JUNIPER GROUND FLOOR PLAN A3
- P102 JUNIPER PLANNING A3
- P103 JUNIPER ELEVATIONS A3
- P103 JUNIPER FIRST FLOOR PLAN A3
- P103 JUNIPER GROUND FLOOR PLAN A3
- P103 JUNIPER PLANNING A3
- P25 JUNIPER ELEVATIONS A3
- P25 JUNIPER FIRST FLOOR PLAN A3
- P25 JUNIPER GROUND FLOOR PLAN A3
- P25 JUNIPER PLANNING A3
- P26 SPRUCE PLANNING A3
- P27 BEECH ELEVATIONS A3
- P27 BEECH FLOOR PLANS A3
- P27 BEECH PLANNING A3
- P28 CHERRY T2 ELEVATIONS A3
- P28 CHERRY T2 FLOOR PLANS A3
- P28 CHERRY T2 PLANNING A3
- P29 JUNIPER ELEVATIONS PLAN A3
- P29 JUNIPER FIRST FLOOR PLAN A3
- P29 JUNIPER GROUND FLOOR PLAN A3
- P29 JUNIPER PLANNING A3
- P30 ASPEN ELEVATIONS A3
- P30 ASPEN FLOOR PLANS A3
- P30 ASPEN PLANNING A3
- P31 CEDAR ELEVATIONS
- P31 CEDAR FIRST FLOOR PLAN A3
- P31 CEDAR GROUND FLOOR PLAN A3
- P31 CEDAR PLANNING A3
- P32 JUNIPER ELEVATIONS A3
- P32 JUNIPER FIRST FLOOR PLAN A3
- P32 JUNIPER GROUND FLOOR PLAN A3
- P32 JUNIPER PLANNING A3
- P33 JUNIPER ELEVATIONS PLAN A3
- P33 JUNIPER FIRST FLOOR PLAN A3
- P33 JUNIPER GROUND FLOOR PLAN A3
- P33 JUNIPER PLANNING A3
- P34 ELDER ELEVATIONS A3
- P34 ELDER FIRST FLOOR PLAN A3
- P34 ELDER GROUND FLOOR PLAN A3
- P34 ELDER PLANNING A3
- P35 ASPEN FLOOR PLANS A3
- P35 ASPEN PLANNING A3
- P36 SPRUCE ELEVATIONS A3
- P36 SPRUCE FIRST FLOOR PLAN A3
- P36 SPRUCE GROUND FLOOR PLAN A3
- P36 SPRUCE PLANNING A3
- P37 CEDAR ELEVATION A3
- P37 CEDAR FIRST FLOOR PLAN A3
- P37 CEDAR GROUND FLOOR PLAN A3
- P37 CEDAR PLANNING A3
- P38 CHERRY T2 ELEVATIONS A3
- P38 CHERRY T2 FLOOR PLANS A3
- P38 CHERRY T2 PLANNING A3
- P39 BEECH FLOOR ELEVATIONS A3
- P39 BEECH FLOOR PLANS A3
- P39 BEECH PLANNING A3
- P40 JUNIPER ELEVATIONS A3
- P40 JUNIPER FIRST FLOOR PLAN A3
- P40 JUNIPER GROUND FLOOR PLAN A3
- P40 JUNIPER PLANNING A3
- P41 BEECH ELEVATIONS A3
- P41 BEECH FLOOR PLANS A3
- P41 BEECH PLANNING A3
- P42 LARCH ELEVATIONS A3
- P42 LARCH FIRST FLOOR PLAN A3
- P42 LARCH GROUND FLOOR PLAN A3
- P42 LARCH PLANNING A3
- P43 JUNIPER ELEVATIONS A3
- P43 JUNIPER FIRST FLOOR PLANS A3
- P43 JUNIPER GROUND FLOOR PLANS A3
- P43 JUNIPER PLANNING A3
- P44 JUNIPER ELEVATIONS A3
- P44 JUNIPER FIRST FLOOR PLAN A3
- P44 JUNIPER GROUND FLOOR PLAN A3
- P44 JUNIPER PLANNING A3
- P45 BEECH ELEVATIONS A3
- P45 BEECH FLOOR PLANS A3
- P45 BEECH PLANNING A3
- P46 CEDAR ELEVATIONS A3
- P46 CEDAR FIRST FLOOR PLAN A3
- P46 CEDAR GROUND FLOOR PLAN A3
- P46 CEDAR PLANNING A3
- P47 CHERRY T2 ELEVATIONS A3
- P47 CHERRY T2 FLOOR PLANS A3
- P47 CHERRY T2 PLANNING A3
- P48 CHERRY T2 ELEVATIONS A3
- P48 CHERRY T2 FLOOR PLANS A3
- P48 CHERRY T2 PLANNING A3
- P49 ELDER ELEVATIONS PLAN A3
- P49 ELDER FIRST FLOOR PLAN A3
- P49 ELDER GROUND FLOOR PLAN A3
- P49 ELDER PLANNING A3
- P50 BEECH ELEVATIONS A3
- P50 BEECH FLOOR PLANS A3
- P50 BEECH PLANNING A3
- P51 BEECH ELEVATIONS A3
- P51 BEECH FLOOR PLANS A3
- P51 BEECH PLANNING A3
- P52 LARCH ELEVATIONS A3
- P52 LARCH FIRST FLOOR PLAN A3
- P52 LARCH GROUND FLOOR PLAN A3
- P52 LARCH PLANNING A3
- P53 CHERRY T2 ELEVATIONS A3
- P53 CHERRY T2 FLOOR PLANS A3
- P53 CHERRY T2 PLANNING A3
- P54 CEDAR ELEVATIONS A3
- P54 CEDAR FIRST FLOOR PLAN A3
- P54 CEDAR GROUND FLOOR PLAN A3
- P54 CEDAR PLANNING A3
- P55 BEECH ELEVATIONS A3
- P55 BEECH FLOOR PLANS A3
- P55 BEECH PLANNING A3
- P56 CHERRY T2 ELEVATIONS A3
- P56 CHERRY T2 FLOOR PLANS A3
- P56 CHERRY T2 PLANNING A3
- P57 BEECH ELEVATIONS A3
- P57 BEECH FLOOR PLANS A3
- P57 BEECH PLANNING A3
- P58 CHERRY T2 ELEVATIONS A3
- P58 CHERRY T2 FLOOR PLANS A3
- P58 CHERRY T2 PLANNING A3
- P59 BEECH ELEVATIONS A3
- P59 BEECH FLOOR PLANS A3
- P59 BEECH PLANNING A3
- P60 CEDAR ELVATIONS A3
- P60 CEDAR FIRST FLOOR PLAN A3
- P60 CEDAR GROUND FLOOR PLAN A3
- P60 CEDAR PLANNING A3
- FULL PLANNING PERMISSION APPLICATION
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Glasgow City for determination, against a statutory target of eight weeks. Over the last year Glasgow City decided full applications in a median of 87 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Glasgow City
-
26/02040/FUL Awaiting decision
5 Balmuildy Fort Glasgow G23 5AZ
Landscaping works to garden of dwellinghouse.
-
26/01432/FUL Granted
10 Colchester Drive Glasgow G12 0NF
Erection of two storey extension to side and rear and single storey extension to rear of dwellinghouse.
-
26/01379/FUL Refused
13 Somerset Place Glasgow G3 7JT
Erection of domestic garage to rear of listed building.
-
26/01995/FUL Awaiting decision
Flat 0/1 14 Kew Terrace Glasgow G12 0TE
Installation of replacement windows and removal of external window bars
-
26/01990/FUL Awaiting decision
48 Kylerhea Road Glasgow G46 8AB
Erection of outbuilding for use as ancillary accommodation in garden ground of dwellinghouse.