Skip to content
PlanIndex Get alerts
Menu

Planning application

Springburn Nursery School/ Former Springburn Primary School Gourlay Street Glasgow

Awaiting decision Glasgow City 25/01570/LBA Listed Building Consent

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Internal and external alterations associated with conversion and adjoining development, includes fabric repairs, partial demolitions, re-roofing, installation of replacement windows, and related works.

As published by the council, reference 25/01570/LBA

Application record

Reference
25/01570/LBA
Type
Listed Building Consent
Status
Pending - Consideration
Received
9 Jul 2025
Validated
9 Jul 2025
Ward
Springburn/Robroyston
Parish
Springburn

Site history

Applications at this address on the Glasgow City register

This site has had 2 applications since 2025.

  • 25/01571/FUL Awaiting decision

    Springburn Nursery School/ Former Springburn Primary School Gourlay Street Glasgow

    Conversion of former school (Class 10) to residential flats (Sui generis), and erection of residential flatted block (Sui generis), includes fabric repairs, access, landscaping, car parking and associated works.

    Submitted 9 Jul 2025 Full applications

Timeline

Dates from the published record

  1. 9 Jul 2025

    Received by Glasgow City

  2. 26 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 3 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Glasgow City took a median of 77 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Jewitt & Wilkie Architects Limited Agent, an architecture practice

31 applications on PlanIndex · across 9 councils · 86% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Spectrum Properties (Scotland) Ltd. Applicant, registered in Glasgow

Active · incorporated 1988 · Glasgow

3 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

  • PAUL SWEENEY MSP Public Comment · 16 Sep 2025
  • STRUCTURAL INSPECTION Other · 09 Jul 2025
  • 2502-07 - 54 GOURLAY STREET GLASGOW - PHASE I DESK STUDY - PART 1 1-55 Other · 09 Jul 2025
  • 2502-07 - 54 GOURLAY STREET GLASGOW - PHASE I DESK STUDY - PART 2 56-70 Other · 09 Jul 2025
  • 2502-07 - 54 GOURLAY STREET GLASGOW - PHASE I DESK STUDY - PART 3 71-104 Other · 09 Jul 2025
  • CONSERVATION PLAN/DESIGN AND ACCESS STATEMENT Other · 09 Jul 2025
  • EXISTING BUILDING REPAIR SPECIFICATION Other · 09 Jul 2025
  • GROUND FLOOR PLAN AS EXISTING Drawing · 09 Jul 2025
  • FIRST FLOOR PLAN AS EXISTING Drawing · 09 Jul 2025
  • SECOND FLOOR PLAN AS EXISTING Drawing · 09 Jul 2025
  • ROOF PLAN AS EXISTING Drawing · 09 Jul 2025
  • ELEVATIONS AS EXISTING: SOUTH AND EAST ELEVATIONS Drawing · 09 Jul 2025
  • ELEVATIONS AS EXISTING: NORTH AND WEST ELEVATIONS Drawing · 09 Jul 2025
  • JANITOR HOUSE AND PERIMETER WALL ELEVATIONS: AS EXISTING Drawing · 09 Jul 2025
  • TOPOGRAPHIC SURVEY Drawing · 09 Jul 2025
  • SITE PLAN AS PROPOSED Drawing · 09 Jul 2025
  • GROUND FLOOR PLAN AS PROPOSED Drawing · 09 Jul 2025
  • FIRST AND SECOND FLOOR PLAN AS PROPOSED Drawing · 09 Jul 2025
  • ELEVATIONS AS PROPOSED: SOUTH AND EAST ELEVATIONS Drawing · 09 Jul 2025
  • ELEVATIONS AS PROPOSED: NORTH AND WEST ELEVATIONS 1 Drawing · 09 Jul 2025
  • SECTIONAL ELEVATIONS: AS PROPOSED Drawing · 09 Jul 2025
  • JANITOR HOUSE AND PERIMETER WALL ELEVATIONS: AS PROPOSED Drawing · 09 Jul 2025
  • APPLICATION FOR LISTED BUILDING CONSENT Application Form · 09 Jul 2025
  • A LOCATION PLAN Drawing · 09 Jul 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Glasgow City for determination, against a statutory target of eight weeks. Over the last year Glasgow City decided heritage and listed building applications in a median of 86 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

In Glasgow City

  • 26/01591/LBA Awaiting decision

    48 Gibson Street Hillhead Glasgow G12 8NW

    Internal and external alterations to listed building

    Received 27 Jul, published by the council 6 Aug 2026 Heritage and listed buildings
  • 26/00306/LBA Granted

    113 Buchanan Street City Centre Glasgow G1 3HF

    Internal and external alterations including partial demolition, with installation of entrance doors, new fire escape and associated works.

    Received 17 Feb, published by the council 28 Jul 2026 Heritage and listed buildings
  • 26/00522/LBA Granted

    Dixon Halls 656 Cathcart Road Glasgow G42 8AA

    Internal and external alterations

    Received 12 Mar, published by the council 28 Jul 2026 Heritage and listed buildings
  • 26/00170/LBA Granted

    Flat 2/1 6 Queen Mary Avenue Glasgow G42 8DT

    Internal alterations to flatted dwelling.

    Received 28 Jan, published by the council 6 Aug 2026 Heritage and listed buildings
  • 26/00620/LBA Granted

    50 Glencairn Drive Glasgow G41 4PR

    Internal and external alterations to listed building

    Received 26 Mar, published by the council 28 Jul 2026 Heritage and listed buildings