Planning application
Burrowine Moor Quarry Bogside Blairhall Fife
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
EIA application for the First Periodic Review of Planning Conditions of Mineral Permission 08/03390/EIA - ROMP application under Section 74 of the Town and Country Planning (Scotland) Act 1997
As published by the council, reference 25/02694/EIA
Application record
- Reference
- 25/02694/EIA
- Type
- Planning Permission (EIA Development)
- Status
- Registered
- Received
- 29 Sep 2025
- Validated
- 30 Sep 2025
- Ward
- West Fife And Coastal Villages
- Parish
- Kincardine
Comment by 15 November 2026
The council is taking comments on this application until then. Have your say on Fife's portal.
Site history
Applications at this address on the Fife register
This site has had 11 applications since 2023: 2 approved, 0 refused.
-
26/00366/SUDO Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Diversion and temporary stop up Order of core path 750 to enable development 08/03390/EIA
-
25/03006/FULL Withdrawn
Burrowine Moor Quarry Bogside Blairhall Fife
Alteration and extension to quarry including revised working scheme and concept restoration strategy for the site (Section 42 to temporarily not comply with Condition 34 of Planning Permission Reference 08/03390/EIA to allow for a trial blast)
-
08/03390/CND010 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 10 of Planning Permission 08/03390/EIA - path diversion
-
08/03390/CND036 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with condition 36 of approval 08/03390/EIA - restoration plan
-
08/03390/CND049 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 49 of Planning Permission 08/03390/EIA - All works done on or adjacent to existing public roads shall be constructed in accordance with the current Fife Council Transportation Development Guidelines works shall include the items referred to in conditions 50 - 52.
-
08/03390/CND028 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 28 of Planning Permission 08/03390/EIA - Within 6 months of the date of this permission the developer will submit to the Area Planning Manager a hydrogeological monitoring scheme that will make provision for the collection of groundwater levels around the site at appropriate intervals and for the reporting of the recorded groundwater levels to the Area Planning Manager.
-
08/03390/CND032 Granted
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 32 of Planning Permission 08/03390/EIA - That within 6 months of the date of this permission, details of wheel washing facilities, which for the avoidance of doubt shall also be sufficient for cleaning underneath the vehicles and their chasis, to be submitted and approved by the Area Planning Manager. Thereafter the wheel washing facility will be sited and located as agreed by the Area Planning Manager within 6 months of being approved by the Area Planning Manager.
-
08/03390/CND024 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 24 of Planning Permission 08/03390/EIA - Noise levels from the site for normal daytime operations shall not exceed the criterion listed below for the respective properties: Position Daytime Criterion 06:00 18:00 hrs LAeq,1hr Whitehills Farm 45.0 Da Heim 49.6 Borrowine Farm 46.9 Blinkeerie Farm 55.0 Righead Farm 45.0 Windy Hill Farm 55.0 Always accepting that, for temporary periods of a maximum of 3 months in any year, noise levels will not exceed 70 dBa during the periods of overburden removal, mound formation and the replacement of said overburden.
-
08/03390/CND031 Granted
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 31 of Planning Permission 08/03390/EIA - The internal access road within the site will be maintained and surfaced in such manner which minimises dust propagation, to the satisfaction of the Area Planning Manager.
-
08/03390/CND013 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 13 of Planning Permission 08/03390/EIA - A progressive programme of operations shall be submitted to the Area Planning Manager within 30 days of every 5th anniversary of the date of this permission. The programme to be submitted shall include: a. the current position of the extraction areas; b. the extent of overburden disposal; c. the location of soil storage areas and the provenance of said soil. d. the anticipated extent and depth of mineral workings and quarry waste tipping for the ensuing two year period; e. proposals for dealing with soils to be stripped from site; f. details of any restoration and aftercare that can reasonably be expected to be carried out during the following two year period. Such details shall include, when appropriate, the treatment of faces, benches, quarry floors and worked out areas. g. details of any site characteristics or other aspects that may influence the concept restoration plan for the quarry.
Timeline
Dates from the published record
-
29 Sep 2025
Received by Fife
-
30 Sep 2025
Validated
Checked as complete and ready for consideration.
-
6 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Fife took a median of 46 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Johnson Poole & Bloomer Limited Agent, registered in Wolverhampton
Active · incorporated 1988 · Wolverhampton
17 applications on PlanIndex · across 7 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
784 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Fife for determination, against a statutory target of eight weeks. Over the last year Fife decided outline applications in a median of 41 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Burrowine Moor Quarry Bogside Blairhall Fife
Alteration and extension to quarry including revised working scheme and concept restoration strategy for the site (Section 42 to temporarily not comply with Condition 34 of Planning Permission Reference 08/03390/EIA to allow for a trial blast)
Withdrawn Full applications Extension 439 docs
Other outline applications
In Fife
-
26/02546/SCR Decided
Hillcairnie Farm Cairnie Cupar Fife KY15 4QD
Screening request for proposed development of 2 No. poultry sheds
-
26/02645/PAS Decided
Fife Ethylene Plant Mossmorran Fife
Pre-application screening opinion (Section 35A) for alterations to and reuse of existing offices and warehouses, and erection of an energetics manufacturing facility comprising process buildings, earth-covered storage magazines with associated earthworks, ancillary buildings, access, parking, landscaping, drainage and associated infrastructure
-
26/02646/SCR Decided
Fife Ethylene Plant Mossmorran Fife
EIA screening opinion for alterations to and reuse of offices and warehouses, and erection of an energetics manufacturing facility comprising process buildings, earth-covered storage magazines with associated earthworks, ancillary buildings, access, parking, landscaping,drainage and associated infrastructure
-
26/02460/SCO Awaiting decision
Sand And Gravel Pits South Of Boulterhall Straiton Balmullo Fife
EIA Scoping Opinion to extend operations by 15 years and revised public road access
-
26/02432/PPP Awaiting decision
Land East Of 25 Venturefair Avenue Dunfermline Fife
Planning Permission in Principle for erection of dwellinghouse, formation of access, hardstanding, landscaping, and associated works Site: Land East of 35 Venturefair Avenue, Dunfermline