Planning application
Burrowine Moor Quarry Bogside Blairhall Fife
Works: Extension
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Alteration and extension to quarry including revised working scheme and concept restoration strategy for the site (Section 42 to temporarily not comply with Condition 34 of Planning Permission Reference 08/03390/EIA to allow for a trial blast)
As published by the council, reference 25/03006/FULL
Application record
- Reference
- 25/03006/FULL
- Type
- Full Planning Permission
- Status
- Withdrawn
- Decision
- Application Withdrawn
- Received
- 3 Nov 2025
- Validated
- 11 Nov 2025
- Decided
- 16 Jun 2026
- Ward
- West Fife And Coastal Villages
- Parish
- Kincardine
Site history
Applications at this address on the Fife register
This site has had 7 applications since 2024.
-
26/00366/SUDO Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Diversion and temporary stop up Order of core path 750 to enable development 08/03390/EIA
-
25/02694/EIA Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
EIA application for the First Periodic Review of Planning Conditions of Mineral Permission 08/03390/EIA - ROMP application under Section 74 of the Town and Country Planning (Scotland) Act 1997
-
08/03390/CND010 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 10 of Planning Permission 08/03390/EIA - path diversion
-
08/03390/CND036 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with condition 36 of approval 08/03390/EIA - restoration plan
-
08/03390/CND049 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 49 of Planning Permission 08/03390/EIA - All works done on or adjacent to existing public roads shall be constructed in accordance with the current Fife Council Transportation Development Guidelines works shall include the items referred to in conditions 50 - 52.
-
08/03390/CND028 Awaiting decision
Burrowine Moor Quarry Bogside Blairhall Fife
Compliance with Condition 28 of Planning Permission 08/03390/EIA - Within 6 months of the date of this permission the developer will submit to the Area Planning Manager a hydrogeological monitoring scheme that will make provision for the collection of groundwater levels around the site at appropriate intervals and for the reporting of the recorded groundwater levels to the Area Planning Manager.
Timeline
Dates from the published record
-
3 Nov 2025
Received by Fife
-
11 Nov 2025
Validated
Checked as complete and ready for consideration.
-
16 Jun 2026
Decision issued: Application Withdrawn
-
6 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Wolverhampton
8 applications on PlanIndex · across 4 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Fife decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Burrowine Moor Quarry Bogside Blairhall Fife
96% historically approved · decision due ~25 Nov
EIA application for the First Periodic Review of Planning Conditions of Mineral Permission 08/03390/EIA - ROMP application under Section 74 of the Town and Country Planning (Scotland) Act 1997
Awaiting decision Outline 777 docs
Other full applications
In Fife
-
26/01900/FULL Granted
The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA
Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panels including replacement of roofing and formation of hardstanding and ancillary drainage (renewal of 23/00519/FULL)
-
26/01862/FULL Granted
56 High Street Elie Leven Fife KY9 1DB
Installation of 4 replacement windows to dormer extension to rear of dwellinghouse
-
26/02417/FULL Awaiting decision
41 Dronachy Road Kirkcaldy Fife KY2 5QL
Single storey front and side extension
-
26/02418/FULL Awaiting decision
10 Woodhead Street High Valleyfield Dunfermline Fife KY12 8SQ
Alterations to roof to rear of dwellinghouse
-
26/01282/FULL Granted
3 High Street Crail Anstruther Fife KY10 3TA
Installation of replacement windows and repainting of walls and front door