Planning application
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Relocation of car parking and installation of EV chargers (Amendment to 21/03339/FULL)
As published by the council, reference 24/01883/FULL
Application record
- Reference
- 24/01883/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Permitted with Conditions
- Received
- 19 Jul 2024
- Validated
- 17 Dec 2024
- Decided
- 14 Oct 2025
- Ward
- Tay Bridgehead
- Parish
- Guardbridge And District
- Decision by
- Delegated - Local Developments
- Postcode
- KY16 0UU
Site history
Applications at this address on the Fife register
This site has had 18 applications since 2021: 17 approved, 0 refused.
-
25/02926/NMV1 Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Erection of new-build facility for research and development (Class 4) (decarbonising the production of energy, fuels and chemicals) including labs, offices, plant, service yard and associated works (amendment to 23/03338/FULL for re-configuration of site layout, revision of envelope design, increase to plant compound scale, and installation of flues and gantry) (Non-Material Variation to proposed change to the solar PV panels on the roof to planning permission 25/02926/FULL)
-
25/02926/CND003 Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Compliance with Condition 3 from application 25/02926/FULL - Landscaping
-
25/02926/CND004 Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Compliance with Condition 4 from application 25/02926/FULL - Boundary Treatments
-
25/03299/CND003 Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Condition with Compliance 3 from application 25/03299/FULL - Tree Relocation / Compensatory Planting
-
25/03299/CND002 Decided
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Condition with Compliance 2 from application 25/03299/FULL - Details of Proposed Materials
-
25/03299/FULL Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Erection of a digital infrastructure building, siting of plant, erection of boundary fencing, formation of hardstanding, and associated works
-
25/02926/FULL Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Erection of new-build facility for research and development (Class 4) (decarbonising the production of energy, fuels and chemicals) including labs, offices, plant, service yard and associated works (amendment to 23/03338/FULL for re-configuration of site layout, revision of envelope design, increase to plant compound scale, and installation of flues and gantry)
-
23/03338/CND004 Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Compliance with Condition 4 of Planning Permission 23/03338/FULL -That before any works start of site, a boundary treatment plan (which shall include details of plant equipment enclosures) shall be submitted to Fife Council as Planning Authority for prior written approval. The approved landscaping plan shall then be implemented on site before the site is brought into use
-
23/03338/CND003 Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Compliance with Condition 3 of Planning Permission 23/03338/FULL -That before any works start on site, a landscaping plan (including maintenance details) shall be submitted to Fife Council as Planning Authority for prior written approval. The approved landscaping plan shall then be implemented on site before the building is brought into use.
-
24/01487/LBC Granted
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Listed building consent for replacement roof (related to 23/03507/LBC - Listed building consent for internal and external works including erection of rear extensions/external stairwell, installation of flues, windows and wall cladding/lourves, stonework and repainting and internal reconfiguration (including downtakings))
Timeline
Dates from the published record
-
19 Jul 2024
Received by Fife
-
17 Dec 2024
Validated
Checked as complete and ready for consideration.
-
14 Oct 2025
Decision issued: Application Permitted with Conditions
-
6 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Opfer Logan Architects LTD Agent, an architecture practice
49 applications on PlanIndex · across 19 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Fife granted permission on 14 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Erection of new-build facility for research and development (Class 4) (decarbonising the production of energy, fuels and chemicals) including labs, offices, plant, service yard and associated works (amendment to 23/03338/FULL for re-configuration of site layout, revision of envelope design, increase to plant compound scale, and installation of flues and gantry) (Non-Material Variation to proposed change to the solar PV panels on the roof to planning permission 25/02926/FULL)
Granted Conditions New dwelling 2 docs -
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Compliance with Condition 3 from application 25/02926/FULL - Landscaping
Granted Conditions 3 docs -
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Compliance with Condition 4 from application 25/02926/FULL - Boundary Treatments
Granted Conditions 4 docs -
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
Condition with Compliance 3 from application 25/03299/FULL - Tree Relocation / Compensatory Planting
Granted Conditions Trees 2 docs -
Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU
98% historically approved · decision due ~13 May
Condition with Compliance 2 from application 25/03299/FULL - Details of Proposed Materials
Decided Conditions 1 doc -
Walter Bower House Eden Campus Main Street Guardbridge St Andrews Fife KY16 0US
96% historically approved · decision due ~20 Aug
Erection of laboratory facility, and associated works
Awaiting decision Full applications 44 docs
Other full applications
In Fife
-
26/02136/FULL Granted
8 Hallowhill St Andrews Fife KY16 8SF
Single storey extension and replacement decking to the rear of dwellinghouse
-
26/01112/FULL Granted
Rathelpie Kennedy Gardens St Andrews Fife KY16 9DJ
Alterations including formation of entrance porch, orangery and terrace to first floor, single storey extension to rear, and erection of single domestic detached garage to front of dwellinghouse
-
26/02404/FULL Granted
West End Collessie Brae Collessie Cupar Fife KY15 7RQ
Alterations to external colour of lime wash
-
26/02326/FULL Granted
Cottage Bank Newmill Farm Foodie Cupar Fife KY15 4RF
Single storey extension to front of dwellinghouse
-
26/02309/FULL Granted
11 The Crescent Dura Den Pitscottie Cupar Fife KY15 5TL
Installation of solar panels and air source heat pump with associated apparatus