North West Of Mepal AD Plant Iretons Way Chatteris Cambridgeshire

Awaiting decision Fenland F/YR25/0905/F Full Planning Permission

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construct an extension to existing anaerobic digester plant including: 8 x digesters, 4 x post digesters with 4 x technical buildings, 2 x pump buildings and 10 x feed hoppers, 1 x gas entry unit, 2 x process gas upgrade areas, 2 x separation bunkers, 1 x straw processing building, 1 x dry digestate storage building, 2 x flare stacks, 1 x site office and 2 x balancing ponds (part retrospective)

As published by the council, reference F/YR25/0905/F

Application record

Reference
F/YR25/0905/F
Type
Full Planning Permission
Status
Pending consideration
Received
24 Sep 2025
Validated
2 Dec 2025
Ward
Chatteris North And Manea
Parish
Manea Parish Council

Timeline

Dates from the published record

  1. 24 Sep 2025

    Received by Fenland

  2. 2 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Fenland took a median of 75 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Arthur Consultancy Services Agent, registered in Loughborough

Active · incorporated 2021 · Loughborough

3 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

148 documents on file for this application

  • CCC LEAD LOCAL FLOOD AUTHORITY Consultee Comment · 10 Aug 2026
  • PUMP FAILURE REPORT Report · 29 Jul 2026
  • DIRTY WATER DRAINAGE STRATEGY Report · 29 Jul 2026
  • SUMMARY TO LLFA OF CHANGES Correspondence · 29 Jul 2026
  • CCC FLOOD RISK TEAM Consultee Comment · 17 Jul 2026
  • DRAINAGE TECHNICAL NOTE Report · 07 Jul 2026
  • EAST CAMBRIDGESHIRE DISTRICT COUNCIL Consultee Comment · 02 Jul 2026
  • HISTORIC ENGLAND Consultee Comment · 05 Jun 2026
  • CCC LEAD LOCAL FLOOD AUTHORITY Consultee Comment · 18 May 2026
  • EMAIL TO AGENT WITH UPDATE AND QUERIES Correspondence · 14 May 2026
  • FDC TREE CONSULTANT Consultee Comment · 04 May 2026
  • ARCHAEOLOGICAL EVALUATION ASSESSMENT Report · 30 Apr 2026
  • ARCHAEOLOGICAL EVALUATION Report · 30 Apr 2026
  • EXISTING AND AVAILABLE ARCHAEOLOGICAL TRENCHING AREA SITE PLAN Drawing · 30 Apr 2026
  • PRE-DEVELOPMENT LEVELS SITE PLAN Drawing · 30 Apr 2026
  • FLOOR LEVEL 150MM ABOVE GROUND LEVEL RESPONSE 1 Drawing · 30 Apr 2026
  • FLOOR LEVEL 150MM ABOVE GROUND LEVEL RESPONSE 2 Drawing · 30 Apr 2026
  • RESPONSE TO LLFA COMMENTS Report · 30 Apr 2026
  • LPA COMMENTS AND RESPONSES Report · 30 Apr 2026
  • ENVIRONMENT AGENCY Consultee Comment · 23 Apr 2026
  • CAMBS FIRE & RESCUE Consultee Comment · 23 Apr 2026
  • CAMBRIDGESHIRE CONSTABULARY Consultee Comment · 20 Apr 2026
  • BRITISH HORSE SOCIETY Consultee Comment · 20 Apr 2026
  • NATURAL ENGLAND Consultee Comment · 16 Apr 2026
  • FDC ENVIRONMENTAL HEALTH Consultee Comment · 15 Apr 2026
  • CCC HIGHWAYS Consultee Comment · 14 Apr 2026
  • MEPAL PARISH COUNCIL Consultee Comment · 13 Apr 2026
  • EAST CAMBS DISTRICT COUNCIL Consultee Comment · 09 Apr 2026
  • CCC LEAD LOCAL FLOOD AUTHORITY (LLFA) Consultee Comment · 08 Apr 2026
  • CHATTERIS TOWN COUNCIL Consultee Comment · 08 Apr 2026
  • CCC TRANSPORT ASSESSMENT TEAM Consultee Comment · 08 Apr 2026
  • ANGLIAN WATER Consultee Comment · 07 Apr 2026
  • CCC COUNTY PLANNING, MINERALS & WASTE Consultee Comment · 07 Apr 2026
  • COVERING LETTER Other · 06 Mar 2026
  • HEALTH IMPACT ASSESSMENT Report · 06 Mar 2026
  • ENVIRONMENT AGENCY BRIEFING NOTE CROP RESIDUES USED AS FEEDSTOCKS IN ANAEROBIC D Report · 06 Mar 2026
  • PROPOSED SITE BLOCK PLAN TRACKING M2A Drawing · 06 Mar 2026
  • PROPOSED SITE BLOCK PLAN TRACKING M2 Drawing · 06 Mar 2026
  • EBOX PROPOSED ELEVATIONS AND FLOOR PLANS Drawing · 06 Mar 2026
  • PROCESS/GAS UPGRADE AREA 1 EQUIPMENT PLAN COLOUR Drawing · 06 Mar 2026
  • PROPOSED OVERALL SITE BLOCK PLAN PLANNING MARKUP Drawing · 06 Mar 2026
  • PIPE BRIDGE 1 AND 2 PLANS AND ELEVATIONS Drawing · 06 Mar 2026
  • PIPE BRIDGE 3 PLAN AND ELEVATIONS Drawing · 06 Mar 2026
  • PROCESS AND STORAGE FFL SECTION PLANNING RESPONSE Drawing · 06 Mar 2026
  • BUILDINGS FFL SITE PLAN Drawing · 06 Mar 2026
  • ADDENDUM TO THE FLOOD RISK ASSESSMENT & SURFACE WATER DRAINAGE STRATEGY Report · 06 Mar 2026
  • HIGHLIGHTED PLANNING STATEMENT Report · 06 Mar 2026
  • PLANNING STATEMENT Report · 06 Mar 2026
  • EMAIL FROM AGENT WITH FURTHER DETAILS Correspondence · 06 Mar 2026
  • HSE COMMENTS Consultee Comment · 04 Mar 2026
  • UK POWER NETWORKS Consultee Comment · 20 Feb 2026
  • ECOLOGY OFFICER COMMENTS Consultee Comment · 19 Feb 2026
  • EMAIL TO AGENT WITH QUERIES Correspondence · 19 Feb 2026
  • ENVIRONMENTAL HEALTH COMMENTS Consultee Comment · 11 Feb 2026
  • FDC ARBORICULTURAL OFFICER Consultee Comment · 01 Feb 2026
  • MEPAL PARISH COUNCIL Consultee Comment · 26 Jan 2026
  • EAST CAMBRIDGESHIRE DISTRICT COUNCIL Consultee Comment · 23 Jan 2026
  • FDC ENVIRONMENTAL HEALTH Consultee Comment · 15 Jan 2026
  • FORTREY'S HALL, ENGINE BANK NR MEPAL Public Comment · 12 Jan 2026
  • MEPAL PARISH COUNCIL Consultee Comment · 06 Jan 2026
  • MEPAL OUTDOOR CENTRE Returned Post · 06 Jan 2026
  • FDC ECOLOGY Consultee Comment · 02 Jan 2026
  • ANGLIAN WATER Consultee Comment · 02 Jan 2026
  • SUTTON PARISH COUNCIL Consultee Comment · 23 Dec 2025
  • ENVIRONMENT AGENCY Consultee Comment · 23 Dec 2025
  • LLFA Consultee Comment · 22 Dec 2025
  • ARCHAEOLOGY Consultee Comment · 22 Dec 2025
  • MIDDLE LEVEL Consultee Comment · 22 Dec 2025
  • HISTORIC ENGLAND Consultee Comment · 22 Dec 2025
  • MANEA PARISH COUNCIL Consultee Comment · 20 Dec 2025
  • GREYS FARM ACCESS ROAD FROM IRETONS WAY TO GREYS FARM HORSLEY FEN CHATTERIS Neighbour Response · 18 Dec 2025
  • CCC DEFINITIVE MAP TEAM Consultee Comment · 18 Dec 2025
  • CCC WASTE AND MINERALS Consultee Comment · 18 Dec 2025
  • BRITISH HORSE SOCIETY Consultee Comment · 18 Dec 2025
  • CCC HIGHWAYS DM TEAM Consultee Comment · 17 Dec 2025
  • CHATTERIS TOWN COUNCIL Consultee Comment · 15 Dec 2025
  • NATURAL ENGLAND Consultee Comment · 15 Dec 2025
  • CAMBS POLICE ? DESIGNING OUT CRIME OFFICERS Consultee Comment · 11 Dec 2025
  • CCC TRANSPORT ASSESSMENT TEAM Consultee Comment · 09 Dec 2025
  • DIRTY WATER DRAINAGE STRATEGY Drawing · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY Drawing · 02 Dec 2025
  • STRAW PROCESSING BUILDING ROOF PLAN Drawing · 02 Dec 2025
  • DRY DIGESTATE STORAGE BUILDING ROOF PLAN Drawing · 02 Dec 2025
  • LANDSCAPE AND VISUAL IMPACT ASSESSMENT Report · 02 Dec 2025
  • TRANSPORT STATEMENT Statement · 02 Dec 2025
  • ECOLOGICAL AIR QUALITY ASSESSMENT Report · 02 Dec 2025
  • ODOUR MANAGEMENT PLAN Report · 02 Dec 2025
  • ODOUR ASSESSMENT Report · 02 Dec 2025
  • NOISE ASSESSMENT Report · 02 Dec 2025
  • NOISE MANAGEMENT PLAN Report · 02 Dec 2025
  • LIGHTING IMPACT ASSESSMENT Report · 02 Dec 2025
  • BNG BASELINE PLAN Drawing · 02 Dec 2025
  • BNG POST DEVELOPMENT PLAN Drawing · 02 Dec 2025
  • ECOLOGY REVIEW Report · 02 Dec 2025
  • STRAW PROCESSING BUILDING ELEVATIONS Drawing · 02 Dec 2025
  • DIGESTERS & TECH ROOM ELEVATIONS Drawing · 02 Dec 2025
  • POST DIGESTERS & TECH ROOM ELEVATIONS Drawing · 02 Dec 2025
  • EXISTING SITE ELEVATIONS Drawing · 02 Dec 2025
  • PROPOSED SITE ELEVATIONS Drawing · 02 Dec 2025
  • STRAW PROCESSING BUILDING, STORAGE TANKS PLAN & ELEVATION Drawing · 02 Dec 2025
  • GAS FLARES & ELEVATIONS Drawing · 02 Dec 2025
  • SEPARATION BUNKER & ELEVATIONS Drawing · 02 Dec 2025
  • FEEDHOPPER PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • PROPOSED DRAINAGE CONSTRUCTION DETAILS (SHEET 3) Drawing · 02 Dec 2025
  • PROPOSED DRAINAGE CONSTRUCTION DETAILS (SHEET 1) Drawing · 02 Dec 2025
  • PROPOSED DRAINAGE CONSTRUCTION DETAILS (SHEET 2) Drawing · 02 Dec 2025
  • DRY DIGESTATE STORAGE BUILDING ELEVATIONS Drawing · 02 Dec 2025
  • LANDSCAPE PROPOSALS PLAN (1 OF 2) Drawing · 02 Dec 2025
  • LANDSCAPE PROPOSALS PLAN (2 OF 2) Drawing · 02 Dec 2025
  • ARCHAEOLOGICAL REPORT Report · 02 Dec 2025
  • BNG STATEMENT Statement · 02 Dec 2025
  • BNG SUPPORTING STATEMENT Statement · 02 Dec 2025
  • LOCATION PLAN Drawing · 02 Dec 2025
  • EXISTING SITE PLAN Drawing · 02 Dec 2025
  • DIGESTERS & TECH ROOM PLAN VIEW Drawing · 02 Dec 2025
  • POST DIGESTERS & PUMP ROOM PLAN VIEW Drawing · 02 Dec 2025
  • STRAW PROCESSING BUILDING FLOOR PLAN Drawing · 02 Dec 2025
  • GAS ENTRY UNIT FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • SITE OFFICE FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • DRY DIGESTATE STORAGE BUILDING FLOOR PLAN Drawing · 02 Dec 2025
  • AS BUILT SITE LAYOUT Drawing · 02 Dec 2025
  • PROPOSED SITE PLAN Drawing · 02 Dec 2025
  • PROPOSED SITE PLAN (OVERALL SITE) Drawing · 02 Dec 2025
  • PROCESS/GAS UPGRADE AREA 1 EQUIPMENT LAYOUT Drawing · 02 Dec 2025
  • UPGRADE AREA 1 LOCATION PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • PROCESS/GAS UPGRADE AREA 2 PLAN Drawing · 02 Dec 2025
  • UPGRADE AREA 2 LOCATION PLAN & ELEVATIONS Drawing · 02 Dec 2025
  • COMPRESSOR UNIT FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • REFRIGERANT COMPRESSOR FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • CO2 SKID FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • BIOGAS SKID FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • HP CHP CARBON DIOXIDE COMPRESSOR BUILDING FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • MAIN CONTROL ROOM FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • ELECTRICAL CABIN FLOOR PLAN AND ELEVATIONS Drawing · 02 Dec 2025
  • MEMBRANE UNIT FLOOR PLANS AND ELEVATIONS Drawing · 02 Dec 2025
  • HEALTH IMPACT ASSESSMENT CANCELLED · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 9) Flood Risk Assessment · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 8) Flood Risk Assessment · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 7) Flood Risk Assessment · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 6) Flood Risk Assessment · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 5) Flood Risk Assessment · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 4) Flood Risk Assessment · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 3) Flood Risk Assessment · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 2) Flood Risk Assessment · 02 Dec 2025
  • SURFACE WATER DRAINAGE STRATEGY (PART 1) Flood Risk Assessment · 02 Dec 2025
  • FLOOR AREA CALCULATIONS Other · 02 Dec 2025
  • PLANNING STATEMENT CANCELLED · 02 Dec 2025
  • RENEWABLE ENERGY STATEMENT Statement · 02 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Fenland for determination, against a statutory target of eight weeks. Over the last year Fenland decided full applications in a median of 84 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Mepal Outdoor Centre Chatteris Road Mepal Ely Cambridgeshire CB6 2AZ

    21/00681/SCREEN Submitted 17 May 2021 249m away

    SCREENING OPINION - Proposed Construction of a crematorium and associated service and administration building, function building, memorial garden, natural burial areas, pet cemetery, car parking, new vehicular access from the A142 to the north of the site and landscaping

    Decided Outline 23 docs
  • Barn East Of Markwells Farm House Block Fen Drove Chatteris Cambridgeshire

    F/YR21/0542/F Submitted 15 Mar 2021 354m away

    Conversion of existing barn to a dwelling (2-storey, 3-bed) involving the demolition of existing single-storey front extension

    Granted Full applications Extension Demolition 29 docs
    Small domestic
  • Lake View Bereavement Centre And Crematorium Chatteris Road Mepal Ely Cambridgeshire CB6 2AZ

    26/00191/VAR3M Submitted 17 Feb 2026 367m away

    94% historically approved · decision due ~19 May

    To vary conditions 1 (approved plans), 15 (hard landscaping), 16 (external lighting), 19 (soft landscaping), 24 (Foul Water Drainage), 25 (Surface Water Drainage) 28 (Materials) and 31 (visibility splays) of previously approved 25/00176/VAR3M for variation of Conditions 1 (Approved Plans), 8 (Contamination), 12 (Sustainability), 13 (Operating Hours), 14 (Use of Function Room), 15 (Hard Landscaping), 16 (External Lighting), 19 (Soft Landscaping), 21 (Tree Protection), 24 (Foul Water Drainage), 25 (Surface Water Drainage), Condition 27 (External Materials), 28 (Flower Court & Function Room), 29 (Boundary Treatments), 31 (Visibility Splays), 34 (Fire Hydrants) and 35 (Delivery Times) for previously approved 21/01216/F3M dated 26 October 2022 for construction of a crematorium and associated service and administration building, function building, memorial garden, natural burial areas, pet cemetery, car parking, new vehicular access from the A142 north of the site and landscaping

    Awaiting decision Amendments Trees 82 docs
    Major scheme
  • Mepal Outdoor Centre Chatteris Road Mepal Cambridgeshire CB6 2AZ

    25/00176/DISA Submitted 7 Jul 2025 367m away

    To discharge Conditions 4 (CEMP) 8 (contamination) 9 (contamination remediation) 17 (ecology) and 18 (LEMP) of decision dated 6 May 2025 ref. 25/00176/VAR3M for To Vary Conditions 1 (Approved Plans), 8 (Contamination), 12 (Sustainability), 13 (Operating Hours), 14 (Use of Function Room), 15 (Hard Landscaping), 16 (External Lighting), 19 (Soft Landscaping), 21 (Tree Protection), 24 (Foul Water Drainage), 25 (Surface Water Drainage), Condition 27 (External Materials), 28 (Flower Court & Function Room), 29 (Boundary Treatments), 31 (Visibility Splays), 34 (Fire Hydrants) and 35 (Delivery Times) for previously approved 21/01216/F3M dated 26 October 2022 for construction of a crematorium and associated service and administration building, function building, memorial garden, natural burial areas, pet cemetery, car parking, new vehicular access from the A142 north of the site and landscaping

    Granted Conditions Trees 43 docs

In Fenland

  • F/YR26/0671/F Awaiting decision

    Potato Processing Plant Weasenham Lane Wisbech Cambridgeshire PE13 2RN

    Erect a fire suppression sprinkler tank and pump house

    7 Sep 2026 Full applications
  • F/YR26/0573/F Granted

    57A Station Road Manea March Cambridgeshire PE15 0HE

    Erect a single-storey extension to the side of existing dwelling involving demolition of porch

    7 Jul 2026 Full applications
  • F/YR26/0673/F Awaiting decision

    27 Linden Drive Chatteris Cambridgeshire PE16 6DZ

    Installation of 1 x Pergola

    4 Sep 2026 Full applications
  • F/YR26/0450/F Granted

    West Fen Farm Whitemoor Road March Cambridgeshire

    Erect an agricultural building (for free range egg production) and the formation of an attenuation pond

    22 May 2026 Full applications
  • F/YR26/0413/F Granted

    Land North Of 120 London Road Chatteris Cambridgeshire

    Erect 1 x dwelling and the formation of an access

    14 May 2026 Full applications