Planning applications in Fenland, September 2025
Fenland recorded 8 planning applications in September 2025, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, September 2025
Newest first
-
F/YR25/0979/LB Awaiting decision
5 Nene Quay Wisbech Cambridgeshire PE13 1AQ
Internal and external works to a Listed Building to form 6 x residential flats involving the alteration of the shop front
-
F/YR25/0884/LB Granted
Barns North East Of Park House Park Road Tydd St Giles Cambridgeshire
Internal and external works to a curtilage listed building to enable the conversion of existing barns to 1 x dwelling
-
F/YR25/0905/F Awaiting decision
North West Of Mepal AD Plant Iretons Way Chatteris Cambridgeshire
Construct an extension to existing anaerobic digester plant including: 8 x digesters, 4 x post digesters with 4 x technical buildings, 2 x pump buildings and 10 x feed hoppers, 1 x gas entry unit, 2 x process gas upgrade areas, 2 x separation bunkers, 1 x straw processing building, 1 x dry digestate storage building, 2 x flare stacks, 1 x site office and 2 x balancing ponds (part retrospective)
-
F/YR25/0883/F Granted
Barns North East Of Park House Park Road Tydd St Giles Cambridgeshire
Conversion of existing barns to 1 x self-build/custom build dwelling and the formation of an access
-
F/YR25/0730/PIP Granted
Land North Of The Quadrant Primrose Hill Doddington Cambridgeshire
Permission in Principle for 2 x dwellings
-
F/YR25/0726/PIP Granted
Land South Of 29 Primrose Hill Doddington Cambridgeshire
Permission in Principle for 2 x dwellings
-
F/YR26/0008/O Awaiting decision
Land South Of 1-13 And 16-28 Wimblington Road Doddington Cambridgeshire
Erect up to 37no dwellings, the formation of a vehicular access and associated works including necessary sustainable drainage and open space (outline application with all matters reserved)
-
F/YR26/0011/F Granted
Land South East Of Manor Farm 344 Main Road Church End Parson Drove Cambridgeshire
Change of use to camp site and erect 1 x single-storey building (washing area) and 1 x single-storey toilet/shower block (part-retrospective)
Other months in 2025
- March 2025 5
- May 2025 2
- June 2025 2
- July 2025 1
- August 2025 3
- September 2025 8
- October 2025 7
- November 2025 4
- December 2025 6