Planning application
25 Nicholas Road Exeter EX1 3AT
Works: Extension Loft or dormer Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non material amendment to planning permission 20/0024/FUL for changes to the proposed roof shape; installation of rooflights; changes to windows; changes to the front porch.
As published by the council, reference 26/1678/NMA
Application record
- Reference
- 26/1678/NMA
- Type
- Non-Material Amendment
- Status
- Pending Consideration
- Received
- 6 Nov 2026
- Validated
- 6 Nov 2026
- Ward
- Heavitree
- Postcode
- EX1 3AT
Timeline
Dates from the published record
-
6 Nov 2026
Received by Exeter
-
17 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Exeter took a median of 54 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Barnfield Architects Agent, an architecture practice
5 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with Exeter for determination, against a statutory target of eight weeks. Over the last year Exeter decided amendment applications in a median of 32 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
15 Nicholas Road Exeter EX1 3AT
Rear single story extension.
Granted Lawful development Extension 7 docs -
13 Nicholas Road Exeter Devon EX1 3AT
Loft conversion, hip to gable and rear dormer roof extensions and two roof lights to front.
Granted Lawful development Extension Loft or dormer 5 docs -
1 Nicholas Road Exeter Devon EX1 3AT
Construction of rear dormer and hip to gable roof extension (Retrospective Application).
Refused Full applications Extension Loft or dormer 13 docs -
1 Lymeborne Avenue Exeter EX1 3AU
Demolition of garage and erection of a 2-storey side extension.
Refused Full applications Extension Demolition 15 docs -
17 Whipton Lane Exeter Devon EX1 3DN
Hip-to-gable extension, rear flat roofed dormer and roof lights.
Granted Lawful development Extension Loft or dormer 21 docs -
78 Whipton Lane Exeter Devon EX1 3DN
Single storey rear and side extensions.
Granted Full applications Extension 6 docsSmall domestic
Other amendment applications
In Exeter
-
26/1423/VOC Refused
66 Blenheim Road Exeter EX2 8SE
Variation of condition 2 of 26/0978/FUL (Date of Decision: 04/09/2026) which had granted permission for Single-storey rear extension with flat roof, rooflights, and rear bifold doors. The variation seeks to increase the extension depth from 4.5 metres to 5.5 metres and to include a parapet surround.
-
26/1708/NMA Awaiting decision
Land South Of 20 Cowley Bridge Road Exeter
Non-material amendment to planning permission 23/0232/FUL to add a new condition stating the development can be carried out in two phases with substation in phase 1 and rest of development in phase 2.
-
26/1677/NMA Awaiting decision
Land To The North Of Topsham Road Exeter
Non-material amendment to reserved matters approval 23/1237/RES to amend external finishing materials and corbel details.
-
26/1673/NMA Awaiting decision
3 School Lane Exeter EX2 6LA
Non-material amendment to planning application 19/1704/FUL (Single-storey rear and front extensions, internal and external alterations and new porch) - reduced extent of rear extension and amendment to external finish to proposed elevations.
-
26/1666/NMA Awaiting decision
38 Elm Grove Road Topsham Exeter EX3 0EJ
Non-material amendment to application 25/1630/FUL to increase in the extent of previously approved render in place of facing brickwork, together with the introduction of natural stone facing to the ground-floor gable and inclusion of one Air Source Heat Pump and 18 Photovoltaic panels.