Planning application
Topsham Museum The Strand Topsham EX3 0AX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Install information sign for new Topsham Heritage Trail
As published by the council, reference 24/1083/FUL
Application record
- Reference
- 24/1083/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 20 Sep 2024
- Validated
- 20 Sep 2024
- Decided
- 29 Nov 2024
- Ward
- Topsham
- Decision by
- Delegated Decision
- Postcode
- EX3 0AX
Site history
Applications at this address on the Exeter register
This site has had 2 applications since 2024: 2 approved, 0 refused.
-
24/1084/LBC Granted
Topsham Museum The Strand Topsham EX3 0AX
Install information sign for new Topsham Heritage Trail
Timeline
Dates from the published record
-
20 Sep 2024
Received by Exeter
-
29 Nov 2024
Decision issued: Permitted
-
12 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Exeter
35 applications on PlanIndex · across 4 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Exeter granted permission on 29 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Topsham Museum The Strand Topsham EX3 0AX
Install information sign for new Topsham Heritage Trail
Granted Heritage and listed buildings 13 docs -
22 The Strand Topsham EX3 0AS
Replace garden steps with timber steps, through the opening in the existing wall. To add timber doors to shed. Repair the slate roof of shed. Add doors to the extension. Re-pave the courtyard area.
Granted Full applications Extension Roofing 19 docsSmall domestic -
22 The Strand Topsham EX3 0AS
A new timber staircase in the yard, strip and relay of roof and other minor alterations.
Granted Heritage and listed buildings 17 docs -
22 The Strand Topsham EX3 0AS
89% historically approved · decision due ~5 Oct
Discharge Condition 4 (Materials) of the previously approved 25/0470/FUL
Awaiting decision Conditions 6 docs -
25 The Strand Topsham EX3 0AX
LIME RENDER SPECIFICATION Undertake rendering to all external walls of the building as shown on elevation drawings, with a lime render system as specification provided by Cornish lime comprising:- - Harling coat. - Dubbing out. - 1st lime render scratch coat with flock fibres & fibre glass bedded in. - 2nd lime render scratch coat with flock fibres. - Lime render float coat. - Roughcast final coat to match existing finish. To areas of existing cob walling supply and install dry fix stucco helifix pins or helifix patch pins driven into the cob with a helical bar driver into pre drilled holes and a downward angle Specification details: Dub out any deep holes in the wall with a Haired Lime Mortar. Rebuild defects with bricks, stone or cob blocks as appropriate. Treat wooden lintels with preservative and counter batten with lath if rendering over them. Apply a 3 mm hand harled coat of Secil Consolidation Mortar to provide a key to the wall. Leave to dry for a minimum of 24 hours. 15 mm scratch coat of Haired Lime Mortar with added pozzolan (Argical) to smooth the contours of the wall. (7 parts mortar to 1 part pozzolan). The hair reduces any slumping whilst applying and shrinkage cracking whilst curing. Key with a scratch comb. Leave to dry for approximately 5-7 days. 10 mm float coat of Unhaired Lime Mortar with added pozzolan (Argical). (7 parts mortar to 1 part pozzolan). Finish to be rough cast, apply an additional coat of hand harled lime mortar or Secil Consolidation Mortar. CONTROL AND PROTECTION Control suction by lightly spraying the surface with water half and hour before applying each coat. In warm weather it may be necessary to spray with water afterwards. Protect each render coat during the curing process from the elements such as hot drying wind, strong sun, rain and don't apply in temperatures below 5 degrees centigrade when there?s a risk of frost. Cover with hessian sheet and should leave in place as long as necessary. CURING Allow fo
Decided Conditions 8 docs -
27 The Strand Topsham EX3 0AX
Internal reconfigurations at ground, first and second floors, side infill extension, and removal of external steps.
Granted Heritage and listed buildings Extension 21 docs
Other full applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension