Planning application
Nonsuch Booster Station Kiln Lane Epsom Surrey
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The removal of 3 antennae on support poles, the addition of 12 remote radio head's on a unistrut frame and ancillary equipment
As published by the council, reference 19/01395/NOTTE
Application record
- Reference
- 19/01395/NOTTE
- Type
- Telecom Development - Notification
- Status
- Decided
- Decision
- No Objections
- Received
- 16 Oct 2019
- Validated
- 16 Oct 2019
- Decided
- 8 Nov 2019
- Ward
- Town
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
16 Oct 2019
Received by Epsom and Ewell
-
8 Nov 2019
Decision issued: No Objections
-
21 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Glasgow
232 applications on PlanIndex · across 35 councils · 65% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About telecoms applications
How this application type works
Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.
Nearby applications
Within 500 metres
-
Mercedes Benz Epsom 1 Weston Road Epsom Surrey KT17 1JG
Formation of Additional Vehicular Access
Granted Full applications 14 docs -
Wilsons Automobiles And Coachworks Kiln Lane Epsom Surrey KT17 1DH
Sign 1a - Hyundai fascia sign Sign 1b - Hyundai fascia sign Sign 2 - Entrance gate Sign 3 - totem
Granted Advertising 6 docs -
Wickes Kiln Lane Epsom Surrey KT17 1EQ
Display of 2No non-illuminated fascia signs and display of 2No. internally illuminated fascia signs
Granted Advertising 10 docs -
Norden Plumbing And Heating Ltd Unit 4 Nonsuch Industrial Estate Kiln Lane Epsom Surrey KT17 1DH
Installation of 2No. electric vehicle charging points and installation of windows to first floor
Granted Full applications Windows or glazing 11 docs -
Conifer Park Kiln Lane Surrey Epsom KT17 1DY
Details of a Drainage Verification Report submitted pursuant to Condition 7 of planning permission ref: EP25/00103/CMA dated 12 June 2025. (this application is determined by Surrey County Council under their ref SCCRef-2026-0055)
Granted Outline 9 docs -
Conifer Park Kiln Lane Surrey Epsom KT17 1DY
Details of a Landscape Ecological Management Plan (LEMP) submitted pursuant to Condition 4 of planning permission ref: EP25/00103/CMA dated 12 June 2025 (this application is determined by Surrey County Council under their ref SCCRef-2025-0219)
Granted Outline 7 docs
Other telecoms applications
In Epsom and Ewell
-
26/00594/NOTTE Granted
Outside 5 Trigo Court Epsom Surrey
Install approximately 36 metre(s) of underground duct and cables
-
26/00430/NOTTE Granted
Telecommunications Mast Derby Stables Road Epsom Surrey KT18 5LE
Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights for the replacement of 3no antennas, with 3no new antennas on existing support structure, including the internal upgrade of existing equipment cabinet at ground level, and all ancillary works thereto.
-
26/00414/NOTTE Granted
Telecommunications Mast Derby Stables Road Epsom Surrey KT18 5LE
Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights for the proposed replacement of an existing base station, comprising the existing timber fencing to be replaced with 2m steel palisade fencing and ancillary development thereto. By replacing an existing base station in the same location at the same height and broadly similar scale the visual impact of the development on the surrounding area has been minimised so far as practicable.
-
26/00222/T56 Refused
Telecommunications Mast - EE Cheam Road Cheam Surrey
Notification Application in terms of Part 16 of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015: Removal of 1no. existing 6-metre-high lamppost pole with 3no. antennas, 1no. existing equipment cabinet to be replaced with 1no. new 20-metre-high phase 9 pole monopole with wraparound cabinet to accommodate 6no. new antennas, 1no. new GPS node, 2no. new equipment cabinets and associated ancillary works thereto.
-
26/00324/NOTTE Granted
Kiosk And ATM Outside 421 Kingston Road Epsom Surrey
Removal of 1 public payphone outside 421 Kingston Road due to declining usage