Skip to content
PlanIndex Get alerts
Menu

Planning application

Outside 5 Trigo Court Epsom Surrey

Granted Epsom and Ewell 26/00594/NOTTE Telecom Development - Notification

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Install approximately 36 metre(s) of underground duct and cables

As published by the council, reference 26/00594/NOTTE

Application record

Reference
26/00594/NOTTE
Type
Telecom Development - Notification
Status
Decided
Decision
No Objections
Received
18 May 2026
Validated
18 May 2026
Decided
29 Jun 2026
Ward
Court
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 18 May 2026

    Received by Epsom and Ewell

  2. 29 Jun 2026

    Decision issued: No Objections

  3. 30 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Openreach Limited Agent

894 applications on PlanIndex · across 81 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

  • Site Location Plans Plans · 18 May 2026
  • Supporting Letter Supporting Information · 18 May 2026
  • Wayleave Agreement Supporting Information · 18 May 2026
  • Supporting Letter 2 Supporting Information · 18 May 2026
  • Application Letter Supporting Information · 18 May 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Epsom and Ewell granted permission on 29 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About telecoms applications

Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 29 Tonstall Road Epsom Surrey KT19 9DR

    25/01327/CLP Submitted 11 Nov 2025 143m away

    Lawful Development Certificate - Proposed Use: Formation of a vehicular access including dropped kerb

    Granted Lawful development 9 docs
  • 53 Tonstall Road Epsom Surrey KT19 9DR

    25/01003/FLH Submitted 8 Sep 2025 163m away

    Single storey rear extension

    Granted Householder Extension 21 docs
    Small domestic
  • 1 Tonstall Road Epsom Surrey KT19 9DR

    26/00547/FLH Submitted 29 May 2026 165m away

    Single storey rear extension with rear access ramp

    Granted Householder Extension 13 docs
    Small domestic
  • 228 Hook Road Epsom Surrey KT19 8UB

    26/00144/FLH Submitted 24 Feb 2026 174m away

    Demolition of existing rear garden shed and installation of a rear garden outbuilding to accommodate a gym/summerhouse

    Granted Householder Demolition 14 docs
    Small domestic
  • 77 Tonstall Road Epsom Surrey KT19 9DR

    19/01514/NMA Submitted 14 Nov 2019 175m away

    Non-material amendment of planning permission 19/00405/FLH dated 07.06.2019 to allow reconfiguration of the approved rear elevation ground floor door (increasing width from 0.65m to 1.6m).

    Granted Amendments 4 docs
  • 6 Tomlin Close Epsom Surrey KT19 8SA

    25/00979/FLH Submitted 22 Aug 2025 178m away

    Single storey rear infill extension (retrospective)

    Granted Householder Extension 13 docs
    Small domestic

In Epsom and Ewell

  • 26/00873/NOTTE Granted

    Telecommunications Mast - EE And 3 Blenheim Road Epsom Surrey

    Notification under the Electronic Communications Code Regulations of the intention to replace three antennas, replace one cabinet, remove one cabinet and development ancillary rewords thereto.

    17 Jul 2026 Telecoms
  • 26/00872/NOTTE Granted

    Rooftop Of Sorting Office 18 East Street Epsom Surrey KT17 1BB

    Notification under the Electronic Communications Code Regulations of the intention for the removal of the existing 3 antennas and steel supports on the 19.05m roof of the building, replacing them with 6 antennas apertures, 2 on the north corner of the roof, 2 on the southwestern corner and two on the south elevation on new support steelwork giving a max height of 24.32m AGL (5.27m above the plant room roof)

    17 Jul 2026 Telecoms
  • 26/00430/NOTTE Granted

    Telecommunications Mast Derby Stables Road Epsom Surrey KT18 5LE

    Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights for the replacement of 3no antennas, with 3no new antennas on existing support structure, including the internal upgrade of existing equipment cabinet at ground level, and all ancillary works thereto.

    2 Apr 2026 Telecoms
  • 26/00414/NOTTE Granted

    Telecommunications Mast Derby Stables Road Epsom Surrey KT18 5LE

    Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights for the proposed replacement of an existing base station, comprising the existing timber fencing to be replaced with 2m steel palisade fencing and ancillary development thereto. By replacing an existing base station in the same location at the same height and broadly similar scale the visual impact of the development on the surrounding area has been minimised so far as practicable.

    26 Mar 2026 Telecoms
  • 26/00222/T56 Refused

    Telecommunications Mast - EE Cheam Road Cheam Surrey

    Notification Application in terms of Part 16 of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015: Removal of 1no. existing 6-metre-high lamppost pole with 3no. antennas, 1no. existing equipment cabinet to be replaced with 1no. new 20-metre-high phase 9 pole monopole with wraparound cabinet to accommodate 6no. new antennas, 1no. new GPS node, 2no. new equipment cabinets and associated ancillary works thereto.

    23 Feb 2026 Telecoms