Skip to content
PlanIndex Get alerts
Menu

Planning application

Norden Plumbing And Heating Ltd Unit 4 Nonsuch Industrial Estate Kiln Lane Epsom Surrey KT17 1DH

Granted Epsom and Ewell 24/01270/FUL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 2No. electric vehicle charging points and installation of windows to first floor

As published by the council, reference 24/01270/FUL

Application record

Reference
24/01270/FUL
Type
Full Planning Permission
Status
Decided
Decision
Application Permitted
Received
1 Oct 2024
Validated
1 Oct 2024
Decided
25 Nov 2024
Ward
Town
Decision by
Delegated Decision
Postcode
KT17 1DH

Timeline

Dates from the published record

  1. 1 Oct 2024

    Received by Epsom and Ewell

  2. 25 Nov 2024

    Decision issued: Application Permitted

  3. 5 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

29 applications on PlanIndex · across 10 councils · 90% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Wilsons Automobiles And Coachworks Kiln Lane Epsom Surrey KT17 1DH

    19/01472/ADV Submitted 6 Nov 2019 46m away

    Sign 1a - Hyundai fascia sign Sign 1b - Hyundai fascia sign Sign 2 - Entrance gate Sign 3 - totem

    Granted Advertising 6 docs
  • Wilsons Automobiles And Coachworks Kiln Lane Epsom Surrey KT17 1DH

    26/00790/ADV Submitted 16 Jul 2026 72m away

    87% historically approved · decision due ~10 Sep

    Display of 1 internally illuminated totem sign, 1 non-illuminated welcome sign and 1 internally illuminated fascia sign

    Awaiting decision Advertising
  • Nonsuch Booster Station Kiln Lane Epsom Surrey

    19/01395/NOTTE Submitted 16 Oct 2019 126m away

    The removal of 3 antennae on support poles, the addition of 12 remote radio head's on a unistrut frame and ancillary equipment

    Granted Telecoms 7 docs
  • Mercedes Benz Epsom 1 Weston Road Epsom Surrey KT17 1JG

    26/00487/FUL Submitted 15 May 2026 133m away

    Formation of Additional Vehicular Access

    Granted Full applications 14 docs
  • Conifer Park Kiln Lane Surrey Epsom KT17 1DY

    26/00473/CMA Submitted 14 Apr 2026 192m away

    Details of a Drainage Verification Report submitted pursuant to Condition 7 of planning permission ref: EP25/00103/CMA dated 12 June 2025. (this application is determined by Surrey County Council under their ref SCCRef-2026-0055)

    Granted Outline 9 docs
  • Conifer Park Kiln Lane Surrey Epsom KT17 1DY

    26/00085/CMA Submitted 26 Jan 2026 192m away

    Details of a Landscape Ecological Management Plan (LEMP) submitted pursuant to Condition 4 of planning permission ref: EP25/00103/CMA dated 12 June 2025 (this application is determined by Surrey County Council under their ref SCCRef-2025-0219)

    Granted Outline 7 docs

In Epsom and Ewell

  • 26/00901/FUL Awaiting decision

    1 Windmill Avenue Epsom Surrey KT17 1LL

    Demolition of existing single storey dwelling and construction of a two storey, 4 bedroom dwelling (retrospective)

    Full applications
  • 26/00961/FUL Awaiting decision

    9, 9B, 9C And 9D St Martins Avenue Epsom Surrey KT18 5HT

    Demolition of No.9c and single-storey extension to the rear of No.9, alterations to the rear elevation of No.9 and conversion for use as a single dwellinghouse, and the erection of 1 no. detached 2½ storey house and 2 no. semi-detached 2½ houses at the rear, together with associated access, car parking, bin stores, cycle stores, landscaping and amenity space.

    Full applications
  • 26/00900/FUL Awaiting decision

    First And Second Floor Flat Above 20 High Street Epsom Surrey KT19 8AH

    Replacement of front elevation windows at first and second floor

    Full applications
  • 26/00948/FUL Awaiting decision

    1 Ewell House Parade Epsom Road Epsom Surrey KT17 1NP

    Retrospective application for a side boundary fence 1.2m high

    Full applications
  • 26/00842/FUL Awaiting decision

    38 The Warren Worcester Park Surrey KT4 7DL

    Change of use from a single detached dwellinghouse (Use Class C3) to a private residential care home (Use Class C2)

    Full applications