Planning application

Land between 32a and 33 Downlands, Waltham Abbey, Essex, EN9 1UH

Awaiting decision Epping Forest EPF/1521/22 Full planning permission

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of condition 2 of planning permission EPF/0601/18 to vary the approved plan numbers to change the external materials of construction and the design and location of the first floor windows in the rear elevations of the houses

As published by the council, reference EPF/1521/22

Application record

Reference
EPF/1521/22
Type
Full planning permission
Status
New Application
Received
1 Jul 2022
Validated
1 Jul 2022
Decision by
Delegated Decision
Postcode
EN9 1UH

Timeline

Dates from the published record

  1. 1 Jul 2022

    Received by Epping Forest

  2. 27 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 26 August 2022, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Epping Forest took a median of 56 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Epping Forest for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 32A, Downlands, Waltham Abbey, EN9 1UH

    EPF/2524/22 Submitted 7 Nov 2022 0m away

    Application for Approval of Details reserved by condition 10"details & location of parking spaces" for EPF/1521/22. (Variation of condition 2 of planning permission (Relocation of existing public footpath and erection of two semi-detached houses ref: EPF/0601/18) to vary the approved plan numbers to change the external materials of construction; the design and location of the first floor windows in the rear elevations of the houses and first floor rear additions with gable roofs.

    Granted Conditions Windows or glazing 8 docs
  • 32A, Downlands, Waltham Abbey, EN9 1UH

    EPF/2467/22 Submitted 27 Oct 2022 0m away

    Application for approval of details reserved by condition 4 'Surface Water Disposal' and condition 7 'External Materials' on EPF/1521/22 (Variation of condition 2 of planning permission (Relocation of existing public footpath and erection of two semi-detached houses ref: EPF/0601/18) to vary the approved plan numbers to change the external materials of construction; the design and location of the first floor windows in the rear elevations of the houses and first floor rear additions with gable roofs)

    Split decision Conditions Windows or glazing 7 docs
  • Land between 32a and 33 Downlands, Waltham Abbey, Essex, EN9 1UH

    EPF/1464/22 Submitted 27 Jun 2022 0m away

    Approval of Details Reserved by Condition 3 `Details of external finishes' of EPF/0601/18 (Relocation of footpath and erection of two semi- detached houses).

    Granted Conditions 4 docs
  • 33 Downlands, Waltham Abbey, EN9 1UH

    EPF/1264/22 Submitted 1 Jun 2022 0m away

    Proposed Double side extension

    Granted Householder Extension 6 docs
    Domestic
  • 21 Downlands Waltham Abbey EN9 1UH

    EPF/1646/21 Submitted 11 Jun 2021 65m away

    Application for a Lawful Development certificate for a proposed loft conversion.

    Decided Lawful development Loft or dormer 10 docs
  • 3, Tennyson Avenue, Waltham Abbey, EN9 3BJ

    EPF/1085/26 Submitted 3 Jun 2026 136m away

    Single storey wrap around extension.

    Granted Householder Extension 11 docs
    Small domestic

In Epping Forest

  • EPF/1035/26 Refused

    Beechside Nursery, Mott Street, Waltham Abbey, E4 7RW

    Residential redevelopment of mixed B8 and E use site for 5 new dwellings.

    27 May 2026 Full applications
  • EPF/1673/26 Awaiting decision

    Gypsy Mead Works, Ongar Road, Fyfield, Ongar, CM5 0RB

    Proposed boundary amendment to previously consented scheme under EPF/0016/19 relating to Plots 5 to 6 (Proposed development of x 23 no. new homes with associated parking facilities, cycle stores and rubbish disposal (FYF.R1 - Allocated Site in Fyfield).

    1 Sep 2026 Full applications
  • EPF/1417/26 Granted

    Epping Sports Club, Lower Bury Lane, Epping, CM16 5HA

    Erection of safety netting along the northeast boundary of the cricket club and Lower Bury Lane.

    21 Jul 2026 Full applications
  • EPF/1036/26 Granted

    Bentons Farm, Middle Street, Nazeing, Waltham Abbey, EN9 2LN

    Proposed Infill to create 1 chalet-style dwelling.

    27 May 2026 Full applications
  • EPF/1311/26 Refused

    Carlton Farm, Middle Street, Nazeing, Waltham Abbey, EN9 2LH

    Erection of agricultural barn.

    2 Jul 2026 Full applications