Skip to content
PlanIndex Get alerts
Menu

Planning application

EPF/1321/26

Lodge Farm Albyns lane Navestock Romford RM4 1HR

Awaiting decision Epping Forest Full planning permission

Proposal

Demolition of existing farmhouse and construct a single storey 2 bedroom dwellinghouse with detached garaging. (Majority of site within Brentwood Borough Council area).

As published by the council, reference EPF/1321/26

Timeline

Dates from the published record

  1. 6 Jul 2026

    Received by Epping Forest

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Epping Forest for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00730/FUL Awaiting decision

    Lodge Farm Albyns Lane Stapleford Tawney Essex RM4 1HR

    Demolition of existing farm house and construct a single storey 2 bedroom dwellinghouse with detached garaging.

    17 Jul 2026 110m away Full applications
  • 24/01281/HHA Awaiting decision

    Stan Sted Cottage Albyns Lane Navestock Essex RM4 1HR

    Proposed side extension, internal reconfiguration, and roof alterations with the addition of a dormer window and a conservation roof light

    15 Nov 2024 204m away Householder

In Epping Forest

  • EPF/1139/26 Refused

    Land to rear of Gables, Church Lane, Sheering, Harlow, CM22 7NR

    Stable building.

    9 Jun 2026 Full applications
  • EPF/1468/26 Awaiting decision

    Sedge Gate Nursery, Sedge Green, Nazeing, Waltham Abbey, EN9 2PA

    Retrospective reinstatement of the northern vehicular access from Sedge Green to serve as the access and egress for Units 12–31 Leaside Industrial Park (formerly Sedge Gate Nursery).

    30 Jul 2026 Full applications
  • EPF/0874/26 Refused

    Petrol Filling Station, Chelmsford Rd, Norton Heath, Ingatestone CM4 0LQ

    Retrospective application for erection of extension to existing building, new bin store area and 2 EV charging spaces with associated infrastructure.

    5 May 2026 Full applications
  • EPF/1454/26 Awaiting decision

    58, Queens Road, Buckhurst Hill, IG9 5BY

    Retrospective application for the erection and retention of an extractor flue to the rear elevation and containers to rear of outrigger.

    28 Jul 2026 Full applications
  • EPF/1031/26 Granted

    Abbess Roding Hall, Green Hill Road, Ongar, CM5 0PA

    Construction of a single self-build residential dwelling alongside associated development.

    27 May 2026 Full applications