DC/25/4971/LBC Awaiting decision
The Red House Red House Lane Leiston Suffolk IP16 4LR
Listed Building Consent - Conversion of Red House Farmhouse and two barns to 5no. dwellings, associated access and gardens. Minor alterations proposed to the floor plans and elevations of the Listed Building, and retention of works already undertaken
-
DC/25/4970/FUL Awaiting decision
The Red House Red House Lane Leiston Suffolk IP16 4LR
Conversion of Red House Farmhouse and two barns to 5no. dwellings, associated access and gardens. Minor alterations proposed to the floor plans and elevations of the Listed Building, and retention of works already undertaken
-
DC/25/4965/ARM Awaiting decision
1 Benhall Green Benhall Saxmundham Suffolk IP17 1HU
Approval of Reserved Matters of DC/25/2496/OUT - Outline Application (Some Matters Reserved) - The proposal is for a new single storey 2 bedroom dwelling in the rear garden of No. 1 & 2 Benhall Green with new vehicular access from the B1221 - appearance and exact layout of the house
-
DC/25/4935/AME Granted
37 Linden Road Aldeburgh Suffolk IP15 5JH
Non-material Amendment of DC/25/3956/FUL - Front extension to create new entrance porch. (Existing flat-roofed porch to be demolished). Side extension to create new garage. (Existing detached garage at the rear of the property to be demolished). Rear extension to create new sitting room, kitchen/diner, and utility room - Change of originally proposed red facing brickwork to grey facing brickwork. Provision of 1200mm wide x 450mm deep high-level window in south facing wall of rear elevation.
-
DC/25/4952/FUL Granted
14 Linden Road Aldeburgh Suffolk IP15 5JQ
Single storey front extension to form new shower and enlarged front hall
-
DC/25/4945/FUL Granted
Iken View 4 The Cygnets Saxmundham Road Aldeburgh Suffolk IP15 5PD
Garden studio for use as a gym
-
DC/25/4936/FUL Granted
Cockrells School Road Knodishall Saxmundham Suffolk IP17 1UD
Single-storey side extension, together with internal alterations, to create enlarged kitchen
-
DC/25/4949/DRC Granted
The Ogilvie Pavilion Sports Ground Thorpe Road Aldringham Cum Thorpe Leiston Suffolk IP16 4FD
Discharge of Condition No.8 of DC/24/0090/FUL - The construction of a new build community hall with associated parking, hard and soft landscaping - details of a tree and/or hedge planting and landscaping scheme
-
DC/25/4902/TPO Awaiting decision
Priors Hill 48 Park Road Aldeburgh Suffolk IP15 5ET
ESCC/71/00099 - A1 1no. Quercus Ilex (T1 on submitted plan) - Reduce whole crown by approx. 3m, raise crown to approx. 3m from ground level 2no. Pinus Nigra (T2 & T3 on submitted plan) - Target prune heavy over extended limbs by approx. 1-2m 1no. Aesculus Hippocastanum (T4 on submitted plan) - Fell 1no. Prunus Domestica (T5 on submitted plan) - Reduce west side by approx. 2m
-
DC/25/4903/TCA Granted
Priors Hurst Priors Hill Road Aldeburgh Suffolk IP15 5EP
1no. Pinus nigra (T1 on plan) - Fell
-
DC/25/4885/CLE Withdrawn
Caravan Park At Croft Farm Hulver Lane Snape Suffolk
Certificate of Lawfulness - Existing - The property has been in use as a campsite through the caravan club for 5 pitches for over 25 years. I am seeking to regularise this use so I can gain a licence to continue the use independently of the club.
-
DC/25/4893/DRC Granted
Land And Buildings At Croft Farm Hulver Lane Snape Suffolk IP17 1QU
Discharge of Condtion Nos. 4 and 6 of DC/21/3254/FUL - Change of use for agricultural land and part of an existing agricultural building to a touring caravan site for up to 30 caravans and associated facilities including toilets, showers and a guest reception - details of a scheme of landscape works (which term shall include fencing, hedgerows, tree and shrub planting, grass, earthworks, driveway construction, parking areas patios, hard surfaces etc, and other operations as appropriate) and details of the proposed access from the Highway (including the position of any gates to be erected and visibility splays provided)
-
DC/25/4852/CLP Granted
The Crows Nest North End Avenue Thorpeness Aldringham Cum Thorpe Leiston Suffolk IP16 4PD
Certificate of Lawful Use (Proposed) - Siting of a Mobile Home for Additional Single-Storey Living Accommodation
-
DC/25/4831/FUL Granted
149 High Street Aldeburgh Suffolk IP15 5AN
Conversion of attic space to master bedroom with ensuite facility.
-
DC/25/4815/FUL Awaiting decision
41 Foxglove End Leiston Suffolk IP16 4UT
Rear single storey extension to garage and house to create a playroom/breakfast room. Extending 2.2m into garden
-
DC/25/4819/DRR28 Granted
Sizewell C And Associated Development Sites
Sizewell C Deed of Obligation, Noise Mitigation Scheme - Schedule 12 Annex W: Junction South of Bramfield, Refreshed Noise Assessment
-
DC/25/4744/FUL Granted
Brookside Lodge Yoxford Road Middleton Saxmundham Suffolk IP17 3LU
Change of use of land to domestic curtilage
-
DC/25/4744/CLE Awaiting decision
Brookside Lodge Yoxford Road Middleton Saxmundham Suffolk IP17 3LU
Change of use of land to domestic curtilage
-
DC/25/4727/FUL Granted
Leiston Sports Centre Red House Lane Leiston Suffolk IP16 4LS
Domestic water service, bin and battery external compound layouts and acoustic fencing to the rear of the leisure centre. Proposed solar panels to existing roof.
-
DC/25/4713/DRC Granted
Land East Of Abbey Road Leiston Suffolk
Discharge of Condition No. 13 of DC/24/0333/VOC - Variation of Conditions 1, 16, 18, 20, 32, 33, 37, 38, 39, 41, 42 and 44 of DC/20/5181/OUT - Condition 1 (Requirement for submission of reserved matters) Condition 16 (Highways and Drainage) Condition 18 (Highways) Condition 20 (Refuse and Recycling) Condition 32 (Trees) Condition 33 Construction Method Statement) Condition 37 (Ecology - Lighting Strategy) Condition 38 (Ecology - Reptile Mitigation) Condition 39 (Construction Environmental Management Plan) Condition 41 (Landscape Environmental Management Plan) Condition 42 (Ecological Enhancement Strategy) Condition 44 (Timing of Residential Occupation) Conditions(s) Removal: Please see accompanying Planning Statement. - Archaeological Investigation Assessment.
-
DC/25/4721/DRR42 Awaiting decision
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 31 (Rail infrastructure) - Green Rail Route of the Sizewell C Development Consent Order
-
DC/25/4681/FUL Granted
5 Church Road Snape Saxmundham Suffolk IP17 1SZ
Single storey extension to the rear of the dwelling
-
DC/25/4688/AME Granted
Alde Valley High School Seaward Avenue Leiston Suffolk IP16 4BG
Non-material Amendment of DC/23/4556/FUL - Creation of new Artificial Grass Pitch (AGP) and separate Muga pitch, installation of new 4.5m high ball stop fencing and entrance gates to AGP perimeter, installation of a new 2.0m high and 1.2m high pitch perimeter barrier and entrance gates within AGP enclosure, installation of new hard standing areas, installation of new floodlight system to both AGP and Muga pitches, installation of new maintenance equipment store located within AGP enclosure, installation of new hardstanding walkway between existing leisure centre/SGP grass pitch and Mug pitches - Condition 2 references the incorrect drawing numbers.
-
DC/25/4704/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 12 (2) and 27 (2) (Operational Phase Noise Management Plan) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4701/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 40 (Amendments to Approved Details - Vegetation Clearance) Cable Enabling - Early Substations Stage Works of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4674/CON Granted
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Consultation - Condition Coastal Processes Monitoring and Mitigation Plan monitoring reports - DML condition 14(3)
-
DC/25/4626/FUL Awaiting decision
12 Snape Road Knodishall Saxmundham Suffolk IP17 1UT
Extensions and alterations
-
DC/25/4702/DRR28 Granted
A12 / B1119 Junction At Saxmundham Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Sizewell C Deed of Obligation, Noise Mitigation Scheme - Schedule 12 Annex W: Junction at Saxmundham Refreshed Noise Assessment
-
DC/25/4628/FUL Granted
Heartsease Villa Orchard Road Leiston Suffolk IP16 4DB
Single storey Porch/Boot room on North side of property
-
DC/25/4605/DRC Granted
Former 45 Waterloo Avenue Leiston Suffolk
Discharge of Conditions 3, 4, 5, 6, 7 and 14 of DC/25/2228/FUL - Erection of self build detached, single storey dwelling, new access, new garage and associated work - Construction Management Strategy, Method Statement for amphibians, reptiles and hedgehogs, Construction Environmental Management Plan, Environmental Phase 2 Investigation Report, Remediation Strategy and Lighting Design Strategy for Biodiversity.
-
DC/25/4632/DRC Granted
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Discharge of Condition Nos. 2, 3 and BNG1 of DC/24/4158/FUL - Excavation to create five ponds within a basin and creation of an earth bund in connection with natterjack toad habitat. - Habitat Management and Monitoring Plan (HMMP) and Ecology BNG Gain Plan.
-
DC/25/4606/TCA Granted
16 Park Road Aldeburgh Suffolk IP15 5EX
1no. Silver birch (T1 on plan) - Re-pollard to previous pruning points at approximately 5 metres above ground level
-
DC/25/4592/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22 (Code of Construction Practice) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4600/DRR Awaiting decision
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 21 (1) (Ecological Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4599/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 17(1) (Fencing and other means of enclosure) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4615/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(g) (Materials Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4578/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(e) (Soils Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4619/CCC Awaiting decision
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 22(2)(a) (Surface Water and Drainage Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4580/CON Granted
Cliff Top North End Avenue Thorpeness Suffolk IP16 4PD
Consultation - Notice of Caravan Temporary Site Notification under the Caravan Sites and Control of Development Act 1960
-
DC/25/4569/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 32(1) (Public Rights of Way) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4541/TPO Granted
8 Woodlands Leiston Suffolk IP16 4BT
1no. Oak (T1 on plan) - Crown lift 3 metres from the property 1no. Holly (T2 on plan) - Fell 2no. Maple (T3 and T4 on plan) -Fell 1no. Maple (T5 on plan) - Prune to create a clearance from neighbours property by up to 5 metres
-
DC/25/4516/DRR Awaiting decision
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(c) (Construction Phase Noise and Vibration Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4519/AGO Decided
Land Off Sloe Lane Knodishall Suffolk IP17 1UT
Prior Notification (Agricultural) - The works are required to mitigate the impact of Scottish Power Renewables (SPR) consented construction works through which a parcel of land is effectively severed from the existing access into the field and is therefore at risk of being inaccessible. Due to the construction of SPR's project, the approximately 3.48 hectare parcel of land, triangular in shape, is severed from the wider land-holding and so requires a new, private vehicular access off Sloe Lane to allow continued use of the land for agricultural purposes. The development is solely for the use of the farmer and will provide a suitable alternative access for agricultural vehicles to allow for continuous agricultural working of the unit.
-
DC/25/4528/CON Decided
Post Box At Gromford Lane Snape Saxmundham Suffolk IP17 1SH
Consultation - Royal Mail are proposing to remove the post box at the above address
-
DC/25/4500/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - SCC/0177/25/DoR/EA2 - Discharge of Requirement 16(1) (Access Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4498/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 28(1)(b) (Travel Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4489/FUL Granted
Seahorse Cottage 7 Crabbe Street Aldeburgh Suffolk IP15 5BW
Proposed Dormer & First Floor Sun Deck
-
DC/25/4488/DRR Granted
East Anglia TWO Offshore Wind Farm Suffolk
Discharge of Requirement 18(1)(2) (Contaminated Land Mitigation Scheme) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4478/CCC Granted
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 28(1)(a) (Construction Traffic Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
-
DC/25/4474/CON Granted
East Anglia TWO Offshore Wind Farm Suffolk
Consultation - This document consultation consists of the Horizontal Directional Drilling (HDD) Discharge Documents for you to review. The HDD Discharge Documents contain pre-construction plans covering construction works from Mean High Water Springs (MHWS) to the HDD punchout area only.