Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

Granted East Suffolk DC/26/1956/CCC Consultation by County Council

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

County Council Consultation - SCC/0088/26/DoR - Discharge of requirement 10 project wide: public rights of way implementation plan for coast path in respect of szc co. Sizewell c nuclear power station

As published by the council, reference DC/26/1956/CCC

Application record

Reference
DC/26/1956/CCC
Type
Consultation by County Council
Status
Responded
Decision
Granted As published: No Objections
Received
27 May 2026
Validated
27 May 2026
Decided
9 Jun 2026
Ward
Aldeburgh And Leiston
Parish
Leiston Cum Sizewell
Decision by
Delegated Decision

Site history

Applications at this address on the East Suffolk register

This site has had 20 applications since 2024: 18 approved, 0 refused.

  • Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Discharge of Requirement 9 - Main Development Site: Site Clearance of the Sizewell C Development Consent Order

    Decided 1 Oct 2026 Conditions
  • Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) Main Development Site Roads (MDS BMP 5), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Decided 24 Aug 2026 Conditions
  • DC/26/2417/DRR Awaiting decision

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Development Consent Order Requirement 27 - Main development site: Marsh harrier of the Sizewell C Development Consent Order

    Submitted 3 Jul 2026 Conditions
  • Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) - Ancillary Construction Area (MDS BMP 6 ACA Revision 04), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Decided 23 Jun 2026 Conditions
  • DC/26/1949/CON Granted

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Discharge of Requirement 3 (6) (A) - Project wide: Archaeology and peat, post-excavation assessments in respect of SZC Co. Sizewell C Nuclear Power Station

    Decided 15 Jun 2026 Outline
  • DC/26/0622/CON Granted

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Consultation - Sizewell C pUXO Investigation Spring 2026.

    Decided 13 Mar 2026 Outline
  • DC/25/4632/DRC Granted

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Discharge of Condition Nos. 2, 3 and BNG1 of DC/24/4158/FUL - Excavation to create five ponds within a basin and creation of an earth bund in connection with natterjack toad habitat. - Habitat Management and Monitoring Plan (HMMP) and Ecology BNG Gain Plan.

    Decided 23 Jan 2026 Conditions
  • Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) Main Development Site (MDS) Road Works (MDS BMP 5 Rev 4), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Decided 22 Dec 2025 Conditions
  • Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) Temporary Construction Area (TCA) Works (MDS BMP 7 Rev 4), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Decided 22 Dec 2025 Conditions
  • Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Bespoke Mitigation Plan (Noise and Vibration) Ancillary Construction Area (ACA) Works (MDS BMP 6 Rev 3), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Decided 25 Nov 2025 Conditions

Timeline

Dates from the published record

  1. 27 May 2026

    Received by East Suffolk

  2. 9 Jun 2026

    Decision issued: No Objections

  3. 24 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

East Suffolk granted permission on 9 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    DC/26/1949/CON Submitted 27 May 2026 50 yards away

    Discharge of Requirement 3 (6) (A) - Project wide: Archaeology and peat, post-excavation assessments in respect of SZC Co. Sizewell C Nuclear Power Station

    Granted Outline 2 docs
  • Sizewell C And Associated Development Sites

    DC/25/2591/CCC Submitted 30 Jun 2025 200 yards away

    Consultation - DISCHARGE OF REQUIREMENT 23 MAIN DEVELOPMENT SITE HIGHWAY WORKS NO. 1C (LEISTON DRAIN BRIDLEWAY BRIDGE) IN RESPECT OF SZC Co. SIZEWELL C NUCLEAR POWER STATION

    Granted Outline 2 docs
  • Sizewell C And Associated Development Sites

    DC/25/2580/DRR Submitted 30 Jun 2025 200 yards away

    Discharge of Requirement 5 (Project wide: Surface and Foul Water Drainage) Partial discharge for Southern Park and Ride (Work No. 10) of Sizewell C Development Consent Order

    Granted Conditions 17 docs
  • Sizewell C And Associated Development Sites

    DC/26/1096/DRR42 Submitted 20 Mar 2026 200 yards away

    99% historically approved · decision due ~15 May

    Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order Application Type: discharge of requirement - 42 days (/DRR)

    Awaiting decision Conditions 5 docs
  • Sizewell C And Associated Development Sites

    DC/25/2516/DRR28 Submitted 24 Jun 2025 200 yards away

    Bespoke Mitigation Plan (Noise and Vibration) ACA/LEEIE Works (MDS BMP 6), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order

    Granted Conditions 7 docs
  • Sizewell C And Associated Development Sites

    DC/25/2790/DRR42 Submitted 16 Jul 2025 200 yards away

    Development Consent Order Requirement 30 (Accommodation campus: Buildings and Structures) of the Sizewell C Development Consent Order

    Granted Conditions 16 docs

In East Suffolk

  • DC/26/3004/CCC Granted

    A12 Between Junctions 58 (Seven Hills) And Woods Lane Roundabout Woodbridge Suffolk

    County Council Consultation - Transport improvements to the A12 from Junction 58 (Seven Hills, Ipswich) to Woods Lane Roundabout, Woodbridge including the upgrade from a single carriageway to dual carriageway between A12 / B1438 and the A12 / B1078, Construction of a new pedestrian bridge and other highways and pedestrian improvements.

    Received 25 Aug, published by the council 31 Aug 2026 Outline
  • DC/26/3240/PDN Granted

    Proposed Substation Adjacent Broombank Saxmundham Road Aldeburgh Suffolk

    Installation of a substation within a land plot of 3m x 3m located near Saxmudham Road, Aldeburgh

    Received 15 Sep, published by the council 23 Sep 2026 Outline
  • DC/26/3256/CON Granted

    Bank And Premises Exchange Square Beccles Suffolk NR34 9HH

    Consultation - New Pavement Licence for Pascolo Lounge, Beccles 4 tables and 8 chairs Front of the premises: left-hand side 1.6m x 3.5m, right-hand side 1.6m x 2.5m Monday to Sunday 08:00 to 23:00

    Received 16 Sep, published by the council 23 Sep 2026 Outline
  • DC/26/3255/CON Granted

    YouDrink Bottleshop & Taproom 4 Thoroughfare Halesworth Suffolk IP19 8AH

    Consultation - RENEWAL of pavement licence - 2 tables 4 chairs, Area infront of the premises - 5.2m x 2.5m, Monday to Sunday 09:00 until 23:00

    Received 16 Sep, published by the council 23 Sep 2026 Outline
  • DC/26/3431/CON Awaiting decision

    Black Barn Farm Monewden Road Charsfield Woodbridge Suffolk IP13 7QE

    Consultation - To install electronic communications apparatus/development ancillary to radio equipment housing on behalf of Cornerstone.

    Received 30 Sep, published by the council 4 Oct 2026 Outline