East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

Awaiting decision East Suffolk DC/25/4828/CCC Consultation by County Council

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

As published by the council, reference DC/25/4828/CCC

Application record

Reference
DC/25/4828/CCC
Type
Consultation by County Council
Status
Awaiting decision
Received
12 Dec 2025
Validated
12 Dec 2025
Ward
Woodbridge
Parish
Woodbridge

Site history

Applications at this address on the East Suffolk register

This site has had 13 applications since 2025: 10 approved, 0 refused.

  • DC/25/4827/DRR Awaiting decision

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 12 (1) to (16) (Detailed Design) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Submitted 12 Dec 2025 Conditions
  • DC/25/4828/DRR Awaiting decision

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Submitted 12 Dec 2025 Outline
  • DC/25/4404/DRR Granted

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (2)(k) (Watercourse Crossing Method Statement) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Decided 21 Jan 2026 Conditions
  • DC/25/4398/DRR Granted

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (2)(f) (Air Quality Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Decided 23 Jan 2026 Conditions
  • DC/25/4367/DRR Granted

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (2)(d) (Site Waste Management Plan) Substation Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Decided 21 Jan 2026 Conditions
  • DC/25/4060/DRR Granted

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (Code of Construction Practice) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Decided 18 Dec 2025 Conditions
  • DC/25/4014/DRR Granted

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22(2)(h) (Pollution Prevention and Response Plan) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Decided 12 Dec 2025 Conditions
  • DC/25/4012/DRR Granted

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22(2)(j) (Construction Artificial Light Emissions Management Plan) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Decided 11 Dec 2025 Conditions
  • DC/25/4005/DRR Granted

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 18(1) and (2) (Contaminated Land Mitigation Scheme) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Decided 10 Dec 2025 Conditions
  • DC/25/3848/DRR Granted

    East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    Discharge of Requirement 22 (2)(e) (Soil Management Plan) Onshore Cable Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Decided 4 Dec 2025 Conditions

Timeline

Dates from the published record

  1. 12 Dec 2025

    Received by East Suffolk

  2. 9 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 6 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Suffolk took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided outline applications in a median of 18 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4120/CCC Submitted 24 Oct 2025 50 yards away

    County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm

    Granted Outline 6 docs
  • East Anglia ONE North Offshore Wind Farm Thorpeness Aldringham Cum Thorpe Suffolk

    DC/25/0531/DRR Submitted 10 Feb 2025 50 yards away

    Discharge of Requirement 22 (2) (i) (Stakeholder Communications Plan) of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Conditions 11 docs
  • East Anglia TWO Offshore Wind Farm Suffolk

    DC/25/4121/CCC Submitted 24 Oct 2025 50 yards away

    County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm

    Granted Outline 6 docs
  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4515/DRR Submitted 21 Nov 2025 50 yards away

    Discharge of Requirement 22(2)(c) (Construction Phase Noise and Vibration Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Conditions 6 docs
  • East Anglia ONE North Offshore Wind Farm Suffolk

    DC/25/4823/CCC Submitted 12 Dec 2025 50 yards away

    Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order

    Granted Outline 7 docs
  • East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk

    DC/25/4827/DRR Submitted 12 Dec 2025 50 yards away

    99% historically approved · decision due ~6 Feb

    Discharge of Requirement 12 (1) to (16) (Detailed Design) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order

    Awaiting decision Conditions 10 docs

In East Suffolk

  • DC/26/3004/CCC Granted

    A12 Between Junctions 58 (Seven Hills) And Woods Lane Roundabout Woodbridge Suffolk

    County Council Consultation - Transport improvements to the A12 from Junction 58 (Seven Hills, Ipswich) to Woods Lane Roundabout, Woodbridge including the upgrade from a single carriageway to dual carriageway between A12 / B1438 and the A12 / B1078, Construction of a new pedestrian bridge and other highways and pedestrian improvements.

    Received 25 Aug, published by the council 31 Aug 2026 Outline
  • DC/26/3240/PDN Granted

    Proposed Substation Adjacent Broombank Saxmundham Road Aldeburgh Suffolk

    Installation of a substation within a land plot of 3m x 3m located near Saxmudham Road, Aldeburgh

    Received 15 Sep, published by the council 23 Sep 2026 Outline
  • DC/26/3256/CON Granted

    Bank And Premises Exchange Square Beccles Suffolk NR34 9HH

    Consultation - New Pavement Licence for Pascolo Lounge, Beccles 4 tables and 8 chairs Front of the premises: left-hand side 1.6m x 3.5m, right-hand side 1.6m x 2.5m Monday to Sunday 08:00 to 23:00

    Received 16 Sep, published by the council 23 Sep 2026 Outline
  • DC/26/3255/CON Granted

    YouDrink Bottleshop & Taproom 4 Thoroughfare Halesworth Suffolk IP19 8AH

    Consultation - RENEWAL of pavement licence - 2 tables 4 chairs, Area infront of the premises - 5.2m x 2.5m, Monday to Sunday 09:00 until 23:00

    Received 16 Sep, published by the council 23 Sep 2026 Outline
  • DC/26/3431/CON Awaiting decision

    Black Barn Farm Monewden Road Charsfield Woodbridge Suffolk IP13 7QE

    Consultation - To install electronic communications apparatus/development ancillary to radio equipment housing on behalf of Cornerstone.

    Received 30 Sep, published by the council 4 Oct 2026 Outline