Planning application
East Anglia ONE North Offshore Wind Farm Suffolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Requirement 14(1) (Landscape Management Plan) Onshore Cable Duct Installation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
As published by the council, reference DC/25/4100/DRR
Application record
- Reference
- DC/25/4100/DRR
- Type
- Discharge of Requirements (56 days)
- Status
- Permitted
- Decision
- Granted As published: Application Permitted
- Received
- 22 Oct 2025
- Validated
- 22 Oct 2025
- Decided
- 17 Dec 2025
- Ward
- Woodbridge
- Parish
- Woodbridge
- Decision by
- Delegated Decision
Site history
Applications at this address on the East Suffolk register
This site has had 47 applications since 2025: 42 approved, 0 refused.
-
DC/26/2999/DRR Awaiting decision
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 40 (Amendments to approved details - Amendment to Approved Landscape Masterplan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/26/2306/CON Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Consultation - Pre-construction Monitoring Plan for East Anglia One North
-
DC/26/1958/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 40 (Amendments to approved details - Use of Tower Cranes during the Construction of Kiln Lane Substation) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/26/1172/CON Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Consultation - East Anglia TWO Limited (EATL) and East Anglia ONE North Limited (EAONL) are writing to the MMO to formally respond to a request for further information received on the 9th February 2026 in relation to the EA TWO and EA ONE North HDD Discharge Documents (EA2-LDF-CNS-REP-IBR-000119 and EA1N-LDF-CNS-REP-IBR-000058).
-
DC/25/4823/CCC Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4823/DRR Awaiting decision
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4822/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 12 (1) to (16) (Detailed Design Report) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4821/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 14(1) (Landscape Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4700/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 40 (Amendments to Approved Details - Vegetation Clearance) Cable Enabling Works - Early Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
-
DC/25/4703/DRR Granted
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 12 (2) and 27 (2) (Operational Phase Noise Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Timeline
Dates from the published record
-
22 Oct 2025
Received by East Suffolk
-
17 Dec 2025
Decision issued: Application Permitted
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 17 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
East Anglia ONE North Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia ONE North Offshore Wind Farm
Granted Outline 6 docs -
East Anglia ONE North Offshore Wind Farm Thorpeness Aldringham Cum Thorpe Suffolk
Discharge of Requirement 22 (2) (i) (Stakeholder Communications Plan) of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 11 docs -
East Anglia TWO Offshore Wind Farm Suffolk
County Council Consultation - Discharge of Requirement 33 Emergency Planning Arrangements for the Onshore Substation Stage and Onshore Cable Stage, and Offshore Works Phase in respect of Scottish Power Renewables East Anglia TWO Offshore Wind Farm
Granted Outline 6 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 22(2)(c) (Construction Phase Noise and Vibration Management Plan) Substation Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Conditions 6 docs -
East Anglia ONE North Offshore Wind Farm Suffolk
Discharge of Requirement 41 (1) and (2) (Operational Drainage Management Plan) Substations Stage of East Anglia ONE North Offshore Wind Farm Development Consent Order
Granted Outline 7 docs -
East Anglia Two Offshore Wind Farm Underground Cabling Between Thorpeness And Friston Suffolk
99% historically approved · decision due ~6 Feb
Discharge of Requirement 12 (1) to (16) (Detailed Design) Substations Stage of East Anglia TWO Offshore Wind Farm Development Consent Order
Awaiting decision Conditions 10 docs
Other condition discharge and variation applications
In East Suffolk
-
DC/26/3488/DRC Awaiting decision
183 Normanston Drive Lowestoft Suffolk NR32 2PY
Discharge of Condition Nos. 3 and 7 of DC/24/3846/ARM - Approval of Reserved Matters of DC/24/0716/OUT - Outline Application (Some Matters Reserved) - Subdivision of land to the rear of 183, Normanston drive and the construction of 2 no. detached dwellings with garages. - Appearance, landscaping, layout and scale. - Cycle storgae and Highways surface water.
-
DC/26/2695/DRC Granted
Land At Park Farm Loudham Hall Road Loudham Woodbridge Suffolk IP13 0NW
Discharge of conditions 13 (Construction Environmental Management Plan: Biodiversity) and 17 (Construction Management Plan) of DC/21/5550/FUL (construction of 21MW solar farm with associated infrastructure)
-
DC/26/3028/DRR42 Granted
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Discharge of Requirement 9 - Main Development Site: Site Clearance of the Sizewell C Development Consent Order
-
DC/26/3438/DRC Awaiting decision
4 Hackney Terrace Melton Woodbridge Suffolk IP12 1NN
Discharge of Condition Nos. 3, 11, 12 and 14 of DC/23/4732/FUL - Demolition of existing annexe/extension and erection of a new dwelling - precise details of fences, walls and other means of enclosure, details of the provision of secure, covered, and lit cycle storage, details of the areas to be provided for the storage and presentation of refuse and recycling bins for collection/emptying and details of a hedge planting scheme (which shall include species, size and numbers of plants to be planted)
-
DC/26/2755/DRC Granted
The Gables The Green Grundisburgh Woodbridge Suffolk IP13 6TA
Discharge of Condition No. 4 of DC/26/0532/FUL - Creation of a natural swimming pond - Written Scheme of Investigation