Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

Granted East Suffolk Other Consultation

Proposal

Consultation application - MMO-SZC-21987N - Sizewell C Temporary Marine Bulk Import Facility Construction Method Statement and associated Marine Mammal Mitigation Protocol and Southern North Sea Special Area of Conservation Site Integrity Plan, pursuant to Condition 36 of Deemed Marine Licence DCO/2013/00021

As published by the council, reference DC/25/2464/CON

Timeline

Dates from the published record

  1. 20 Jun 2025

    Received by East Suffolk

  2. 14 Jul 2025

    Decision issued: No Objections

  3. 2 Aug 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • DC/25/2407/DRR Granted

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Development Consent Order Requirement 21 - Main development site: Sizewell Marshes SSSI Method Statements (Partial Discharge, Methodology for SSSI Southern Abutment) of the Sizewell C Development Consent Order

    17 Jun 2025 30m away Conditions
  • DC/26/2639/DRR42 Awaiting decision

    Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk

    Discharge of Requirements (42 days) - Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order

    24 Jul 2026 259m away Conditions
  • DC/26/2447/DRR Awaiting decision

    Sizewell C And Associated Development Sites

    Development Consent Order Requirement 4 - Project wide: Terrestrial ecology monitoring and mitigation plan of the Sizewell C Development Consent Order

    7 Jul 2026 259m away Conditions
  • DC/26/2417/DRR Awaiting decision

    Sizewell C And Associated Development Sites Sizewell Leiston Suffolk

    Development Consent Order Requirement 27 - Main development site: Marsh harrier of the Sizewell C Development Consent Order

    3 Jul 2026 304m away Conditions

In East Suffolk

  • DC/26/2670/CON Awaiting decision

    Joseph Conrad Unit 2 18 - 32 London Road North Lowestoft Suffolk NR32 1BA

    Consultation - Use of the furniture by other persons for the purpose of consuming food or drink supplied from, or in connection with relevant use of, the premises e.g. table and chairs

    28 Jul 2026 Outline
  • DC/26/2669/CON Awaiting decision

    CS 115616 / VMO2 72405 / VF 39653 Junction Of Lowestoft Road And Long Road Carlton Colville Suffolk NR33 8SR

    Consultation - Removal of the existing 20m monopole, 6 no. antennas, 2 no. equipment cabinets, and installation of a new 20m monopole, 9 no. antennas, 2 no. equipment cabinets and ancillary development thereto.

    28 Jul 2026 Outline
  • DC/26/2627/CON Awaiting decision

    50 The Walk Felixstowe Suffolk IP11 9DA

    Consultation - install fixed line broadband electronic communications apparatus

    23 Jul 2026 Outline
  • DC/26/2623/EIA Awaiting decision

    Land North Of Kettleburgh Road Easton And Land South Of The Street Letheringham Suffolk

    EIA Screening - For the installation and operation of a solar development and battery energy storage system with associated equipment and necessary infrastructure.

    23 Jul 2026 Outline
  • DC/26/2590/CON Awaiting decision

    Proposed Substation Site At Raydon Hall Farm Raydon Lane Orford Woodbridge Suffolk IP12 2BT

    Consultation - Eastern Power Networks plc is proposing to establish an electricity substation at the above location

    21 Jul 2026 Outline