Planning application
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Condition Nos. 13, 14 & 23 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Environmental Management Plan (Biodiversity) / Landscape and Ecological Management Plan / Surface Water Details
As published by the council, reference DC/25/1408/DRC
Application record
- Reference
- DC/25/1408/DRC
- Type
- Approval of Details Reserved by Cond.
- Status
- Awaiting decision
- Received
- 1 Apr 2025
- Validated
- 1 Apr 2025
- Ward
- Orwell And Villages
- Parish
- Bucklesham
Site history
Applications at this address on the East Suffolk register
This site has had 6 applications since 2025: 4 approved, 0 refused.
-
DC/26/3192/AME Awaiting decision
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Non Material Amendment of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure. - Amendment to design of approved access into the site.
-
DC/26/2293/DRC Granted
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of Condition No. 12 of DC/24/4139/FUL - Engineering operations including the laying of underground electricity cables and associated infrastructure to connect the consented solar farm at Land East of Bucklesham Village and the A1093 (permission: DC/22/4401/FUL East Suffolk Council]) to the connection point, a 33kv overhead line located at the south of Bucklesham Hall Farm. - Archaeological Evaluation
-
DC/26/1944/DRC Granted
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of condition No. 9 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Management Plan
-
DC/26/1818/DRC Granted
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of Condition No. 24 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Surface Water Management Plan
-
DC/26/0856/DRC Granted
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of condition Nos. 17 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Site investigation and post investigation assessment
Timeline
Dates from the published record
-
1 Apr 2025
Received by East Suffolk
-
31 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 50 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
91% historically approved · decision due ~5 Nov
Non Material Amendment of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure. - Amendment to design of approved access into the site.
Awaiting decision Amendments 6 docs -
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of Condition No. 24 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Surface Water Management Plan
Granted Conditions 8 docs -
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of condition No. 9 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Management Plan
Granted Conditions 14 docs -
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of condition Nos. 17 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Site investigation and post investigation assessment
Granted Conditions 6 docs -
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of Condition No. 12 of DC/24/4139/FUL - Engineering operations including the laying of underground electricity cables and associated infrastructure to connect the consented solar farm at Land East of Bucklesham Village and the A1093 (permission: DC/22/4401/FUL East Suffolk Council]) to the connection point, a 33kv overhead line located at the south of Bucklesham Hall Farm. - Archaeological Evaluation
Granted Conditions 6 docs -
Twisted Oaks Bike Park And Trails Brightwell Road Bucklesham Suffolk IP10 0AZ
93% historically approved · decision due ~15 May
Cycle bridge over public footpath.
Awaiting decision Full applications 17 docs
Other condition discharge and variation applications
In East Suffolk
-
DC/26/3488/DRC Awaiting decision
183 Normanston Drive Lowestoft Suffolk NR32 2PY
Discharge of Condition Nos. 3 and 7 of DC/24/3846/ARM - Approval of Reserved Matters of DC/24/0716/OUT - Outline Application (Some Matters Reserved) - Subdivision of land to the rear of 183, Normanston drive and the construction of 2 no. detached dwellings with garages. - Appearance, landscaping, layout and scale. - Cycle storgae and Highways surface water.
-
DC/26/2695/DRC Granted
Land At Park Farm Loudham Hall Road Loudham Woodbridge Suffolk IP13 0NW
Discharge of conditions 13 (Construction Environmental Management Plan: Biodiversity) and 17 (Construction Management Plan) of DC/21/5550/FUL (construction of 21MW solar farm with associated infrastructure)
-
DC/26/3028/DRR42 Granted
Sizewell C And Associated Development Sites Sizewell Leiston Suffolk
Discharge of Requirement 9 - Main Development Site: Site Clearance of the Sizewell C Development Consent Order
-
DC/26/3438/DRC Awaiting decision
4 Hackney Terrace Melton Woodbridge Suffolk IP12 1NN
Discharge of Condition Nos. 3, 11, 12 and 14 of DC/23/4732/FUL - Demolition of existing annexe/extension and erection of a new dwelling - precise details of fences, walls and other means of enclosure, details of the provision of secure, covered, and lit cycle storage, details of the areas to be provided for the storage and presentation of refuse and recycling bins for collection/emptying and details of a hedge planting scheme (which shall include species, size and numbers of plants to be planted)
-
DC/26/2755/DRC Granted
The Gables The Green Grundisburgh Woodbridge Suffolk IP13 6TA
Discharge of Condition No. 4 of DC/26/0532/FUL - Creation of a natural swimming pond - Written Scheme of Investigation