Planning application
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition No. 12 of DC/24/4139/FUL - Engineering operations including the laying of underground electricity cables and associated infrastructure to connect the consented solar farm at Land East of Bucklesham Village and the A1093 (permission: DC/22/4401/FUL East Suffolk Council]) to the connection point, a 33kv overhead line located at the south of Bucklesham Hall Farm. - Archaeological Evaluation
As published by the council, reference DC/26/2293/DRC
Application record
- Reference
- DC/26/2293/DRC
- Type
- Approval of Details Reserved by Cond.
- Status
- Permitted
- Decision
- Application Permitted
- Received
- 23 Jun 2026
- Validated
- 23 Jun 2026
- Decided
- 13 Jul 2026
- Ward
- Orwell And Villages
- Parish
- Bucklesham
- Decision by
- Delegated Decision
Site history
Applications at this address on the East Suffolk register
This site has had 5 applications since 2025: 4 approved, 0 refused.
-
DC/26/1944/DRC Granted
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of condition No. 9 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Management Plan
-
DC/26/1818/DRC Granted
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of Condition No. 24 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Surface Water Management Plan
-
DC/26/0856/DRC Granted
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of condition Nos. 17 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Site investigation and post investigation assessment
-
DC/25/1408/DRC Awaiting decision
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of Condition Nos. 13, 14 & 23 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Environmental Management Plan (Biodiversity) / Landscape and Ecological Management Plan / Surface Water Details
Timeline
Dates from the published record
-
23 Jun 2026
Received by East Suffolk
-
13 Jul 2026
Decision issued: Application Permitted
-
24 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 13 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of condition Nos. 17 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Site investigation and post investigation assessment
Granted Conditions 6 docs -
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of Condition No. 24 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Surface Water Management Plan
Granted Conditions 8 docs -
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
99% historically approved · decision due ~27 May
Discharge of Condition Nos. 13, 14 & 23 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Environmental Management Plan (Biodiversity) / Landscape and Ecological Management Plan / Surface Water Details
Awaiting decision Conditions 17 docs -
Land East Of Bucklesham Village And The A1093 Bucklesham Hall Drive Bucklesham Suffolk
Discharge of condition No. 9 of DC/22/4401/FUL - Installation and operation of a Solar Farm together with all associated works, equipment and necessary infrastructure - Construction Management Plan
Granted Conditions 14 docs -
Meadow View Cottage Bucklesham Hall Drive Bucklesham Ipswich Suffolk IP10 0AY
93% historically approved · decision due ~9 Sep
Certificate of Lawful Use (Existing) - Certificate of Lawful Development for the continued use of the Garden Office / Gym completed in 2018 as confirmed by Building Control Completion Certificate dated 13th July 2018 reference 2017/01269/BN as ancillary accommodation to the existing property.
Awaiting decision Lawful development 12 docs
Other condition discharge and variation applications
In East Suffolk
-
DC/26/1893/DRC Granted
The Workshop Brick Kiln Lane Melton Woodbridge Suffolk IP12 2PB
Discharge of conditions 7 and 10 of DC/23/2365/FUL - Demolition of existing workshop buildings, erection of replacement workshop, authorisation of existing workshop extensions, associated works. - Condition 7 - Construction Management Plan; Condition 10 - Noise Management Plan
-
DC/26/2573/DRC Granted
North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY
Discharge of condition Nos. 14, 19 & 26 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south. - 14 - Construction Mngt Plan, 19 - Construction and Phasing Plan and 26 - Surface Water
-
DC/26/2736/DRC Granted
Land Adj School Road Church Road Ringsfield Suffolk
Discharge of Condition No. 10 of DC/25/3030/VOC - Variation of Condition No. 2 of DC/17/2934/VOC - Construction of 10 No.Holiday Lodges, 1 No. retail unit and 1 No. self contained flat. This application is seeking modification to the appearance and layout of the originally approved lodges - discharge of surface water
-
DC/26/3165/DRC Awaiting decision
Timber Mill Barns Sizewell Hall Road Leiston Suffolk IP16 4TT
Discharge of Condition Nos. 18, 21 and 23 of DC/25/1355/FUL - Alterations to the existing structure & external envelope as part of the formation of two residential dwellings from agricultural barn - 18. Construction Method Statement 21. Emergency Demolition/Construction Manangement Plan 23. Radiation Emergency Contingency Plan.
-
DC/26/3167/DRC Awaiting decision
St Michaels Church Church Street Framlingham Suffolk IP13 9BQ
Discharge of Condition No. 3 of DC/26/1993/FUL - Rebuilding of a brick bounday wall - Archaeological Monitoring