Skip to content
PlanIndex Get alerts
Menu

Planning application

Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

Awaiting decision East Hertfordshire 3/25/2006/LBC Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Landscape and greenspace enhancements within the Hertford Castle grounds, including path resurfacing, planting and habitat improvements, accessibility upgrades, wayfinding, riverbank works, and associated works to the Icehouse, motte, and curtain wall

As published by the council, reference 3/25/2006/LBC

Application record

Reference
3/25/2006/LBC
Type
Listed Building Consent
Status
Awaiting decision
Received
22 Dec 2025
Validated
27 Jan 2026
Ward
Hertford Castle
Parish
Hertford Town Council
Decision by
.
Postcode
SG14 1HR

Site history

Applications at this address on the East Hertfordshire register

This site has had 6 applications since 2021: 1 approved, 0 refused.

  • 3/26/0818/LBC Awaiting decision

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    New cast iron handrail to external basement staircase

    Submitted 9 Jun 2026 Heritage and listed buildings
  • 3/26/0817/LBC Awaiting decision

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    Installation of new fire door in basement

    Submitted 9 Jun 2026 Heritage and listed buildings
  • 3/26/0816/LBC Awaiting decision

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    One replacement cast iron handrail and one new cast iron handrail to front entrance porch

    Submitted 9 Jun 2026 Heritage and listed buildings
  • 3/25/2005/FUL Awaiting decision

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    Landscape and greenspace enhancements within the Hertford Castle grounds, including path resurfacing, planting and habitat improvements, accessibility upgrades, wayfinding, riverbank works, and associated works to the Icehouse, motte, and curtain wall

    Submitted 22 Dec 2025 Full applications
  • 3/21/0409/LBC Granted

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    Installation of internal stud walls, partition and new doorway, to create separate gents toilet with 2 urinals; new corridor with associated changes to plumbing and electrics.

    Decided 28 Jun 2021 Heritage and listed buildings

Timeline

Dates from the published record

  1. 22 Dec 2025

    Received by East Hertfordshire

  2. 27 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 24 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Hertfordshire took a median of 83 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 3/25/2005/FUL (Awaiting decision)

Who's behind it

Company information only, from the register and Companies House

Land Use Consultants Ltd Agent, registered in London

Active · incorporated 1990 · London

8 applications on PlanIndex · across 5 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Hertford Town Council Applicant

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

81 documents on file for this application

  • STEPHEN MILLBURN-22/2/26 Neighbour Correspondence · 23 Feb 2026
  • STEPHEN AND JULIE MILIBURN - 20/2/26 Neighbour Correspondence · 20 Feb 2026
  • HERTFORD TOWN COUNCIL - 13/2/26 Correspondence In - Town/Parish · 13 Feb 2026
  • LOVE BENGEO COMMUNITY GROUP - 12/2/26 Consultee Correspondence · 12 Feb 2026
  • HISTORIC ENVIRONMENT 12/2/26 Consultee Correspondence · 12 Feb 2026
  • FLOOD RISK ASSESSMENT Supporting Documents · 11 Feb 2026
  • HERITAGE STATEMENT Supporting Documents · 11 Feb 2026
  • LOVE BENGEO COMMUNITY GROUP - 9/2/26 Neighbour Correspondence · 09 Feb 2026
  • PROPOSED LAYOUT Plans · 27 Jan 2026
  • SHELTER EXISTING Plans · 22 Jan 2026
  • SUSTAINIBILITY STATEMENT Supporting Documents · 22 Jan 2026
  • -RED LINE BOUNDARY PLAN Supporting Documents · 22 Jan 2026
  • LOCATION PLAN Plans · 22 Jan 2026
  • OWNERSHIP PLAN Plans · 22 Jan 2026
  • EXISTING SITE PLAN Plans · 22 Jan 2026
  • LANDSCAPE GENERAL ARRANGEMENT - SITE WIDE Plans · 22 Jan 2026
  • LANDSCAPE GENERAL ARRANGEMENTS (1 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE GENERAL ARRANGEMENTS (2 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE GENERAL ARRANGEMENTS (3 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE GENERAL ARRANGEMENTS (4 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE SECTION ELEVATION - ASHLEY WEBB SHELTER Plans · 22 Jan 2026
  • LANDSCAPE SECTION ELEVATION - HERTFORD CASTLE CAR PARK (2 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE SECTION ELEVATION - THE RUINS PLAY AREA (3 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE SECTION ELEVATION - ST ANDREWS BRIDGE AND VIEWPOINT (4 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE SECTION - PLAY AREA & MOTTE Plans · 22 Jan 2026
  • INDICATIVE PROPOSED BRIDGE DETAILS Plans · 22 Jan 2026
  • ILLUSTRATIVE EXISTING SITE PLAN Plans · 22 Jan 2026
  • LANDSCAPE ILLUSTRATIVE MASTERPLAN Plans · 22 Jan 2026
  • ACOUSTIC ASSESSMENT Supporting Documents · 22 Jan 2026
  • TRANSPORT STATEMENT Supporting Documents · 22 Jan 2026
  • BASELINE BNG HABITAT MAP Photo · 22 Jan 2026
  • POST-DEVELOPMENT BNG HABITAT MAP Photo · 22 Jan 2026
  • PRE APPLICATION RESPONSE Supporting Documents · 22 Jan 2026
  • BNG ASSESSMENT Supporting Documents · 22 Jan 2026
  • BNG BIODIVERSITY METRIC TOOL Supporting Documents · 22 Jan 2026
  • HERITAGE IMPACT ASSESSMENT APPENDICES Supporting Documents · 22 Jan 2026
  • SURFACE WATER DRAINAGE STRATEG Supporting Documents · 22 Jan 2026
  • TREE SURVEY PLAN Plans · 22 Dec 2025
  • EXISTING LAYOUT AND TREE WORKS PLAN Plans · 22 Dec 2025
  • PROPOSED LAYOUT AND TREE WORKS PLAN Plans · 22 Dec 2025
  • DRAFT TREE PROTECTION PLAN - DEMOLITION AND ENABLING Plans · 22 Dec 2025
  • DRAFT TREE PROTECTION PLAN - CONSTRUCTION & LANDSCAPING Plans · 22 Dec 2025
  • EXISTING AND PROPOSED MECHANICAL AND ELECTRICAL SERVICES Plans · 22 Dec 2025
  • RIVER IMPROVEMENTS OUTLINE DESIGN GENERAL ARRANGEMENT Supporting Documents · 22 Dec 2025
  • RIVER IMPROVEMENTS OUTLINE DESIGN BANK REPROFILING DESIGN Plans · 22 Dec 2025
  • RIVER IMPROVEMENTS OUTLINE FLOW REFLECTOR DESIGN Plans · 22 Dec 2025
  • RIVER IMPROVEMENTS OUTLINE DESIGN BRASH BERM DESIGN Plans · 22 Dec 2025
  • TREE SCHEDULE Supporting Documents · 22 Dec 2025
  • ARBORICULTURAL IMPACT ASSESSMENT Supporting Documents · 22 Dec 2025
  • SCOPE OF REPAIR TO WALL BEHIND THEATRE Supporting Documents · 22 Dec 2025
  • HERTFORD CASTLE CURTAIN WALL CONDITION ASSESSMENT AND PROPOSED SCOPE OF WORKS Supporting Documents · 22 Dec 2025
  • SEQUENCE OF EVENTS Supporting Documents · 22 Dec 2025
  • HERTFORD CASTLE ICE HOUSE CONDITION ASSESSMENT Supporting Documents · 22 Dec 2025
  • INVESTIGATION WORKS TO THE CURTAIN WALL AT HERTFORD CASTLE UNDERTAKEN UNDER CONS Supporting Documents · 22 Dec 2025
  • ECOLOGICAL SURVEY Supporting Documents · 22 Dec 2025
  • BIODIVERSITY STATEMENT Supporting Documents · 22 Dec 2025
  • BIODIVERSITY NET GAIN ASSESSMENT Supporting Documents · 22 Dec 2025
  • BIODIVERSITY QUESTIONNAIRE Supporting Documents · 22 Dec 2025
  • GEOTECHNICAL REPORT Supporting Documents · 22 Dec 2025
  • FIGURES 12 & 13 Plans · 22 Dec 2025
  • ARCHAEOLOGICAL TEST PITTING AND THE MONITORING, RECORDING AND SAMPLING OF GI BOR Supporting Documents · 22 Dec 2025
  • LANDSCAPE AND VISUAL APPRAISAL Supporting Documents · 22 Dec 2025
  • LIGHTING ASSESSMENT Supporting Documents · 22 Dec 2025
  • RIVER IMPROVEMENTS SUMMARY REPORT Supporting Documents · 22 Dec 2025
  • CHAPTER 1 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 2 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 3 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 4 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 5 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 6 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 7 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • PLANTING STRATEGY - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 8 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 9 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 10 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CIL FORM 1 Supporting Documents · 22 Dec 2025
  • GEOTECHNICAL REPORT Supporting Documents · 22 Dec 2025
  • GEOPHYSICAL SURVEY REPORT Supporting Documents · 22 Dec 2025
  • PLANNING STATEMENT Supporting Documents · 22 Dec 2025
  • COVERING LETTER Supporting Documents · 22 Dec 2025
  • HERITAGE IMPACT ASSESSMENT APPENDICES Supporting Documents · 22 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Hertfordshire for determination, against a statutory target of eight weeks. Over the last year East Hertfordshire decided heritage and listed building applications in a median of 110 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/25/2005/FUL Submitted 22 Dec 2025 0m away

    79% historically approved · decision due ~24 Mar

    Landscape and greenspace enhancements within the Hertford Castle grounds, including path resurfacing, planting and habitat improvements, accessibility upgrades, wayfinding, riverbank works, and associated works to the Icehouse, motte, and curtain wall

    Awaiting decision Full applications 115 docs
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/26/0818/LBC Submitted 9 Jun 2026 2m away

    88% historically approved · decision due ~4 Aug

    New cast iron handrail to external basement staircase

    Awaiting decision Heritage and listed buildings 11 docs
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/26/0817/LBC Submitted 9 Jun 2026 2m away

    88% historically approved · decision due ~4 Aug

    Installation of new fire door in basement

    Awaiting decision Heritage and listed buildings 10 docs
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/26/0816/LBC Submitted 9 Jun 2026 2m away

    88% historically approved · decision due ~4 Aug

    One replacement cast iron handrail and one new cast iron handrail to front entrance porch

    Awaiting decision Heritage and listed buildings Extension 10 docs
    Small domestic
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/21/0409/LBC Submitted 16 Feb 2021 12m away

    Installation of internal stud walls, partition and new doorway, to create separate gents toilet with 2 urinals; new corridor with associated changes to plumbing and electrics.

    Granted Heritage and listed buildings 16 docs
  • 38 Castle Street Hertford Hertfordshire SG14 1HH

    X/22/0397/CND Submitted 20 Sep 2022 92m away

    Discharge of condition 3 (archaeology) for planning approval 3/21/2825/HH

    Granted Conditions 5 docs

In East Hertfordshire

  • 3/26/0248/LBC Withdrawn

    1 Stepped Gable Mews High Wych Lane High Wych Hertfordshire CM21 0JL

    Replacement windows and doors

    23 Feb 2026 Heritage and listed buildings
  • 3/26/1243/LBC Awaiting decision

    112 Fore Street Hertford Hertfordshire SG14 1AB

    Listed building consent for external redecoration and removal of the letter signage, internal refurbishment including repainting and redecorating of walls, new door opening and infill of existing door opening and creation of new cubicle in the toilet area, new wood flooring, remove wall tiles and re-plaster walls, conversion of the kitchen into trading area including a full refurbishment, alterations to the bar area, new external doors and replacing the glazing in window, sand back fireplace

    4 Sep 2026 Heritage and listed buildings
  • 3/26/0446/LBC Granted

    Tinkers Hill Farm The Street Furneux Pelham Hertfordshire SG9 0LJ

    Replacement windows (regularisation).

    30 Mar 2026 Heritage and listed buildings
  • 3/26/1228/LBC Awaiting decision

    54 Star Street Ware Hertfordshire SG12 7AQ

    Various works to Listed Building, to include: - New stud walls to section off staircase bulkhead, allowing an extension of backfitting and forming new darts area - Removal on existing bar counter and overbar and replacing with new bar counter at an alternate orientation - New entrance into bar servery with new wicket gate and bar flap - New tongue and groove panelling to Sports Area - New floor finishes internally and externally - Toilet works as approved in application 3/25/0830/LBC - Removal of raised area and summer house as approved in application 3/25/0829/FUL

    2 Sep 2026 Heritage and listed buildings
  • 3/26/0467/LBC Refused

    37A High Street Buntingford Hertfordshire SG9 9AD

    Erection of timber frame outbuilding for use as a staff area (Retrospective)

    1 Apr 2026 Heritage and listed buildings