Skip to content
PlanIndex Get alerts
Menu

Planning application

Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

Awaiting decision East Hertfordshire 3/25/2005/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Landscape and greenspace enhancements within the Hertford Castle grounds, including path resurfacing, planting and habitat improvements, accessibility upgrades, wayfinding, riverbank works, and associated works to the Icehouse, motte, and curtain wall

As published by the council, reference 3/25/2005/FUL

Application record

Reference
3/25/2005/FUL
Type
Full Application
Status
Awaiting decision
Received
22 Dec 2025
Validated
27 Jan 2026
Ward
Hertford Castle
Parish
Hertford Town Council
Decision by
.
Postcode
SG14 1HR

Site history

Applications at this address on the East Hertfordshire register

This site has had 7 applications since 2021: 2 approved, 0 refused.

  • 3/26/1343/LBC Awaiting decision

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    Listed building consent for installation of retro fitted automated door and push to open system

    Submitted 22 Sep 2026 Heritage and listed buildings
  • 3/26/0818/LBC Granted

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    New cast iron handrail to external basement staircase

    Decided 18 Aug 2026 Heritage and listed buildings
  • 3/26/0817/LBC Awaiting decision

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    Installation of new fire door in basement

    Submitted 9 Jun 2026 Heritage and listed buildings
  • 3/26/0816/LBC Awaiting decision

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    One replacement cast iron handrail and one new cast iron handrail to front entrance porch

    Submitted 9 Jun 2026 Heritage and listed buildings
  • 3/25/2006/LBC Awaiting decision

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    Landscape and greenspace enhancements within the Hertford Castle grounds, including path resurfacing, planting and habitat improvements, accessibility upgrades, wayfinding, riverbank works, and associated works to the Icehouse, motte, and curtain wall

    Submitted 22 Dec 2025 Heritage and listed buildings
  • 3/21/0409/LBC Granted

    Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    Installation of internal stud walls, partition and new doorway, to create separate gents toilet with 2 urinals; new corridor with associated changes to plumbing and electrics.

    Decided 28 Jun 2021 Heritage and listed buildings

Timeline

Dates from the published record

  1. 22 Dec 2025

    Received by East Hertfordshire

  2. 27 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 24 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Hertfordshire took a median of 77 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 3/25/2006/LBC (Awaiting decision)

Documents

Plans, drawings, consultee responses and the officer's report

115 documents on file for this application

  • ENVIRONMENT AGENCY - 10/9/26 Consultee Correspondence · 10 Sep 2026
  • LOCAL FLOOD LEAD - 7/9/26 Consultee Correspondence · 07 Sep 2026
  • NOISE AND LIGHT -21/8/26 Correspondence in - Internal Consultation · 21 Aug 2026
  • ACOUSTIC ASSESSMENT - AUG 2026 Supporting Documents · 11 Aug 2026
  • LANDSCAPE SECTION ELEVATION - ASHLEY WEBB SHELTER Other Drawing · 11 Aug 2026
  • LANDSCAPE GENERAL ARRANGEMENT (3 OF 4) Other Drawing · 11 Aug 2026
  • LANDSCAPE GENERAL ARRANGEMENT SITE WIDE Other Drawing · 11 Aug 2026
  • ECOLOGY - 24/7/26 Consultee Correspondence · 24 Jul 2026
  • CONSERVATION TEAM 14/7/26 Correspondence in - Internal Consultation · 14 Jul 2026
  • ENVIRONMENT AGENCY 13/7/26 Consultee Correspondence · 13 Jul 2026
  • RESPONSE TO EA (SWDS) 19.06.2026 Supporting Documents · 22 Jun 2026
  • SURFACE WATER DRAINAGE STRATEGY Supporting Documents · 22 Jun 2026
  • RESPONSE TO EA (BRIDGE & SLUICES) 19.06.2026 Supporting Documents · 22 Jun 2026
  • LANDSCAPE SECTIONS - PROPOSED BRIDGE DETAILS - INDICATIVE Other Drawing · 22 Jun 2026
  • SLUICES OPERATING RULES - TECHNICAL APPRAISAL Supporting Documents · 22 Jun 2026
  • RESPONSE TO CONSERVATION TEAM 22.06.2026 Supporting Documents · 22 Jun 2026
  • LANDSCAPE GENERAL ARRANGEMENT (1 OF 4) Other Drawing · 22 Jun 2026
  • LANDSCAPE GENERAL ARRANGEMENT (2 OF 4) Other Drawing · 22 Jun 2026
  • LANDSCAPE GENERAL ARRANGEMENT (4 OF 4) Other Drawing · 22 Jun 2026
  • ENVIRONMENT AGENCY 29/5/26 Consultee Correspondence · 29 May 2026
  • HISTORIC ENGLAND - 26/5/26 Consultee Correspondence · 26 May 2026
  • CONSERVATION TEAM 19/5/26 Correspondence in - Internal Consultation · 19 May 2026
  • HIGHWAYS - 30/4/26 Consultee Correspondence · 30 Apr 2026
  • ENVIRONMENTAL AGENCY - 30/4/26 Consultee Correspondence · 30 Apr 2026
  • BRIDGES PLAN Other Drawing · 30 Apr 2026
  • EMAIL FROM AGENT 29.04.2026 Other Drawing · 30 Apr 2026
  • HYDRAULIC MODELLING TECHNICAL NOTE Other Drawing · 30 Apr 2026
  • PLANNING STATEMENT Supporting Documents · 29 Apr 2026
  • HERTFORD CASTLE GREENSPACE RENEWAL - OBJECTION COMMENTS RESPONSES Supporting Documents · 29 Apr 2026
  • LOCAL FLOOD LEAD Consultee Correspondence · 09 Apr 2026
  • NOISE AND LIGHT - 5/3/26 Correspondence in - Internal Consultation · 05 Mar 2026
  • CONSERVATION TEAM 26/2/26 Correspondence in - Internal Consultation · 26 Feb 2026
  • GORDON GRAY - 25/2/26 Neighbour Correspondence · 25 Feb 2026
  • S106 - 25/2/26 Correspondence - S106 · 25 Feb 2026
  • HISTORIC ENGLAND - 24/2/26 Consultee Correspondence · 24 Feb 2026
  • LANDSCAPE - 24/2/26 Correspondence in - Internal Consultation · 24 Feb 2026
  • STEPHEN MILLBURN-22/2/26 Neighbour Correspondence · 23 Feb 2026
  • STEPHEN AND JULIE MILIBURN - 20/2/26 Neighbour Correspondence · 20 Feb 2026
  • HERTFORD TOWN COUNCIL - 13/2/26 Correspondence In - Town/Parish · 13 Feb 2026
  • HISTORIC ENVIRONMENT 12/2/26 Consultee Correspondence · 12 Feb 2026
  • FLOOD RISK ASSESSMENT Supporting Documents · 11 Feb 2026
  • HERITAGE STATEMENT Supporting Documents · 11 Feb 2026
  • HCC GROWTH - 28/1/26 Consultee Correspondence · 28 Jan 2026
  • PROPOSED LAYOUT Plans · 27 Jan 2026
  • EXISTING SHELTER Plans · 22 Jan 2026
  • SUSTAINABILITY STATEMENT Supporting Documents · 22 Jan 2026
  • RED LINE BOUNDARY PLAN Plans · 22 Jan 2026
  • SITE LOCATION PLAN Plans · 22 Jan 2026
  • OWNERSHIP PLAN Plans · 22 Jan 2026
  • EXISTING SITE PLAN Plans · 22 Jan 2026
  • LANDSCAPE SECTION ELEVATION - HERTFORD CASTLE CAR PARK (2 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE SECTION ELEVATION - THE RUINS PLAY AREA (3 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE SECTION ELEVATION - ST ANDREWS BRIDGE AND VIEWPOINT (4 OF 4) Plans · 22 Jan 2026
  • LANDSCAPE SECTION - PLAY AREA & MOTTE Plans · 22 Jan 2026
  • INDICATIVE PROPOSED BRIDGE DETAILS Plans · 22 Jan 2026
  • ILLUSTRATIVE EXISTING SITE PLAN Plans · 22 Jan 2026
  • LANDSCAPE ILLUSTRATIVE MASTERPLAN Plans · 22 Jan 2026
  • TRANSPORT ASSESSMENT Supporting Documents · 22 Jan 2026
  • BASELINE BNG HABITAT MAP Photo · 22 Jan 2026
  • POST-DEVELOPMENT BNG HABITAT MAP Photo · 22 Jan 2026
  • SURFACE WATER DRAINAGE STRATEGY Supporting Documents · 22 Jan 2026
  • HERITAGE IMPACT ASSESSMENT APPENDICES Supporting Documents · 22 Jan 2026
  • LPA PRE-APP RESPONSE Supporting Documents · 22 Jan 2026
  • BNG ASSESSMENT Supporting Documents · 22 Jan 2026
  • BNG METRIC TOOL Supporting Documents · 22 Jan 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Supporting Documents · 22 Dec 2025
  • TREE SURVEY PLAN Plans · 22 Dec 2025
  • EXISTING LAYOUT AND TREE WORKS PLAN Plans · 22 Dec 2025
  • PROPOSED LAYOUT AND TREE WORKS PLAN Plans · 22 Dec 2025
  • DRAFT TREE PROTECTION PLAN - DEMOLITION & ENABLING Plans · 22 Dec 2025
  • DRAFT TREE PROTECTION PLAN - CONSTRUCTION & LANDSCAPING Plans · 22 Dec 2025
  • WORKS TO THE ICE HOUSE Plans · 22 Dec 2025
  • CURTAIN WALL SECTION 1 INSIDE Supporting Documents · 22 Dec 2025
  • CURTAIN WALL SECTION 1 OUTSIDE Supporting Documents · 22 Dec 2025
  • CURTAIN WALL SECTIONS 2 & 3 Supporting Documents · 22 Dec 2025
  • CURTAIN WALL SECTIONS 4 & 5 Plans · 22 Dec 2025
  • CURTAIN WALL SECTIONS 6-9 Plans · 22 Dec 2025
  • CURTAIN WALL SECTIONS 10-12 Plans · 22 Dec 2025
  • EXISTING AND PROPOSED MECHANICAL AND ELECTRICAL SERVICES Plans · 22 Dec 2025
  • RIVER IMPROVEMENTS OUTLINE DESIGN GENERAL ARRANGEMENT Plans · 22 Dec 2025
  • RIVER IMPROVEMENTS OUTLINE DESIGN BANK REPROFILING DESIGN Plans · 22 Dec 2025
  • RIVER IMPROVEMENTS OUTLINE FLOW REFLECTOR DESIGN Plans · 22 Dec 2025
  • RIVER IMPROVEMENTS OUTLINE DESIGN BRASH BERM DESIGN Plans · 22 Dec 2025
  • TREE SCHEDULE Supporting Documents · 22 Dec 2025
  • ARBORICULTURAL IMPACT ASSESSMENT Supporting Documents · 22 Dec 2025
  • SCOPE OF REPAIR TO WALL BEHIND THEATRE Supporting Documents · 22 Dec 2025
  • HERTFORD CASTLE CURTAIN WALL CONDITION ASSESSMENT AND PROPOSED SCOPE OF WORKS Supporting Documents · 22 Dec 2025
  • SEQUENCE OF EVENTS Supporting Documents · 22 Dec 2025
  • HERTFORD CASTLE ICE HOUSE CONDITION ASSESSMENT Supporting Documents · 22 Dec 2025
  • INVESTIGATION WORKS TO THE CURTAIN WALL AT HERTFORD CASTLE UNDERTAKEN UNDER CONS Supporting Documents · 22 Dec 2025
  • ECOLOGICAL SURVEY Supporting Documents · 22 Dec 2025
  • BIODIVERSITY STATEMENT Supporting Documents · 22 Dec 2025
  • BIODIVERSITY NET GAIN ASSESSMENT Supporting Documents · 22 Dec 2025
  • BIODIVERSITY QUESTIONNAIRE Supporting Documents · 22 Dec 2025
  • GEOTECHNICAL REPORT Supporting Documents · 22 Dec 2025
  • FIGURES 12 & 13 Plans · 22 Dec 2025
  • ARCHAEOLOGICAL TEST PITTING AND THE MONITORING, RECORDING AND SAMPLING OF GI BOR Supporting Documents · 22 Dec 2025
  • LANDSCAPE AND VISUAL APPRAISAL Supporting Documents · 22 Dec 2025
  • LIGHTING ASSESSMENT Supporting Documents · 22 Dec 2025
  • RIVER IMPROVEMENTS SUMMARY REPORT Supporting Documents · 22 Dec 2025
  • CHAPTER 1 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 2 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 3 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 4 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 5 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 6 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 7 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • PLANTING STRATEGY - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 8 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 9 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CHAPTER 10 - DESIGN AND ACCESS STATEMENT Supporting Documents · 22 Dec 2025
  • CIL FORM 1 Supporting Documents · 22 Dec 2025
  • GEOTECHNICAL REPORT Supporting Documents · 22 Dec 2025
  • GEOPHYSICAL SURVEY REPORT Supporting Documents · 22 Dec 2025
  • COVERING LETTER Supporting Documents · 22 Dec 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Hertfordshire for determination, against a statutory target of eight weeks. Over the last year East Hertfordshire decided full applications in a median of 127 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/25/2006/LBC Submitted 22 Dec 2025 50 yards away

    85% historically approved · decision due ~24 Mar

    Landscape and greenspace enhancements within the Hertford Castle grounds, including path resurfacing, planting and habitat improvements, accessibility upgrades, wayfinding, riverbank works, and associated works to the Icehouse, motte, and curtain wall

    Awaiting decision Heritage and listed buildings 81 docs
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/26/1343/LBC Submitted 22 Sep 2026 50 yards away

    85% historically approved · decision due ~8 Dec

    Listed building consent for installation of retro fitted automated door and push to open system

    Awaiting decision Heritage and listed buildings 7 docs
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/26/0818/LBC Submitted 9 Jun 2026 50 yards away

    New cast iron handrail to external basement staircase

    Granted Heritage and listed buildings 11 docs
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/26/0817/LBC Submitted 9 Jun 2026 50 yards away

    85% historically approved · decision due ~4 Aug

    Installation of new fire door in basement

    Awaiting decision Heritage and listed buildings 10 docs
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/26/0816/LBC Submitted 9 Jun 2026 50 yards away

    85% historically approved · decision due ~4 Aug

    One replacement cast iron handrail and one new cast iron handrail to front entrance porch

    Awaiting decision Heritage and listed buildings Extension 10 docs
    Small domestic
  • Hertford Castle The Wash Hertford Hertfordshire SG14 1HR

    3/21/0409/LBC Submitted 16 Feb 2021 50 yards away

    Installation of internal stud walls, partition and new doorway, to create separate gents toilet with 2 urinals; new corridor with associated changes to plumbing and electrics.

    Granted Heritage and listed buildings 16 docs

In East Hertfordshire

  • 3/26/1572/FUL Awaiting decision

    Bury Grange Farm Ardeley Hertfordshire SG2 7AE

    Change of use of existing agricultural barn to use as offices (Class E) including alterations and single storey side extension to the barn (part retrospective)

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 3/26/1546/FUL Awaiting decision

    Drill Hall 17 Amwell End Ware SG12 9HP

    Demolition of garage and partial demolition of boundary wall. Construction of single storey extensions, replacement roof, insertion of roof lights, replacement windows and installation of air-conditioning units

    Received 30 Oct, published by the council 5 Nov 2026 Full applications
  • 3/26/1527/FUL Awaiting decision

    76 London Road Sawbridgeworth Hertfordshire CM21 9JN

    Demolition of existing rear outbuilding and erection of a replacement outbuilding within an existing commercial premises (Class E)

    Received 27 Oct, published by the council 2 Nov 2026 Full applications
  • 3/26/1523/FUL Awaiting decision

    The Riverside Garden Centre Lower Hatfield Road Bayford Hertfordshire SG13 8XX

    Change of use of former restaurant area (sui generis), to a veterinary surgery (Class E(e)), including internal alterations

    Received 27 Oct, published by the council 5 Nov 2026 Full applications
  • 3/26/1496/FUL Awaiting decision

    Ware Youth Football Club Fanhams Hall Road Ware Hertfordshire SG12 7NN

    Creation of a 3G Artificial Grass Pitch (AGP) with perimeter fencing, hardstanding areas, storage container, sports lighting, and an access footpath with associated access footpath and timber railing

    Received 22 Oct, published by the council 29 Oct 2026 Full applications