Skip to content
PlanIndex Get alerts
Menu

Planning application

Land East Of Devils Lane, Liphook, GU30 7DB

Decided East Hampshire EHDC-25-1227-FUL Full Planning Application

Works: New dwelling Several homes

Read from the description, not a valuation. How we read the register

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Residential development for 4 dwellings including service road and associated works.

As published by the council, reference EHDC-25-1227-FUL

Application record

Reference
EHDC-25-1227-FUL
Type
Full Planning Application
Decision
09-12-2025
Received
21 Oct 2025
Ward
Bramshott & Liphook
Parish
Bramshott and Liphook CP
Postcode
GU30 7DB

Timeline

Dates from the published record

  1. 21 Oct 2025

    Received by East Hampshire

  2. 25 Jul 2026

    Added to PlanIndex

After the decision

East Hampshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 127 Haslemere Road, Liphook, Hampshire, GU30 7BX

    EHDC-25-1478-HSE Submitted 18 Dec 2025 175m away

    New vehicular access

    Decided Householder
    Domestic
  • 143 Haslemere Road, Liphook, Hampshire, GU30 7BX

    60501 Submitted 30 Aug 2024 175m away

    Decision due ~25 Oct

    Two storey front, single storey side, and part single part two storey rear extensions following demolition of rear conservatory

    Status unknown Householder Extension Demolition
    Small domestic
  • 11 Wey Lodge Close, Liphook, Hampshire, GU30 7DE

    EHDC-25-0351-TPO Submitted 17 Mar 2025 332m away

    T1 - Oak - Reduce radial crown spread to the south to no less than 8 m to clear dwelling. Reduce easterly spread from 12 m to no less than 9 m. Reduce westerly spread to no less than 8 m to balance. Reduce the branch growing to the northwest back to points. Remove all poorly attached dead wood. Reduce height from 27 m to no less than 20 m.

    Decided Trees
    Domestic
  • 31 Locke Road, Liphook, Hampshire, GU30 7DQ

    EHDC-26-0309-HSE Submitted 26 Mar 2026 371m away

    Proposed Second storey side extension.

    Decided Householder Extension
    Domestic
  • 67 Manor Fields, Liphook, Hampshire, GU30 7BT

    EHDC-25-1429-HSE Submitted 3 Dec 2025 426m away

    Alterations including change of existing garage to a study, minor elevational alterations, internal alterations and a additional on-plot parking space

    Decided Householder
    Domestic

In East Hampshire

  • Caravan, GREENDRIFT Homestead Road, Medstead, Alton, Hampshire, GU34 5PW

    Part retrospect application for the demolition of existing dwelling and replacement with a mobile home relocated to the front of the site, with 3 gypsy mobile homes and day rooms to the rear of the site. The laying of hardstanding to provide, car parking and turning spaces. New access gates, pillars and walling.

    13 May 2026 Full applications
  • BROCK HOLLOW Churt Road, Headley, Bordon, Farnham, Hampshire, GU10 2QT

    Installation of 70 Solar PV panels on the Agricultural curtilage part of the property. Total site area = 10 030 m2 Residentual Curtilage = 2335 m2 Agricultural curtilage = 7695 m2

    8 May 2026 Full applications
  • BORDON CAMP AND TRAINING GROUND Budds Lane, Bordon, Hampshire, GU35 0JE

    The erection of a heat hub building and associated plant and enclosures/front yard area

    7 May 2026 Full applications
  • Barclays Bank Plc High Street, Alton, Hampshire, GU34 1BD

    Retrospective application for change of use of ground floor to restaurant (Class E) and installation of a Kitchen Extract system.

    17 Apr 2026 Full applications
  • Ross Farm Park Lane, Ropley, Alresford, Hampshire, SO24 0BE

    Retention of existing as a permanent agricultural workers dwelling

    15 Apr 2026 Full applications