Skip to content
PlanIndex Get alerts
Menu

Planning application

EHDC-26-0396-FUL

Ross Farm Park Lane, Ropley, Alresford, Hampshire, SO24 0BE

Decided East Hampshire Full Planning Application

Proposal

Retention of existing as a permanent agricultural workers dwelling

As published by the council, reference EHDC-26-0396-FUL

Timeline

Dates from the published record

  1. 15 Apr 2026

    Received by East Hampshire

  2. 25 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Oak House Park Lane, Ropley, Alresford, Hampshire, SO24 0BE

    Discharge Condition 4 (BNG) of approved application EHDC-25-0443-FUL - Change of use of agricultural land to residential curtilage for use as residential garden including landscaping enhancements, change of use of residential curtilage (garden land) to agricultural land and use of an area of land for the provision of Biodiversity Net Gain.

    25 Jul 2025 0m away Conditions

In East Hampshire

  • Caravan, GREENDRIFT Homestead Road, Medstead, Alton, Hampshire, GU34 5PW

    Part retrospect application for the demolition of existing dwelling and replacement with a mobile home relocated to the front of the site, with 3 gypsy mobile homes and day rooms to the rear of the site. The laying of hardstanding to provide, car parking and turning spaces. New access gates, pillars and walling.

    13 May 2026 Full applications
  • BROCK HOLLOW Churt Road, Headley, Bordon, Farnham, Hampshire, GU10 2QT

    Installation of 70 Solar PV panels on the Agricultural curtilage part of the property. Total site area = 10 030 m2 Residentual Curtilage = 2335 m2 Agricultural curtilage = 7695 m2

    8 May 2026 Full applications
  • BORDON CAMP AND TRAINING GROUND Budds Lane, Bordon, Hampshire, GU35 0JE

    The erection of a heat hub building and associated plant and enclosures/front yard area

    7 May 2026 Full applications
  • Barclays Bank Plc High Street, Alton, Hampshire, GU34 1BD

    Retrospective application for change of use of ground floor to restaurant (Class E) and installation of a Kitchen Extract system.

    17 Apr 2026 Full applications
  • Holt Farm Land At Holt Farm, Bentworth, GU34 5LF

    Installation of a ground-mounted solar photovoltaic array and associated infrastructure, access track, security fencing and landscaping, together with a change of use from arable agriculture to renewable energy generation at Holt Farm in Bentworth.

    15 Apr 2026 Full applications