Planning application
Land Off Seaton Road Seaton Road Colyford
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of agricultural building and hardcore track with turning point
As published by the council, reference 26/1901/FUL
Application record
- Reference
- 26/1901/FUL
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 23 Sep 2026
- Validated
- 23 Sep 2026
- Ward
- Coly Valley
- Parish
- Colyford
Comment by 24 October 2026
The council is taking comments on this application until then. Have your say on East Devon's portal.
Site history
Applications at this address on the East Devon register
This site has had 2 applications since 2026.
-
25/2473/FUL Awaiting decision
Land Off Seaton Road Seaton Road Colyford
Agricultural Building
Timeline
Dates from the published record
-
23 Sep 2026
Received by East Devon
-
30 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Devon took a median of 43 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Off Seaton Road Seaton Road Colyford
93% historically approved · decision due ~6 Mar
Agricultural Building
Awaiting decision Full applications 10 docs -
Wild Flowers Seaton Road Colyford Devon EX24 6QW
79% historically approved · decision due ~1 Sep
Certificate of existing lawfulness to confirm material start to planning permission ref: 23/2240/FUL
Awaiting decision Lawful development 6 docs -
Elmwood Residential Home Swan Hill Road Colyford Devon EX24 6QJ
Variation of condition 3 (materials) of planning permission 22/0757/FUL (Proposed staff accommodation) to permit the windows and doors to be constructed from uPVC instead of wood
Granted Amendments Windows or glazing 3 docs -
Stafford Barton Swan Hill Road Colyford
The refurbishment of the pole mounted transformer on pole no. 25LB11C , including the replacement of the 9.5 metre pole and 3 stay wires. The new pole will be 10 metres and the stays will be replaced like for like.
Decided Other 7 docs -
The Old Rectory Swan Hill Road Colyford Devon EX24 6QJ
T1: Lime - reduce crown overall and reduce road/path overhang by up to approx. 3m branch length reduction, max cuts 50-60mm. dia. Retain and protect mistletoe during arb operations. Remove hung-up deadwood, cut back torn-out or broken stubs to natural target healing points - noted that cut diameters will be larger for some of these latter work tasks. T2-T4: x3 Lime - reduce crown by up to approx. 3m, branch length reductions, but apply only as required to achieve balanced crown pattern. Max cuts 50-60mm. dia. Retain and protect mistletoe during arb. operations. (Amended.)
Granted Trees 6 docs -
The Old Rectory Swan Hill Road Colyford Devon EX24 6QJ
93% historically approved · decision due ~20 May
T5: Cypress - remove to allow lower growth and hedge. T6: Beech - reduce existing crown height by 20%, reshaping and rebalancing crown structure to reduce crown loadings on main, secondary and tertiary stems. Remove dead stubs. Current height 9m, final height 7m. Current width 5-7m, final width 4-6m. T7: Beech - reduce existing crown height by 20%, reshaping and rebalancing crown structure to reduce crown loadings on main, secondary and tertiary stems. Current height 9m, final height 7m. Current width 6-7m, final width 5-6m. Remove dead stubs. T8: Western Red Cedar - crown reduction by 10%, rebalancing lower crown branches to maintain profile. Current width 8m, final width 6.5-7m. . T9: Ash - sectionally fell (replant with broadleaf species). T10: Cypress - reduce existing crown height by 25%, reshaping and rebalancing crown structure to reduce crown loadings on main, secondary and tertiary stems. Current height 13m, final height 9.5-10m. Current width 4-5m, final width 3-4m. T11: Lime - reduce existing crown height by 25%, reshaping and rebalancing crown structure to reduce crown loadings on main, secondary and tertiary stems. Current height 17m, final height 12.5-13m. Current width 5-6m, final width 4-5m. T12: Western Red Cedar - reduce existing crown height by 25%, reshaping and rebalancing crown structure to reduce crown loadings on main, secondary and tertiary stems. Current height 10-11m, final height 12.5-13m. Current width 4-5m, final width 3.5-4m. T13: Yew - reduce existing crown height by 30%, reshaping and rebalancing crown structure to reduce crown loadings. Current height 9m, final height 6.5m. Current width 4m, final width 3m. T14: Western Red Cedar - reduce existing crown height by 25%, reshaping and rebalancing crown structure to reduce crown loadings. Current height 10m, final height 7.5m. Current width 5-6m, final width 3.5-4m.
Awaiting decision Trees 3 docs
Other full applications
In East Devon
-
26/2021/FUL Awaiting decision
19 Stoneborough Lane Budleigh Salterton EX9 6HL
Proposed single storey rear and side extensions
-
26/1999/FUL Awaiting decision
Glendale Clyst St George Exeter EX3 0QJ
Demolition of existing rear single storey extension with replacement single storey extension and formation of new internal driveway
-
26/1111/FUL Refused
Flat 1 11 Marine Place Seaton EX12 2QJ
Replacing non-functioning timber sash windows with same style white uPVC sash windows on western elevation.
-
26/1770/FUL Awaiting decision
Roseleigh Church Road Colaton Raleigh Devon EX10 0LH
Demolition of existing bungalow and construction of replacement two-storey dwelling
-
26/1708/FUL Granted
Southlea Lower Broad Oak Road West Hill Ottery St Mary EX11 1XH
Proposed rear/south extension in place of existing conservatory, new entrance door and canopy, cladding and raised patio to main dwelling; garage extension and roof alterations, including solar installation