Planning application

26/0168/FUL

Beach House Quay Lane Lympstone EX8 5HA

Awaiting decision East Devon Full Application

Proposal

Extension and addition of dormers on rear elevation.

As published by the council, reference 26/0168/FUL

Timeline

Dates from the published record

  1. 30 Jan 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/0445/FUL Granted

    4 Harefield Cottages The Strand Lympstone EX8 5EX

    Proposed raising of rear tenement roof and minor internal alterations

    18 Mar 2026 139m away Full applications
  • 26/0234/FUL Refused

    3 Harefield Cottages The Strand Lympstone EX8 5EX

    Installation of two rear rooflights and a single front-facing rooflight. Alterations to fenestration and replacement chimney stack.

    9 Feb 2026 140m away Full applications
  • 26/0540/VAR Awaiting decision

    Alfayda Underhill Lympstone Exmouth EX8 5HH

    Application Reference Number: 25/1848/FUL Date of Decision: 22/10/2025 Condition Number(s): 2 Conditions(s) Removal: We wish to reduce the size of the development in order to reduce the cost of the works We wish to remove the side extension.

    30 Mar 2026 141m away Amendments
  • 26/1138/NMA Awaiting decision

    7 Highcliffe Close Lympstone Devon EX8 5HF

    Non-material amendment to 23/2334/FUL to add a bike store to the back of the approved garage.

    8 Jun 2026 150m away Amendments
  • 25/2530/DOC Awaiting decision

    Hope Cottage The Strand Lympstone Devon EX8 5JS

    Discharge of Condition for 25/1300/FUL: Conditon 3 (CEMP), Condition 4 (Trees) 4. We are submitting an updated Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP) to reflect the revised bridge design, the full details of the ground protection measures in respect of the temporary access track, and the replacement planting details including species and establishment of trees within the private garden areas of the scheme, and the other site-specific details. We are also submitting an updated Landscape Reinstatement Plan, a Tree Replanting Letter, the Homeowner Notice of Entry Letters and the Candy?s Field Tree Planting Maintenance Plan which have been informally reviewed and accepted by Stuart Baker prior to this application. BNG. We are submitting a BNG Plan, a BNG Metric and a BNG Statement. This should be everything that is needed to enable the start of the works.

    9 Dec 2025 268m away Conditions
  • 25/2535/DBG Awaiting decision

    Hope Cottage The Strand Lympstone Exmouth EX8 5JS

    Discharge of Biodiversity Gain Plan for 25/1300/FUL

    9 Dec 2025 268m away Conditions

In East Devon

  • 26/0768/FUL Granted

    2 Yew Tree Cottage New Road Beer Seaton EX12 3JR

    Replacement of doors and windows and demolition of existing single storey garage

    24 Apr 2026 Full applications
  • 26/1490/FUL Awaiting decision

    7 Broad Street Ottery St Mary EX11 1BS

    Renovation works and new rear external staircase to commercial property

    28 Jul 2026 Full applications
  • 26/1486/FUL Awaiting decision

    Holly Batch Cooks Lane Axminster EX13 5SQ

    New single storey garden room extension to rear elevation.

    27 Jul 2026 Full applications
  • 26/1363/FUL Awaiting decision

    Lower Cobden Whimple Exeter EX5 2PZ

    Full planning permission for the change of use of Barn 5 from agricultural uses to storage and distribution (Use Class B8) (Retrospective)

    23 Jul 2026 Full applications
  • 26/1505/FUL Awaiting decision

    1 Whinfield Terrace Barline Beer EX12 3LN

    Erection of replacement garage/outbuilding

    23 Jul 2026 Full applications