Planning application

Watergate Longbrook Lane Lympstone EX8 5BE

Awaiting decision East Devon 26/0086/DOC Discharge of Condition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of condition for 25/0873/FUL: condition 3 (surface water drainage), condition 5 (cladding)

As published by the council, reference 26/0086/DOC

Application record

Reference
26/0086/DOC
Type
Discharge of Condition
Status
Awaiting decision
Received
28 Jan 2026
Validated
28 Jan 2026
Ward
Woodbury And Lympstone
Parish
Lympstone
Postcode
EX8 5BE

Timeline

Dates from the published record

  1. 28 Jan 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 25 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Hilton Barnfield Architects Agent, an architecture practice registered in Exeter

Active · incorporated 2011 · Exeter

35 applications on PlanIndex · across 2 councils · 77% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided condition discharge and variation applications in a median of 23 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Longbrook Cottage Longbrook Lane Lympstone Devon EX8 5LJ

    26/0851/CPL Submitted 5 May 2026 150 yards away

    Certificate of lawful development for a proposed outbuilding.

    Granted Lawful development 10 docs
  • Longbrook Cottage Longbrook Lane Lympstone Exmouth EX8 5LJ

    26/1763/FUL Submitted 27 Aug 2026 150 yards away

    93% historically approved · decision due ~22 Oct

    Proposed single store rear extension and associated works

    Awaiting decision Full applications Extension 15 docs
  • Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    26/1757/FUL Submitted 3 Sep 2026 150 yards away

    93% historically approved · decision due ~29 Oct

    New porch

    Awaiting decision Full applications Extension 5 docs
    Small domestic
  • 16 Meadow Close Lympstone Exmouth EX8 5LQ

    25/1655/FUL Submitted 12 Aug 2025 200 yards away

    Construction of first floor roof extension and front porch.

    Granted Full applications Extension 11 docs
    Small domestic
  • 3 Bakers Cottages Longmeadow Road Lympstone Devon EX8 5LP

    26/1611/VAR Submitted 11 Aug 2026 250 yards away

    96% historically approved · decision due ~6 Oct

    Variation of Condition Numbers 2 (Approved Plans), 3 (Rooflight) and 4 (Materials) on Planning permission 25/2493/LBC (Removal of existing extension and conservatory and the construction of new single storey extension on rear), for changes to roof pitch, materials and rooflight design.

    Awaiting decision Amendments Extension Loft or dormer 6 docs
    Small domestic
  • 3 Bakers Cottages Longmeadow Road Lympstone EX8 5LP

    26/0888/VAR Submitted 21 May 2026 250 yards away

    Variation of condition numbers 2 (approved plans) and 3 (surface water drainage) of planning permission 26/0097/FUL (Removal of existing extension and conservatory and the construction of new single storey extension on rear on the same footprint/ foundation). Proposal for revised drainage strategy.

    Granted Amendments Extension 12 docs
    Small domestic

In East Devon

  • 26/1853/DOC Granted

    Chelmer Woodhouse Hill Uplyme Lyme Regis DT7 3SL

    Discharge of condition for 25/1842/FUL: Condition 5 (Surface Water Drainage)

    Received 14 Sep, published by the council 17 Sep 2026 Conditions
  • 26/1850/DOC Awaiting decision

    6 Potters Close West Hill Devon EX11 1YE

    Discharge of condition for 25/1832/FUL: Condition 4 (Trees)

    Received 14 Sep, published by the council 17 Sep 2026 Conditions
  • 26/1833/DOC Awaiting decision

    2 Lower Wheathill Sidmouth Devon EX10 9UA

    Discharge of condition for 25/2420/FUL: Condition 4 (Tree Protection) and Condition 7 (Materials)

    Received 10 Sep, published by the council 17 Sep 2026 Conditions
  • 26/1845/DOC Awaiting decision

    Spout Hill Kilmington Axminster EX13 7RW

    Discharge of Condition for 26/1175/LBC: Condition 4a (brick, bedding and pointing mortar details) Bedding Bedding mortar is to be mixed using a well graded washed grit sand (5mm down to 0.075mm) and St Astier NHL 5 at a ratio of 1:2 ? of binder to aggregate by volume. Pointing The pointing mortar is to use a well graded washed aggregate (the largest particle size should not exceed one-third of the joint width) mixed with St Astier NHL5 at a ratio of 1:2 ? of binder to aggregate by volume. Bricks for Chimney Rebuild Reclaimed semi-engineering red brindle brick laid in stretcher bond.

    Received 10 Sep, published by the council 17 Sep 2026 Conditions
  • 26/1841/DOC Awaiting decision

    Musbury Garage, Spar Marlborough Road Musbury Devon EX13 8AX

    Discharge of condition for 25/1343/FUL: Condition 3 (CMP), Condition 4 (Materials), Condition 7 (Lighting).

    Received 10 Sep, published by the council 17 Sep 2026 Conditions