Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Bakers Cottages Longmeadow Road Lympstone Devon EX8 5LP

Awaiting decision East Devon 26/1611/VAR Variation of Condition

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of Condition Numbers 2 (Approved Plans), 3 (Rooflight) and 4 (Materials) on Planning permission 25/2493/LBC (Removal of existing extension and conservatory and the construction of new single storey extension on rear), for changes to roof pitch, materials and rooflight design.

As published by the council, reference 26/1611/VAR

Application record

Reference
26/1611/VAR
Type
Variation of Condition
Status
Awaiting decision
Received
11 Aug 2026
Validated
11 Aug 2026
Ward
Woodbury And Lympstone
Parish
Lympstone
Postcode
EX8 5LP

Comment by 18 September 2026

The council is taking comments on this application until then. Have your say on East Devon's portal.

Timeline

Dates from the published record

  1. 11 Aug 2026

    Received by East Devon

  2. 23 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in ,Cranbrook, Exeter

7 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

  • 3 Bakers Cottages Longmeadow Road Lympstone EX8 5LP

    26/0888/VAR Submitted 21 May 2026 18m away

    Variation of condition numbers 2 (approved plans) and 3 (surface water drainage) of planning permission 26/0097/FUL (Removal of existing extension and conservatory and the construction of new single storey extension on rear on the same footprint/ foundation). Proposal for revised drainage strategy.

    Granted Amendments Extension 12 docs
    Small domestic
  • 3 Bakers Cottages Longmeadow Road Lympstone Exmouth EX8 5LP

    25/2493/LBC Submitted 16 Dec 2025 18m away

    94% historically approved · decision due ~10 Feb

    Removal of existing extension and conservatory and the construction of new single storey extension on rear

    Awaiting decision Heritage and listed buildings Extension 15 docs
    Small domestic
  • 3 Bakers Cottages Longmeadow Road Lympstone Exmouth EX8 5LP

    26/0097/FUL Submitted 27 Jan 2026 18m away

    Removal of existing extension and conservatory and the construction of new single storey extension on rear on the same footprint/ foundation

    Granted Full applications Extension 19 docs
    Small domestic
  • Garden Of 6 Bakers Cottages Longmeadow Road Lympstone Exmouth EX8 5LP

    25/2246/VAR Submitted 19 Nov 2025 41m away

    96% historically approved · decision due ~14 Jan

    Removal of condition 2 (Removal of Permitted Development rights), of planning permission 98/P0587 (Permission for Retention of Use of Land as Garden), to reinstate permitted development rights available to residential gardens.

    Awaiting decision Amendments 5 docs
  • Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    26/1757/FUL Submitted 3 Sep 2026 53m away

    93% historically approved · decision due ~29 Oct

    New porch

    Awaiting decision Full applications Extension 5 docs
    Small domestic
  • 2 Malt Field Lympstone Exmouth EX8 5ND

    21/0467/FUL Submitted 16 Feb 2021 81m away

    Construction of rear first floor extension and rear canopy.

    Granted Full applications Extension 10 docs

In East Devon

  • 26/1694/NMA Awaiting decision

    Land South Of Windmill Lane West Hill

    Minor amendment for 23/1143/MFUL : Change to porch details from metal to wood - plots 2, 12, 22, 23 and 24.

    20 Aug 2026 Amendments
  • 26/1196/NMA Decided

    Unit 1 Heathpark Way Heathpark Industrial Estate Honiton Devon EX14 1BB

    Minor amendment for 25/0021/FUL : Amendment to parking layout

    15 Jun 2026 Amendments
  • 26/1466/NMA Decided

    Units 2 + 3 Heathpark Way Heathpark Industrial Estate Honiton EX14 1BB

    Minor amendment to 26/0711/VAR : update drawing references

    20 Jul 2026 Amendments
  • 26/1603/NMA Awaiting decision

    Land North Of Old Tithebarn Lane Clyst Honiton

    Non-material Amendment for 24/2399/MRES: Removal of front roof light to Greenwood Housetype in Phases 4 and 5

    7 Aug 2026 Amendments
  • 26/0952/VAR Granted

    Land Adjacent Cloakham Lawn And Chard Road Chard Road Axminster

    Variation of condition 21 of planning permission 23/0685/MOUT (Hybrid application: Outline application for the erection of up to 140 dwellings, 0.8 hectares of Class-E employment land, public open space, drainage and ancillary works (all matters reserved except access). Full application for works to football training pitch including drainage improvement work, 4x 15m tall floodlighting columns and erection of 6m high ballstop netting on west side of football pitch and training ground) to change wording from "...no adverse impacts on the vitality and viability of Axminster town centre...to "...no unacceptable adverse impacts on the vitality and viability of Axminster town centre..."

    14 May 2026 Amendments