Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Link Lane Sutton Cambridgeshire CB6 2NF

Awaiting decision East Cambridgeshire 26/00939/FUL Full Application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Single storey rear extension with 2 no. new rooflights to existing roof

As published by the council, reference 26/00939/FUL

Application record

Reference
26/00939/FUL
Type
Full Application
Status
Pending Consideration
Received
2 Sep 2026
Validated
2 Sep 2026
Ward
Sutton
Parish
Sutton
Postcode
CB6 2NF

Comment by 28 September 2026

The council is taking comments on this application until then. Have your say on East Cambridgeshire's portal.

Timeline

Dates from the published record

  1. 2 Sep 2026

    Received by East Cambridgeshire

  2. 13 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Cambridgeshire took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year East Cambridgeshire decided full applications in a median of 88 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 10 The Southerns Sutton Ely Cambridgeshire CB6 2PQ

    21/00808/CLE Submitted 25 May 2021 146m away

    Conversion of existing garage to a kitchen diner (retrospective)

    Granted Lawful development 8 docs
  • 35 High Street Sutton Ely Cambridgeshire CB6 2RB

    26/00214/DISA Submitted 26 May 2026 171m away

    To discharge Condition 3 (External Materials) of decision 26/00214/FUL dated 30th April 2026 for demolish existing single storey store and part boundary wall, construct replacement single storey store, extend existing drop kerb to provide two off-street parking spaces

    Granted Conditions Demolition 4 docs
    Small domestic
  • 61 High Street Sutton Ely Cambridgeshire CB6 2NL

    24/01138/TRE Submitted 30 Oct 2024 191m away

    T1 Cherry - Fell

    Decided Trees 3 docs
  • 56 High Street Sutton Ely Cambridgeshire CB6 2RA

    24/01237/TRE Submitted 26 Nov 2024 224m away

    T1 Birch - Cut down as allergic to birch and we are planning to plant a Rowan tree instead

    Decided Trees 3 docs
  • 72 High Street Sutton Ely Cambridgeshire CB6 2NL

    21/00838/TPO Submitted 28 Jun 2021 246m away

    T1 Apple - Ongoing cyclical maintenance pruning T2 Apple - Ongoing cyclical maintenance pruning T3 Cherry - Ongoing cyclical maintenance pruning G4 Damson x2 - Ongoing cyclical maintenance pruning T5 Damson - Ongoing cyclical maintenance pruning T6 Fig - Ongoing cyclical maintenance pruning T7 Medlar - Ongoing cyclical maintenance pruning T8 Blue Cedar - Cut back lower branches to clear weeping Silver Birch and 2x branches overhanging pond T9 Hawthorn - Remove two dead lower branches T10 Walnut - Remove two lower branches to increase crown clearance from ground level

    Decided Trees 4 docs
  • 72 High Street Sutton Ely Cambridgeshire CB6 2NL

    21/00838/TRE Submitted 28 Jun 2021 246m away

    T1 Apple - Ongoing cyclical maintenance pruning T2 Apple - Ongoing cyclical maintenance pruning T3 Cherry - Ongoing cyclical maintenance pruning G4 Damson x2 - Ongoing cyclical maintenance pruning T5 Damson - Ongoing cyclical maintenance pruning T6 Fig - Ongoing cyclical maintenance pruning T7 Medlar - Ongoing cyclical maintenance pruning T8 Blue Cedar - Cut back lower branches to clear weeping Silver Birch and 2x branches overhanging pond T9 Hawthorn - Remove two dead lower branches T10 Walnut - Remove two lower branches to increase crown clearance from ground level

    Decided Trees 4 docs

In East Cambridgeshire

  • 26/00765/FUL Granted

    11A Main Street Coveney Ely Cambridgeshire CB6 2DJ

    Single storey side extension

    16 Jul 2026 Full applications
  • 26/00520/FUL Granted

    Site Of The Former Pattersons Stores 11 Mill Street Isleham CB7 5RY

    Hybrid application comprising full planning permission for the erection of a convenience store (Class E) with associated external plant, access, parking and servicing areas, and landscaping; and Outline permission (all matters reserved except access) for two single-storey dwellings (Class C3).

    14 May 2026 Full applications
  • 26/00749/FUL Granted

    Tollgate Cottage 8 Hythe Lane Burwell Cambridgeshire CB25 0EH

    Installation of external Air Source Heat Pump unit to northern elevation

    8 Jul 2026 Full applications
  • 25/00362/FUL Granted

    Old Salt Depot 38 Brinkley Road Dullingham Newmarket Suffolk CB8 9UW

    Erection of 5 no. two-storey dwellings, associated outbuildings and highway access

    23 Dec 2025 Full applications
  • 26/00087/FUL Awaiting decision

    81 St Johns Road Ely Cambridgeshire CB6 3BW

    First floor side and rear extensions, two storey side extension, raised flat roof and single storey front/side extension including canopy

    7 Sep 2026 Full applications