Planning application
26/00214/DISA
35 High Street Sutton Ely Cambridgeshire CB6 2RB
Proposal
To discharge Condition 3 (External Materials) of decision 26/00214/FUL dated 30th April 2026 for demolish existing single storey store and part boundary wall, construct replacement single storey store, extend existing drop kerb to provide two off-street parking spaces
As published by the council, reference 26/00214/DISA
Timeline
Dates from the published record
-
26 May 2026
Received by East Cambridgeshire
-
9 Jul 2026
Decision issued: Condition/s Discharged
-
23 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
21/00838/TPO Decided
72 High Street Sutton Ely Cambridgeshire CB6 2NL
T1 Apple - Ongoing cyclical maintenance pruning T2 Apple - Ongoing cyclical maintenance pruning T3 Cherry - Ongoing cyclical maintenance pruning G4 Damson x2 - Ongoing cyclical maintenance pruning T5 Damson - Ongoing cyclical maintenance pruning T6 Fig - Ongoing cyclical maintenance pruning T7 Medlar - Ongoing cyclical maintenance pruning T8 Blue Cedar - Cut back lower branches to clear weeping Silver Birch and 2x branches overhanging pond T9 Hawthorn - Remove two dead lower branches T10 Walnut - Remove two lower branches to increase crown clearance from ground level
-
21/00838/TRE Decided
72 High Street Sutton Ely Cambridgeshire CB6 2NL
T1 Apple - Ongoing cyclical maintenance pruning T2 Apple - Ongoing cyclical maintenance pruning T3 Cherry - Ongoing cyclical maintenance pruning G4 Damson x2 - Ongoing cyclical maintenance pruning T5 Damson - Ongoing cyclical maintenance pruning T6 Fig - Ongoing cyclical maintenance pruning T7 Medlar - Ongoing cyclical maintenance pruning T8 Blue Cedar - Cut back lower branches to clear weeping Silver Birch and 2x branches overhanging pond T9 Hawthorn - Remove two dead lower branches T10 Walnut - Remove two lower branches to increase crown clearance from ground level
-
21/00808/CLE Granted
10 The Southerns Sutton Ely Cambridgeshire CB6 2PQ
Conversion of existing garage to a kitchen diner (retrospective)
-
23/00063/FUL Granted
1 Foxes Hollow Sutton Ely Cambridgeshire CB6 2FB
Single storey rear extension
-
26/00673/TRE Decided
4 Station Road Sutton Ely Cambridgeshire CB6 2RL
G1 2 x Acer - Crown reduce by a maximum of 1 metre
-
23/00870/DISC Decided
Land Rear Of 30 To 40 Garden Close Sutton Cambridgeshire
To discharge Condition 3 (updated ecological habitat survey) of decision 23/00870/RMM dated 11 March 2024 for reserved matters for outline planning application 18/01053/OUM for 41 residential dwellings including Appearance, Layout Scale and Landscaping, along with parking and open space
Other conditions applications
In East Cambridgeshire
-
19/00179/DISF Decided
Site North Of 39 Church Street Ashley Cambridgeshire CB8 9DU
To discharge Conditions 9 (Fire Hydrants), 18 (Maintenance of shared common areas) and 24 (Welcome Travel Pack) of decision 19/00179/FUM dated 20th April 2020 for Application for 16 residential dwellings (including 40% affordable) comprising two 5xbed houses, one 4xbed house, four 3xbed houses and nine 2xbed houses along with access, car parking, landscaping and associated infrastructu
-
24/00747/DISB Withdrawn
Land Adjacent 43 Mepal Road Sutton Cambridgeshire
To discharge Condition 27 (archaeological excavation report) of decision 24/00747/VARM dated 6 December 2024 to Vary Condition 4 (Assessment of Ground Conditions) of previously approved 19/01707/OUM, dated 12 April 2022 for outline planning application for the demolition of existing buildings and erection of up to 173 dwellings and provision of land for community facilities (sports pitches and burial ground), including access (not internal roads), open space, sustainable urban drainage systems and associated landscaping. All matters reserved apart from access
-
11/01077/DISH Decided
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
To discharge Condition 11 (CEMP & Waste Audit ) 16 (Spine Road Statement ) 26 (Site Access 2) 28 ( Pedestrian Crossing on Lynn Rd) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
-
26/00075/DISA Decided
Riverside Lode Fen Lode Cambridgeshire CB25 9HD
To discharge Conditions 3 (soft landscape) 5 (ecological enhancements scheme) 7 (HMMP) of decision dated 1 May 2026 for 26/00075/FUL Proposed installation of a small-scale ground mounted solar photovoltaic (PV) farm and associated works
-
22/01291/DISA Awaiting decision
Six Oaks Renewable Energy Park Newmarket Road Bottisham Cambridgeshire
To discharge Conditions 3 (CTMP), 4 (Sufficient Vehicle Turning), 7 (Surface Water), 14 (CEMP) and 16(Soft Landscaping) of decision 22/01291/ESF dated (21st December 2023) for installation of a Renewable Energy Park comprising: ground mounted solar panels; access tracks; inverters, transformers; substation and battery energy storage system; customer cabin; underground cables and conduits; perimeter fence; CCTV equipment; temporary construction compound; and associated infrastructure and planting scheme