Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00482/FUL

Land East Of Fenland Glasshouse Energy Centre Ely Road Chittering Cambridge Cambridgeshire

Awaiting decision East Cambridgeshire Full Application

Proposal

Application for the Temporary Retention of 6no. Existing Seasonal Worker Accommodation Units for a Period of 12 Months - retrospective

As published by the council, reference 26/00482/FUL

Timeline

Dates from the published record

  1. 5 May 2026

    Received by East Cambridgeshire

  2. 26 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Cambridgeshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 23/00377/DISF Awaiting decision

    Land North East Of Chear Farm Ely Road Chittering Cambridge Cambridgeshire

    To discharge Condition 10 (surface water drainage) of decision 23/00377/ESF dated 15 December 2023 for construction of glasshouses with integrated packing and distribution unit, combined heat and power (CHP) plant, heat storage tanks, an irrigation centre, employee welfare / canteen, access roads, parking, surface water attenuation lagoon, landscaping and other ancillary development

    20 May 2026 327m away Conditions
  • 26/00012/HAZ Awaiting decision

    Pretoria Energy Co Ltd Padro House Chear Fen Ely Road Chittering Cambridge Cambridgeshire

    Consent to store hazardous substances

    17 Jun 2026 476m away Other

In East Cambridgeshire

  • 26/00578/FUL Granted

    Mulberry House 17A Forehill Ely Cambridgeshire CB7 4AA

    Demolition of existing garage and erection of replacement garage

    28 May 2026 Full applications
  • 26/00443/FUL Granted

    8 Willow Grove Ely Cambridgeshire CB7 4EB

    Demolish existing conservatory, replace with single storey rear extension. Loft conversion with rear dormer and rooflight to front. Part conversion of garage with first floor extension. Outbuilding in rear garden. Ground floor side window. Installation of AC units and PV panels

    23 Apr 2026 Full applications
  • 26/00613/FUL Granted

    17 Barton Close Witchford Ely Cambridgeshire CB6 2HS

    Demolition of conservatory, erection of single-storey rear extension and additional external alterations

    4 Jun 2026 Full applications
  • 26/00519/FUL Granted

    76 High Street Swaffham Bulbeck Cambridge CB25 0LX

    Replacement rear extension and demolition of outbuilding

    14 May 2026 Full applications
  • 26/00809/FUL Awaiting decision

    4 Fordham Road Soham Cambridgeshire CB7 5AQ

    Erection of single storey rear extension

    28 Jul 2026 Full applications