Skip to content
PlanIndex Get alerts
Menu

Planning application

23/00377/DISF

Land North East Of Chear Farm Ely Road Chittering Cambridge Cambridgeshire

Awaiting decision East Cambridgeshire Discharge of Conditions - 6th Submission

Proposal

To discharge Condition 10 (surface water drainage) of decision 23/00377/ESF dated 15 December 2023 for construction of glasshouses with integrated packing and distribution unit, combined heat and power (CHP) plant, heat storage tanks, an irrigation centre, employee welfare / canteen, access roads, parking, surface water attenuation lagoon, landscaping and other ancillary development

As published by the council, reference 23/00377/DISF

Timeline

Dates from the published record

  1. 20 May 2026

    Received by East Cambridgeshire

  2. 23 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with East Cambridgeshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 26/00482/FUL Awaiting decision

    Land East Of Fenland Glasshouse Energy Centre Ely Road Chittering Cambridge Cambridgeshire

    Application for the Temporary Retention of 6no. Existing Seasonal Worker Accommodation Units for a Period of 12 Months - retrospective

    5 May 2026 327m away Full applications

In East Cambridgeshire

  • 19/00179/DISF Decided

    Site North Of 39 Church Street Ashley Cambridgeshire CB8 9DU

    To discharge Conditions 9 (Fire Hydrants), 18 (Maintenance of shared common areas) and 24 (Welcome Travel Pack) of decision 19/00179/FUM dated 20th April 2020 for Application for 16 residential dwellings (including 40% affordable) comprising two 5xbed houses, one 4xbed house, four 3xbed houses and nine 2xbed houses along with access, car parking, landscaping and associated infrastructu

    9 Apr 2026 Conditions
  • 24/00747/DISB Withdrawn

    Land Adjacent 43 Mepal Road Sutton Cambridgeshire

    To discharge Condition 27 (archaeological excavation report) of decision 24/00747/VARM dated 6 December 2024 to Vary Condition 4 (Assessment of Ground Conditions) of previously approved 19/01707/OUM, dated 12 April 2022 for outline planning application for the demolition of existing buildings and erection of up to 173 dwellings and provision of land for community facilities (sports pitches and burial ground), including access (not internal roads), open space, sustainable urban drainage systems and associated landscaping. All matters reserved apart from access

    25 Jul 2025 Conditions
  • 11/01077/DISH Decided

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    To discharge Condition 11 (CEMP & Waste Audit ) 16 (Spine Road Statement ) 26 (Site Access 2) 28 ( Pedestrian Crossing on Lynn Rd) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

    16 Dec 2025 Conditions
  • 26/00075/DISA Decided

    Riverside Lode Fen Lode Cambridgeshire CB25 9HD

    To discharge Conditions 3 (soft landscape) 5 (ecological enhancements scheme) 7 (HMMP) of decision dated 1 May 2026 for 26/00075/FUL Proposed installation of a small-scale ground mounted solar photovoltaic (PV) farm and associated works

    13 May 2026 Conditions
  • 22/01291/DISA Awaiting decision

    Six Oaks Renewable Energy Park Newmarket Road Bottisham Cambridgeshire

    To discharge Conditions 3 (CTMP), 4 (Sufficient Vehicle Turning), 7 (Surface Water), 14 (CEMP) and 16(Soft Landscaping) of decision 22/01291/ESF dated (21st December 2023) for installation of a Renewable Energy Park comprising: ground mounted solar panels; access tracks; inverters, transformers; substation and battery energy storage system; customer cabin; underground cables and conduits; perimeter fence; CCTV equipment; temporary construction compound; and associated infrastructure and planting scheme

    24 Jul 2026 Conditions