Planning application
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
Works: New dwelling
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
(PHASE 3) To discharge Conditions 12 (Green Infrastructure Plan), 23 (Lighting) and 30 (Allotment Fencing Details) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
As published by the council, reference 11/01077/DISM
Application record
- Reference
- 11/01077/DISM
- Type
- Discharge of Condition - 13th Submission
- Status
- Decided
- Decision
- Condition/s Discharged
- Received
- 31 Jul 2026
- Validated
- 31 Jul 2026
- Decided
- 2 Sep 2026
- Ward
- Ely North
- Parish
- Ely
Timeline
Dates from the published record
-
31 Jul 2026
Received by East Cambridgeshire
-
14 Aug 2026
Added to PlanIndex
-
2 Sep 2026
Decision issued: Condition/s Discharged
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
92% historically approved · decision due ~28 Sep
(PHASE TBC) To discharge Condition 27 (Public Transport Infrastructure ) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
Awaiting decision Conditions New dwelling 12 docs -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
92% historically approved · decision due ~17 Sep
'FOR PHASE 3 ONLY'. To discharge Conditions 7 (Broadband Infrastructure Strategy), 11 (Construction Environmental Traffic Management Plan) and 24 (Fire Hydrants) of Planning Permission ref: 11/01077/ESO for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
Awaiting decision Conditions New dwelling 8 docs -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
To discharge Condition 11 (CEMP & Waste Audit ) 16 (Spine Road Statement ) 26 (Site Access 2) 28 ( Pedestrian Crossing on Lynn Rd) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
Decided Conditions New dwelling 34 docs -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
92% historically approved · decision due ~23 Oct
To discharge Conditions 12 (Refuse strategy) and 16 (Boundary Treatments) of decision 25/01206/RMM dated 11th June 2026 for Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO
Awaiting decision Conditions 8 docsMajor scheme -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
To discharge Condition 17 (external materials) of decision dated 11 June 2026 for 25/01206/RMM Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO
Decided Conditions 4 docsMajor scheme -
Street Record Heaton Drive Ely Cambridgeshire CB7 4RS
T4 Norway Maple: Crown lift to 2.5m from ground level. T5 Pear: Remove epicormic growth. T9 Robinia: Remove epicormic growth to 2.5m from ground level. T17 Hornbeam: Crown lift to 3m (over grass) and 5m (over highway) from ground level. T25 Lime: Crown lift over highway to 5m from ground level. T31 Lime: Remove epicormic growth. T32 Lime: Remove epicormic growth. T43 Field Maple: Crown reduce to clear wire by 0.5-1m and remove epicormic growth to 2.5m from ground level. T47 Apple: Crown reduce to clear wire by 1-2m and remove epicormic growth to 2.5m from ground level. T54 Alder: Remove epicormic growth to 2.5m from ground level. T60 Cherry: Crown lift to 2.5m from ground level and crown reduce to clear wire by 1-2m. T136 Field Maple: Remove epicormic growth to 2.5m from ground level.
Granted Trees 6 docs
Other conditions applications
In East Cambridgeshire
-
25/00549/DISB Decided
6 Ditton Green Woodditton Cambridgeshire CB8 9SQ
To discharge Condition 6 (soft landscape) of decision dated 19 September 2025 for 25/00549/RMA Reserved matters for access, appearance, landscaping, layout and scale of previously approved 24/00521/OUT for up to seven new dwellings of mixed scale as well as associated landscaping works and the demolition of the existing dwelling
-
26/00418/DISA Decided
Site East Of 11A Plantation Gate Stretham Cambridgeshire
Discharge of Condition 3 (energy and sustainability strategy) 5 (hard landscaping) 8 (soft landscaping) 11 (Biodiversity improvements) of decision dated 9 June 2026 for 26/00418/VAR To vary condition 1 (Approved Plans) of previously approved 24/00220/FUL for new building to be occupied by GP surgery, link cafe and works units
-
24/01014/DISB Awaiting decision
Site South West Of Berry Green Farm Wood Lane Stretham Cambridgeshire
To discharge Condition 10 (Verification Report) of decision 24/01014/FUL dated 10th January 2025 for Demolition of building and erection of one self-build dwelling, change of use of agricultural land to residential curtilage, and associated works
-
25/00176/DISA Decided
Mepal Outdoor Centre Chatteris Road Mepal Cambridgeshire CB6 2AZ
To discharge Conditions 4 (CEMP) 8 (contamination) 9 (contamination remediation) 17 (ecology) and 18 (LEMP) of decision dated 6 May 2025 ref. 25/00176/VAR3M for To Vary Conditions 1 (Approved Plans), 8 (Contamination), 12 (Sustainability), 13 (Operating Hours), 14 (Use of Function Room), 15 (Hard Landscaping), 16 (External Lighting), 19 (Soft Landscaping), 21 (Tree Protection), 24 (Foul Water Drainage), 25 (Surface Water Drainage), Condition 27 (External Materials), 28 (Flower Court & Function Room), 29 (Boundary Treatments), 31 (Visibility Splays), 34 (Fire Hydrants) and 35 (Delivery Times) for previously approved 21/01216/F3M dated 26 October 2022 for construction of a crematorium and associated service and administration building, function building, memorial garden, natural burial areas, pet cemetery, car parking, new vehicular access from the A142 north of the site and landscaping
-
24/00160/DISF Decided
Site At Anchor Lane Farm Newnham Drove Burwell
To discharge Condition 5 (LEMMP) of decision 24/00160/ESF dated 20th May 2025 for Battery energy storage facility and associated works