Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

Awaiting decision East Cambridgeshire 11/01077/DISL Discharge of Condition - 12th Submission

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

'FOR PHASE 3 ONLY'. To discharge Conditions 7 (Broadband Infrastructure Strategy), 11 (Construction Environmental Traffic Management Plan) and 24 (Fire Hydrants) of Planning Permission ref: 11/01077/ESO for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

As published by the council, reference 11/01077/DISL

Application record

Reference
11/01077/DISL
Type
Discharge of Condition - 12th Submission
Status
Pending Consideration
Received
21 Jul 2026
Validated
23 Jul 2026
Ward
Ely North
Parish
Ely

Site history

Applications at this address on the East Cambridgeshire register

This site has had 10 applications since 2025: 6 approved, 0 refused.

  • 25/01206/NMAA Awaiting decision

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    Non-material amendment to previously approved 25/01206/RMM dated 11/06/2026 for Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO

    Submitted 2 Sep 2026 Amendments
  • 25/01206/DISB Awaiting decision

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    To discharge Conditions 12 (Refuse strategy) and 16 (Boundary Treatments) of decision 25/01206/RMM dated 11th June 2026 for Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO

    Submitted 27 Aug 2026 Conditions
  • 11/01077/DISN Awaiting decision

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    (PHASE 3) To discharge Condition 27 (Public Transport Infrastructure ) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

    Submitted 3 Aug 2026 Conditions
  • 11/01077/DISM Granted

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    (PHASE 3) To discharge Conditions 12 (Green Infrastructure Plan), 23 (Lighting) and 30 (Allotment Fencing Details) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

    Decided 2 Sep 2026 Conditions
  • 25/01206/DISA Granted

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    To discharge Condition 17 (external materials) of decision dated 11 June 2026 for 25/01206/RMM Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO

    Decided 30 Jul 2026 Conditions
  • 11/01077/DISJ Granted

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    Relating to Phase 2 (Spine Road) only: To discharge Conditon 12 (Green Infrastructure Plan) of decision 11/01077/ESO dated 18th June 2015 for residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works.

    Decided 10 Jun 2026 Conditions
  • 11/01077/DISI Granted

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    RELATING TO PHASE 2 (SPINE ROAD) ONLY - To discharge Condition 7 (Broadband Infrastructure Strategy) 18 (Landscaping surveys) 24 (Fire hydrants) 30 (Allotment protection) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

    Decided 8 Jun 2026 Conditions
  • 11/01077/DISH Granted

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    To discharge Condition 11 (CEMP & Waste Audit ) 16 (Spine Road Statement ) 26 (Site Access 2) 28 ( Pedestrian Crossing on Lynn Rd) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

    Decided 27 Jul 2026 Conditions
  • 25/01206/RMM Granted

    Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO

    Decided 11 Jun 2026 Outline

Timeline

Dates from the published record

  1. 21 Jul 2026

    Received by East Cambridgeshire

  2. 23 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 17 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Cambridgeshire took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year East Cambridgeshire decided condition discharge and variation applications in a median of 65 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    11/01077/DISJ Submitted 16 Jan 2026 0m away

    Relating to Phase 2 (Spine Road) only: To discharge Conditon 12 (Green Infrastructure Plan) of decision 11/01077/ESO dated 18th June 2015 for residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works.

    Granted Conditions New dwelling 17 docs
  • Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    11/01077/DISN Submitted 3 Aug 2026 0m away

    99% historically approved · decision due ~28 Sep

    (PHASE 3) To discharge Condition 27 (Public Transport Infrastructure ) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

    Awaiting decision Conditions New dwelling 12 docs
  • Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    11/01077/DISM Submitted 31 Jul 2026 0m away

    (PHASE 3) To discharge Conditions 12 (Green Infrastructure Plan), 23 (Lighting) and 30 (Allotment Fencing Details) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

    Granted Conditions New dwelling 11 docs
  • Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    11/01077/DISH Submitted 16 Dec 2025 6m away

    To discharge Condition 11 (CEMP & Waste Audit ) 16 (Spine Road Statement ) 26 (Site Access 2) 28 ( Pedestrian Crossing on Lynn Rd) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works

    Granted Conditions New dwelling 34 docs
  • Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    25/01206/DISB Submitted 27 Aug 2026 61m away

    99% historically approved · decision due ~23 Oct

    To discharge Conditions 12 (Refuse strategy) and 16 (Boundary Treatments) of decision 25/01206/RMM dated 11th June 2026 for Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO

    Awaiting decision Conditions 8 docs
    Major scheme
  • Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire

    25/01206/RMM Submitted 10 Nov 2025 61m away

    Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO

    Granted Outline 445 docs
    Major scheme

In East Cambridgeshire

  • 26/00963/MPO Awaiting decision

    Site North Of 39 Church Street Ashley Suffolk

    Application for the modification of a planning obligation in the s106 agreement associated with planning permission ref. 19/00179/FUM for Redevelopment of land at Site North Of 39 Church Street Ashley for 16 residential dwellings (including 40% affordable) comprising two 5xbed houses, one 4xbed house, four 3xbed houses and nine 2xbed houses along with access, car parking, landscaping and associated infrastructure

    9 Sep 2026 Conditions
  • 24/01017/DISA Awaiting decision

    27 Carter Road Burwell Cambridgeshire CB25 0DN

    To discharge condition 3 (Asbestos), 14 (Hard Landscape), 18 (Cycle Storage), 20 (Precautionary Working Method Statement) of decision 24/01017/FUL dated 28th March 2025 for Erection of 1No. detached bungalow to the rear of 27 Carter Road

    7 Sep 2026 Conditions
  • 23/00377/DISG Granted

    Land North East Of Chear Farm Ely Road Chittering Cambridge Cambridgeshire

    To discharge Conditions 3 (Surface Water Management) and Condition 10 (Surface Water Drainage) of decision 23/00377/ESF dated 15 December 2023 for construction of glasshouses with integrated packing and distribution unit, combined heat and power (CHP) plant, heat storage tanks, an irrigation centre, employee welfare / canteen, access roads, parking, surface water attenuation lagoon, landscaping and other ancillary development

    13 Aug 2026 Conditions
  • 25/00393/BNGD Withdrawn

    Site At Anchor Lane Farm Newnham Drove Burwell

    To discharge the Biodiversity Net Gain Condition in relation to decision 25/00393/FUM dated 20 March 2026 for Agrivoltaic scheme (capacity 49.95MW) plus associated infrastructure, access roads and landscaping

    12 Jun 2026 Conditions
  • 21/01770/DISD Granted

    Land Adjacent To 8 Hall Barn Road Isleham Cambridgeshire

    To discharge condition 17 (future management and maintenance of the proposed streets) and 18 (archaeology final part) of decision dated 27 April 2024 for 21/01770/VARM To vary condition 1 (approved plans) of previously approved 20/00260/OUM for Erection for 17 dwellings and new access

    11 Jun 2026 Conditions