Planning application
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
Works: New dwelling
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
'FOR PHASE 3 ONLY'. To discharge Conditions 7 (Broadband Infrastructure Strategy), 11 (Construction Environmental Traffic Management Plan) and 24 (Fire Hydrants) of Planning Permission ref: 11/01077/ESO for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
As published by the council, reference 11/01077/DISL
Application record
- Reference
- 11/01077/DISL
- Type
- Discharge of Condition - 12th Submission
- Status
- Pending Consideration
- Received
- 21 Jul 2026
- Validated
- 23 Jul 2026
- Ward
- Ely North
- Parish
- Ely
Site history
Applications at this address on the East Cambridgeshire register
This site has had 10 applications since 2025: 6 approved, 0 refused.
-
25/01206/NMAA Awaiting decision
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
Non-material amendment to previously approved 25/01206/RMM dated 11/06/2026 for Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO
-
25/01206/DISB Awaiting decision
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
To discharge Conditions 12 (Refuse strategy) and 16 (Boundary Treatments) of decision 25/01206/RMM dated 11th June 2026 for Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO
-
11/01077/DISN Awaiting decision
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
(PHASE 3) To discharge Condition 27 (Public Transport Infrastructure ) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
-
11/01077/DISM Granted
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
(PHASE 3) To discharge Conditions 12 (Green Infrastructure Plan), 23 (Lighting) and 30 (Allotment Fencing Details) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
-
25/01206/DISA Granted
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
To discharge Condition 17 (external materials) of decision dated 11 June 2026 for 25/01206/RMM Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO
-
11/01077/DISJ Granted
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
Relating to Phase 2 (Spine Road) only: To discharge Conditon 12 (Green Infrastructure Plan) of decision 11/01077/ESO dated 18th June 2015 for residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works.
-
11/01077/DISI Granted
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
RELATING TO PHASE 2 (SPINE ROAD) ONLY - To discharge Condition 7 (Broadband Infrastructure Strategy) 18 (Landscaping surveys) 24 (Fire hydrants) 30 (Allotment protection) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
-
11/01077/DISH Granted
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
To discharge Condition 11 (CEMP & Waste Audit ) 16 (Spine Road Statement ) 26 (Site Access 2) 28 ( Pedestrian Crossing on Lynn Rd) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
-
25/01206/RMM Granted
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO
Timeline
Dates from the published record
-
21 Jul 2026
Received by East Cambridgeshire
-
23 Jul 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Cambridgeshire took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Cambridgeshire for determination, against a statutory target of eight weeks. Over the last year East Cambridgeshire decided condition discharge and variation applications in a median of 65 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
Relating to Phase 2 (Spine Road) only: To discharge Conditon 12 (Green Infrastructure Plan) of decision 11/01077/ESO dated 18th June 2015 for residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works.
Granted Conditions New dwelling 17 docs -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
99% historically approved · decision due ~28 Sep
(PHASE 3) To discharge Condition 27 (Public Transport Infrastructure ) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
Awaiting decision Conditions New dwelling 12 docs -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
(PHASE 3) To discharge Conditions 12 (Green Infrastructure Plan), 23 (Lighting) and 30 (Allotment Fencing Details) of decision 11/01077/ESO dated 18 June 2015 for Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
Granted Conditions New dwelling 11 docs -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
To discharge Condition 11 (CEMP & Waste Audit ) 16 (Spine Road Statement ) 26 (Site Access 2) 28 ( Pedestrian Crossing on Lynn Rd) of decision dated 18 June 2015 for 11/01077/ESO Residential development, a local centre comprising retail foodstore (A1), uses within Use Classes A1/2/3/4/5, D1 and business units (B1), primary school, pre-school nursery, playing fields, place of worship and/or community hall, together with open space, allotments, landscaping, highways, infrastructure and associated works
Granted Conditions New dwelling 34 docs -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
99% historically approved · decision due ~23 Oct
To discharge Conditions 12 (Refuse strategy) and 16 (Boundary Treatments) of decision 25/01206/RMM dated 11th June 2026 for Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO
Awaiting decision Conditions 8 docsMajor scheme -
Land At High Flyer Farm North Of Kings Avenue Ely Cambridgeshire
Reserved matters for layout, scale, appearance, access and landscaping for 536 dwellings (Phase 3) following outline planning permission 11/01077/ESO
Granted Outline 445 docsMajor scheme
Other condition discharge and variation applications
In East Cambridgeshire
-
26/00963/MPO Awaiting decision
Site North Of 39 Church Street Ashley Suffolk
Application for the modification of a planning obligation in the s106 agreement associated with planning permission ref. 19/00179/FUM for Redevelopment of land at Site North Of 39 Church Street Ashley for 16 residential dwellings (including 40% affordable) comprising two 5xbed houses, one 4xbed house, four 3xbed houses and nine 2xbed houses along with access, car parking, landscaping and associated infrastructure
-
24/01017/DISA Awaiting decision
27 Carter Road Burwell Cambridgeshire CB25 0DN
To discharge condition 3 (Asbestos), 14 (Hard Landscape), 18 (Cycle Storage), 20 (Precautionary Working Method Statement) of decision 24/01017/FUL dated 28th March 2025 for Erection of 1No. detached bungalow to the rear of 27 Carter Road
-
23/00377/DISG Granted
Land North East Of Chear Farm Ely Road Chittering Cambridge Cambridgeshire
To discharge Conditions 3 (Surface Water Management) and Condition 10 (Surface Water Drainage) of decision 23/00377/ESF dated 15 December 2023 for construction of glasshouses with integrated packing and distribution unit, combined heat and power (CHP) plant, heat storage tanks, an irrigation centre, employee welfare / canteen, access roads, parking, surface water attenuation lagoon, landscaping and other ancillary development
-
25/00393/BNGD Withdrawn
Site At Anchor Lane Farm Newnham Drove Burwell
To discharge the Biodiversity Net Gain Condition in relation to decision 25/00393/FUM dated 20 March 2026 for Agrivoltaic scheme (capacity 49.95MW) plus associated infrastructure, access roads and landscaping
-
21/01770/DISD Granted
Land Adjacent To 8 Hall Barn Road Isleham Cambridgeshire
To discharge condition 17 (future management and maintenance of the proposed streets) and 18 (archaeology final part) of decision dated 27 April 2024 for 21/01770/VARM To vary condition 1 (approved plans) of previously approved 20/00260/OUM for Erection for 17 dwellings and new access