Skip to content
PlanIndex Get alerts
Menu

Planning application

25/0431/LB

20 Maunsheugh Road Fenwick East Ayrshire KA3 6DN

Granted East Ayrshire Listed Building

Proposal

Take down wall to sound base, recover sound stone and rebuild as per specification recommended by Scottish Lime Centre Trust (using reclaimed local matching sandstone)

As published by the council, reference 25/0431/LB

Timeline

Dates from the published record

  1. 27 Aug 2025

    Received by East Ayrshire

  2. 23 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 20 Nov 2025

    Decision issued: Approved with Conditions

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 25/0436/LB Granted

    70 Main Road Fenwick East Ayrshire KA3 6DU

    Removal of non-original paint finish from the front facade and reinstatement of traditional exposed sandstone

    1 Sep 2025 192m away Heritage and listed buildings
  • 25/0124/AMCPP Granted

    70 Main Road Fenwick East Ayrshire KA3 6DU

    Discharge of Conditions 2A and 2B of Planning Consent 25/0358/PP (Removal of paint and reinstatement of sandstone finish).

    21 Nov 2025 192m away Conditions
  • 25/0017/AMCLB Granted

    70 Main Road Fenwick East Ayrshire KA3 6DU

    Discharge of Condition 1A, 1B and 1C of Listed Building Consent 25/0436/LB (Removal of non-original paint finish from the front facade and reinstatement of traditional exposed sandstone)

    21 Nov 2025 192m away Conditions
  • 26/0074/TP Granted

    16 Kirkton Road Fenwick Ayrshire KA3 6DH

    Removal of 4no. trees (TPO Reference TPO/5/1988)

    19 Feb 2026 237m away Trees
  • 26/0028/PP Granted

    7 Maunsheugh Road Fenwick East Ayrshire KA3 6AN

    Erection of a garden room (retrospective)

    27 Jan 2026 244m away Full applications
  • 25/0430/PP Granted

    84 Main Road Fenwick East Ayrshire KA3 6DX

    Installation of air sourced heat pump.

    27 Aug 2025 280m away Full applications

In East Ayrshire

  • 26/0111/LB Granted

    Darvel Town Hall 10 - 12 West Main Street Darvel East Ayrshire KA17 0AQ

    Installation of two replacement windows on the rear elevation, with reuse of existing stained glass panels

    11 Mar 2026 Heritage and listed buildings
  • 26/0316/LB Awaiting decision

    48 Main Road Fenwick East Ayrshire KA3 6AL

    Replacement of exisitng flat roof.

    30 Jun 2026 Heritage and listed buildings
  • 26/0209/LB Granted

    61 London Road Kilmarnock East Ayrshire KA3 7AH

    Erection of single storey rear extension and installation of solar panels on rear roof plane (part retrospective)

    1 May 2026 Heritage and listed buildings
  • 26/0058/CA Refused

    33 Main Street Kilmaurs East Ayrshire KA3 2SY

    Demolition of building

    12 Feb 2026 Heritage and listed buildings
  • 26/0247/LB Awaiting decision

    14 Portland Road Kilmarnock East Ayrshire KA1 2BS

    Remove and replace roof slates and internal alterations to form open plan office and meeting room

    22 May 2026 Heritage and listed buildings